← Back
Bungalow colony - cooperatively owned land
217-02 BREEZY POINT BLVD
QUEENS · BIN 4466597
💬 Discuss this project
1938Year Built
1Stories
A8Building Class
R4Zoning
1,600,000 sfGross Floor Area
1,906Units
LL97 Covered60 Open Violations 2 unresolved · 58 paperwork only ▸FDNY Report ↗
Bungalow colony - cooperatively owned land · Owner of record: BREEZY POINT COOPERATIVE, INC · 12,253,428 sf lot · 0.13 FAR built · Flood zone X500
Locations of Work
StructuralElectrical
Floor 32p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BREEZY POINT COOPERATIVE, INC.2507/08/2026
SAND BAR CONTRACTORS103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CMC DESIGN ARCHITECT, P.C.503/13/2026
PARKER AND WEST ENGINEERING, PLLC106/06/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
AC BUILDING CONSULTANTS1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SAND-BAR CONTRACTORS INCGeneral Contractor507/08/2026
SIMPLY STRONG CONSTRUCTGeneral Contractor303/21/2026
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
JOSEPH O'GRADY P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CMC DESIGN ARCHITECT, P.C2984403/13/2026
PARKER AND WEST ENGINEERI5272106/06/2024
Building Lifecycle
All (80)Filed (7)Permit Issued (7)Signed Off (4)Violation (1)Inspection (9)Objection (22)Special Inspection (30)
04/17/2026
Objection resolved — Resolved
04/17/2026
Objection resolved — Resolved
03/25/2026
Objection raised — Zoning
03/25/2026
Objection raised — Structural
03/13/2026
Filed — New Building
Proposed 3 story, 1 family new building.
Q00834999-P2
02/24/2026
Special inspection requirement — Ventilation and air distribution system
Gary Lenhart
02/24/2026
Special inspection requirement — Concrete - Cast-In-Place
Gary Lenhart
02/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gary Lenhart
02/24/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Gary Lenhart
02/24/2026
Special inspection requirement — Subgrade Inspections
Gary Lenhart
02/24/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
02/24/2026
Special inspection requirement — Wood – Prefabricated I-Joists
Gary Lenhart
02/24/2026
Special inspection requirement — Energy Code Compliance Inspections
Gary Lenhart
02/24/2026
Special inspection requirement — Final
Gary Lenhart
02/24/2026
Special inspection requirement — Fire-Resistance Rated Construction
Gary Lenhart
02/24/2026
Special inspection requirement — Footing and Foundation
Gary Lenhart
02/24/2026
Special inspection requirement — Lowest Floor Elevation
Gary Lenhart
02/24/2026
Special inspection requirement — Air barrier — testing
Gary Lenhart
02/24/2026
Special inspection requirement — Maintenance information
Gary Lenhart
02/24/2026
Special inspection requirement — Insulation placement and R values
Gary Lenhart
02/24/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Gary Lenhart
02/24/2026
Special inspection requirement — Fireplaces
Gary Lenhart
02/24/2026
Special inspection requirement — HVAC-R and service water heating system controls
Gary Lenhart
02/24/2026
Special inspection requirement — Fenestration air leakage
Gary Lenhart
02/24/2026
Special inspection requirement — HVAC-R and service water heating equipment
Gary Lenhart
02/24/2026
Special inspection requirement — Permanent certificate
Gary Lenhart
02/24/2026
Special inspection requirement — Interior lighting power
Gary Lenhart
02/24/2026
Special inspection requirement — Metering
Gary Lenhart
02/24/2026
Special inspection requirement — Air barrier - visual inspection
Gary Lenhart
02/24/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Gary Lenhart
02/24/2026
Special inspection requirement — Fenestration areas
Gary Lenhart
02/24/2026
Special inspection requirement — Electric vehicle service equipment requirements
Gary Lenhart
05/28/2025
Signed off — New Building
Proposed 3 story, 1 family new building.
Q00834999-S2
05/28/2025
Signed off — New Building
Proposed 3 story, 1 family new building.
Q00834999-S1
05/20/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/17/2025
Filed — New Building
Proposed 3 story, 1 family new building.
Q00834999-P1
03/14/2025
Special inspection requirement — Fenestration air leakage
Gary Lenhart
03/14/2025
Special inspection requirement — HVAC-R and service water heating equipment
Gary Lenhart
03/14/2025
Special inspection requirement — Air barrier - visual inspection
Gary Lenhart
11/06/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/29/2024
Signed off — Alteration
Q01061295-I1
06/14/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/07/2024
Permit issued — Solar
Q01061295-I1-SL
06/06/2024
Filed — Alteration
Q01061295-I1
02/02/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/02/2024
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
02/02/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/02/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/30/2024
Violation issued (ECB, closed)
Construction
01/26/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/23/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/28/2023
Permit issued — Plumbing
Q00834999-S2-PL
10/26/2023
Signed off — Full Demolition
Hand demolition of a 1 story house.
