← Back
Summer cottage
24 GLOVER STREET
STATEN ISLAND · BIN 5068324
💬 Discuss this project
1930Year Built
1Stories
A6Building Class
R3-1Zoning
504 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
Summer cottage · 2,500 sf lot · 0.2 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
THE OWNER OF103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AH ARCHITECTURE PLLC206/15/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HTX BUILDING CONSULTING103/21/2026
Building Lifecycle
All (27)Filed (2)Violation (3)Objection (5)Special Inspection (17)
08/18/2026
Objection resolved — Resolved
07/21/2026
Violation issued (ECB, open)
Construction
06/30/2026
Objection raised — Scope
06/15/2026
Filed — Alteration
interior and exterior renovation of existing building as per plans , no change in use, egress or occupancy
S01413895-I1
03/20/2026
Objection raised — Zoning
03/20/2026
Objection raised — Zoning
02/20/2026
Objection raised — Scope
02/05/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
ENLARGEMENT OF AND EXISITNG 1 FAMILY 1 FLOOR BUILDING TO BECOME 2 STORY BUILDING , OBTAIN NEW C/O
S01329604-I1
02/02/2026
Special inspection requirement — Permanent certificate
01/29/2026
Special inspection requirement — Fire-Resistance Rated Construction
01/29/2026
Special inspection requirement — Energy Code Compliance Inspections
12/15/2025
Special inspection requirement — Lighting in dwelling units
12/15/2025
Special inspection requirement — Fenestration air leakage
12/15/2025
Special inspection requirement — Insulation placement and R values
12/15/2025
Special inspection requirement — Maintenance information
12/15/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
12/15/2025
Special inspection requirement — Interior lighting power
12/15/2025
Special inspection requirement — Metering
12/15/2025
Special inspection requirement — Lighting controls
12/15/2025
Special inspection requirement — Fenestration areas
12/15/2025
Special inspection requirement — Air barrier — testing
12/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/15/2025
Special inspection requirement — Air barrier - visual inspection
12/15/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
12/15/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
08/12/1998
Violation issued (ECB, closed)
Construction
01/14/1998
Violation issued (ECB, closed)
Construction
Nothing on file for this building.
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
02/02/2026Permanent certificate—energy_progress
01/29/2026Fire-Resistance Rated Construction—progress
01/29/2026Energy Code Compliance Inspections—progress
12/15/2025Lighting in dwelling units—energy_progress
12/15/2025Fenestration air leakage—energy_progress
12/15/2025Insulation placement and R values—energy_progress
12/15/2025Maintenance information—energy_progress
12/15/2025Fenestration and door U-factor and product ratings—energy_progress
12/15/2025Interior lighting power—energy_progress
12/15/2025Metering—energy_progress
12/15/2025Lighting controls—energy_progress
12/15/2025Fenestration areas—energy_progress
12/15/2025Air barrier — testing —energy_progress
12/15/2025Fire-Resistant Penetrations and Joints—special
12/15/2025Air barrier - visual inspection—energy_progress
12/15/2025Structural Stability – Alterations of existing buildings—special
12/15/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)—special
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/17/2026S01329604-I1Request digital key ↗
08/15/2026S01413895-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S01329604-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S01329604-I1Open ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/17/2026S01329604-I1Open ↗
08/16/2026S01413895-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/17/2026S01329604-I1Open ↗
08/15/2026S01413895-I1Open ↗
▸Other Documents1
▸DOB NOWSite Survey: Initial1
08/13/2026S01329604-I1Open ↗