← Back
BuildNYC
Elevator cooperative
24 GRAMERCY PARK SOUTH
MANHATTAN · Gramercy · BIN 1017932
💬 Discuss this project
1909Year Built
12Stories
D4Building Class
R7BZoning
49,015 sfGross Floor Area
19Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SWARMPFDNY Report ↗
Elevator cooperative · Owner of record: 24 Gramercy Park · 5,800 sf lot · 8.45 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsJerrick Associates, INC.Under Construction1 filing
RoofJ&c Lamb Management CORP.1p · 1 filing · 8 docs
Floor 121 filing · 12 docs
Floor 11Unit 11S3p · 2 filings · 12 docs
Floor 10J&c Lamb Management CORP.2 filings · 12 docs
Floor 9Unit 9SUnder Construction1p · 1 filing · 10 docs
Floor 8Unit 8Under Construction1p · 1 filing · 10 docs
Floor 7
Floor 6
Floor 5
Floor 4Unit 4W1p · 1 filing · 10 docs
Floor 3Unit 31 filing · 10 docs
Floor 2
Floor 1
Site & exteriorJerrick Associates, INC.Under Construction4 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
24 Gramercy Park Co5503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Paul Perdek, Professional Engineering612/16/2025
Spar Unlimited104/16/2025
Gne Architecture404/04/2025
Nicholas Deramo Architect411/12/2021
CES Engineering108/11/2021
Scalar Architecture112/04/2017
Baileys Engineering111/30/2017
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution1603/21/2026
Boutiqkey803/21/2026
Rite One Expediting203/21/2026
Kelley Design303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Jerrick AssociatesScaffold1207/08/2026
Dynamic ElectricalElectrical303/21/2026
KNG Construction CoGeneral Contractor308/12/2026
Premier Flow Plumbing and HeatingPlumbing207/08/2026
Highline Construction GRGeneral Contractor207/08/2026
Everyday MechanicalPlumbing107/08/2026
M&G Plumbing and HeatingPlumbing107/08/2026
Jerrick AssociatesGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Spar Unlimited5967104/16/2025
CES Engineering1277108/11/2021
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 9, sub-cycle A)
The filing window opened 02/21/2025. No Cycle 9 filing on record yet
09/24/2026
Elevator Category 1 inspection report filed
08/11/2026
Permit renewed — General Construction
Renewed without changes
M01199412-I1-GC
07/29/2026
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
M01029746-I1-GC
05/26/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
161 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedKNG Construction Co08/11/2026
DOB NOWGeneral ConstructionPermit IssuedKNG Construction Co05/15/2026
DOB NOWSuspended ScaffoldPermit IssuedJerrick Associates03/19/2026
DOB NOWPlumbingPermit IssuedM&G Plumbing and Heating03/17/2026
DOB NOWGeneral ConstructionPermit IssuedKNG Construction Co03/10/2026
DOB NOWSupported ScaffoldPermit IssuedGE 2A Construction01/29/2026
DOB NOWSidewalk ShedPermit IssuedGE 2A Construction01/20/2026
DOB NOWGeneral ConstructionPermit IssuedGE 2A Construction07/29/2025
DOB NOWSuspended ScaffoldPermit IssuedJerrick Associates06/10/2025
DOB NOWSupported ScaffoldPermit IssuedGE 2A Construction01/29/2025
DOB NOWSidewalk ShedPermit IssuedGE 2A Construction01/24/2025
DOB NOWMechanical SystemsSigned-offHighline Construction GR10/03/2022
DOB NOWPlumbingSigned-offEveryday Mechanical03/23/2022
DOB NOWMechanical SystemsSigned-offHighline Construction GR12/01/2021
DOB NOWPlumbingSigned-offGalicja Plumbing and Heating04/06/2021
DOB NOWPlumbingSigned-offGalicja Plumbing and Heating07/16/2020
DOB NOWSidewalk ShedSigned-offGE 2A Construction04/11/2018
DOB NOWSupported ScaffoldSigned-offGE 2A Construction04/11/2018
DOB NOWSupported ScaffoldSigned-offGE 2A Construction12/04/2017
DOB NOWSidewalk ShedSigned-offGE 2A Construction11/30/2017
BISPLISSUEDHI-Tech Plumbing & Heating10/03/2025
BISPLISSUEDRRP Plumbing02/24/2021
BISOTISSUEDHighline Construction GR02/02/2021
BISOTISSUEDHighline Construction GR10/02/2020
BISOTISSUEDHighline Construction GR06/30/2020
BISPLISSUEDHI-Tech Plumbing & Heating06/24/2019
BISMHISSUEDMarkay Renovations06/24/2019
BISMHISSUEDHighline Construction GR10/11/2018
BISOTISSUEDHighline Construction GR10/11/2018
BISPLISSUEDRRP Plumbing09/14/2018
BISPLISSUEDPremier Flow Plumbing and Heating03/19/2018
BISOTISSUEDJerrick Associates03/01/2018
BISOTISSUEDHighline Construction GR12/13/2017
BISMHISSUEDHighline Construction GR12/13/2017
BISPLISSUEDChamp Plumbing & Heating04/05/2017
BISMHISSUEDChampion Combustion04/05/2017
BISPLISSUEDAlklem Plumbing07/11/2013
BISOTISSUEDAlklem Plumbing07/11/2013
BISEQISSUEDSpring Scaffolding06/03/2013
BISPLISSUEDDonato04/14/2011
+ 30 more permits on file
1 project · most recent 04/04/2025
Gas Water/Sanitary
FiledStatusContractorScope
04/04/2025Permit IssuedM&G Plumbing and HeatingGas, Water/Sanitary
5 projects · most recent 03/18/2026
General Wiring Lighting
FiledStatusContractorScope
03/18/2026Permit IssuedIndy ElectricGeneral Wiring
01/17/2025Permit IssuedMega Electrical Contracting—
10/05/2021CompleteInfinity ElectricGeneral Wiring
02/10/2020CompleteKGB Electrical ContractingGeneral Wiring
02/14/2019CompleteEco Electrical ServcsGeneral Wiring, Lighting
2 projects · most recent 12/16/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
12/16/2025Permit IssuedJerrick AssociatesScaffold
10/16/2025Permit IssuedJerrick AssociatesSidewalk Shed
1 project · most recent 05/20/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
05/20/2025Permit IssuedJerrick AssociatesSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/26/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/01/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/31/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/12/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/06/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
03/22/2025FinalGreg Epsteinprogress
03/14/2025FinalSCOTT PROFETAprogress
03/14/2025MasonrySCOTT PROFETAspecial
03/14/2025Structural Stability – Alterations of existing buildingsSCOTT PROFETAspecial
03/14/2025Tenant Protection Plan ComplianceSCOTT PROFETAspecial
06/15/2021HVAC-R and service water heating system controlsPeter Vottoenergy_progress
06/15/2021Duct leakage testing, insulation and designPeter Vottoenergy_progress
06/15/2021Maintenance informationPeter Vottoenergy_progress
06/15/2021Mechanical SystemsDelbert Smithspecial
06/15/2021Fire-Resistant Penetrations and JointsDelbert Smithspecial
06/15/2021FinalPeter Vottoprogress
06/15/2021HVAC-R and service water piping design and insulationPeter Vottoenergy_progress
11/22/2017FinalPAUL BAILEYprogress
11/22/2017FinalJULIO SALCEDO-FERNANDEZprogress
358 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account