Q00901077-I1
10/03/2023
Permit issued — Full Demolition
Q00901077-I1-FD
08/30/2023
Permit issued — Construction Fence
Q00834999-S1-FN
08/30/2023
Permit issued — Foundation
Q00834999-I1-GC
08/30/2023
Permit issued — General Construction
Q00834999-I1-EA
08/30/2023
Permit issued — General Construction
Q00834999-I1-FO
08/30/2023
Objection resolved — Addressed
08/17/2023
Objection resolved — Addressed
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC06/07/2024
DOB NOWPlumbingSigned-offJOSEPH O'GRADY P & H INC11/28/2023
DOB NOWFull DemolitionSigned-offSIMPLY STRONG CONSTRUCT10/03/2023
DOB NOWConstruction FenceSigned-offSAND-BAR CONTRACTORS INC08/30/2023
DOB NOWFoundationPermit IssuedSAND-BAR CONTRACTORS INC08/30/2023
DOB NOWGeneral ConstructionSigned-offSAND-BAR CONTRACTORS INC08/30/2023
DOB NOWGeneral ConstructionSigned-offSAND-BAR CONTRACTORS INC08/30/2023
1 project · most recent 03/13/2026
Sprinkler System
FiledStatusContractorScope
03/13/2026——Sprinkler System
1 project · most recent 03/13/2026
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
03/13/2026Signed-offJOSEPH O'GRADY P & H INCGas, Plumbing-Sprinkler, Water/Sanitary
3 projects · most recent 11/13/2025
General Wiring
FiledStatusContractorScope
11/13/2025CompletePAPPAS & FODERA ELECT'L—
11/15/2024CompletePAPPAS & FODERA ELECT'LGeneral Wiring
06/06/2024CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 03/13/2026
FiledStatusContractorScope
03/13/2026Signed-offJOSEPH O'GRADY P & H INC4 scope_items
1 project · most recent 03/13/2026
Earthwork
FiledStatusContractorScope
03/13/2026Signed-offJOSEPH O'GRADY P & H INCEarthwork
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
05/20/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/06/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/14/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/02/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/02/2024Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
02/02/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/02/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/26/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/23/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 59
DateRequirementInspectorRole
02/24/2026Ventilation and air distribution systemGary Lenhartenergy_progress
02/24/2026Concrete - Cast-In-PlaceGary Lenhartspecial
02/24/2026Fire-Resistant Penetrations and JointsGary Lenhartspecial
02/24/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Gary Lenhartspecial
02/24/2026Subgrade InspectionsGary Lenhartspecial
02/24/2026Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
02/24/2026Wood – Prefabricated I-JoistsGary Lenhartspecial
02/24/2026Energy Code Compliance InspectionsGary Lenhartprogress
02/24/2026FinalGary Lenhartprogress
02/24/2026Fire-Resistance Rated ConstructionGary Lenhartprogress
02/24/2026Footing and FoundationGary Lenhartprogress
02/24/2026Lowest Floor ElevationGary Lenhartprogress
02/24/2026Air barrier — testing Gary Lenhartenergy_progress
02/24/2026Maintenance informationGary Lenhartenergy_progress
02/24/2026Insulation placement and R valuesGary Lenhartenergy_progress
02/24/2026HVAC-R and service water piping design and insulationGary Lenhartenergy_progress
02/24/2026FireplacesGary Lenhartenergy_progress
02/24/2026HVAC-R and service water heating system controlsGary Lenhartenergy_progress
02/24/2026Fenestration air leakageGary Lenhartenergy_progress
02/24/2026HVAC-R and service water heating equipmentGary Lenhartenergy_progress
02/24/2026Permanent certificateGary Lenhartenergy_progress
02/24/2026Interior lighting powerGary Lenhartenergy_progress
02/24/2026MeteringGary Lenhartenergy_progress
02/24/2026Air barrier - visual inspectionGary Lenhartenergy_progress
02/24/2026Fenestration and door U-factor and product ratingsGary Lenhartenergy_progress
Latest 25 of 59.
▾Documents — 61 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/24/2026Q00901077-I1Request digital key ↗
08/22/2026Q01061295-I1Request digital key ↗
08/17/2026Q00834999-S1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00834999-P2Open ↗
08/13/2026Q00834999-P1Open ↗
08/13/2026Q00834999-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00834999-I1Open ↗
▸Seals & Professional Certifications26
▸DOB NOWProgress Inspector Seal & Signature11
09/02/2026Q00834999-P1Open ↗
09/02/2026Q00834999-P1Open ↗
09/02/2026Q00834999-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/02/2026Q00834999-P1Open ↗
09/02/2026Q00834999-P1Open ↗
09/02/2026Q00834999-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/17/2026Q00834999-P2Open ↗
08/17/2026Q00834999-S2Open ↗
08/17/2026Q00834999-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWCONTRACTOR SEAL & SIGNATURE1
08/13/2026Q00901077-I1Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWElectric Cut-Off1
08/13/2026Q00901077-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026Q00901077-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026Q00901077-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026Q00901077-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q00901077-I1Open ↗
08/13/2026Q00901077-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026Q00901077-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/13/2026Q00834999-P1Open ↗
08/13/2026Q00834999-I1Open ↗
08/13/2026Q00834999-P2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00834999-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01061295-I1Open ↗
▸Other Documents12
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00834999-P2Open ↗
08/13/2026Q00834999-I1Open ↗
08/13/2026Q00834999-P1Open ↗
▸DOB NOWSite Survey: Initial3
08/13/2026Q00834999-P1Open ↗
08/13/2026Q00834999-I1Open ↗
08/13/2026Q00834999-P2Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026Q00901077-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026Q00901077-I1Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/13/2026Q00834999-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00834999-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026Q00901077-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026Q00901077-I1Open ↗