← Back
BuildNYC
Old law tenement
24 WEST 132ND STREET
MANHATTAN · BIN 1053857
💬 Discuss this project
1910Year Built
5Stories
C4Building Class
R7-2Zoning
9,285 sfGross Floor Area
10Units
Rent Stabilized2 Active Violations ▸
Old law tenement · Owner of record: Restoring Communities Housing Development Fund C Orp · 2,498 sf lot · 3.72 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofMechanical work, typical floors and roof53p · 4 filings · 20 docs
Bulkhead3p · 1 filing · 14 docs
Floor 5Mechanical work, typical floors and roof45p · 4 filings · 20 docs
Floor 4Mechanical work, typical floors and roof45p · 4 filings · 20 docs
Floor 3Mechanical work, typical floors and roof45p · 4 filings · 20 docs
Floor 2Unit 2E, Unit 2W51p · 4 filings · 20 docs
Floor 1Unit 1W53p · 5 filings · 20 docs
CellarMechanical work, typical floors and roof52p · 5 filings · 20 docs
Site & exteriorSidewalk shed installation41p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Housing Preservation and Development1107/08/2026
Restoring Communities HDFC303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rosenthal1308/17/2023
Old Structures Engineering209/28/2021
Ashraf207/07/2021
Haider Engineering, P.E104/25/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB Building Consulting3003/21/2026
Rigid Structural Design203/21/2026
Haider Engineering, P.E103/21/2026
Haider Engineering P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Intersystem InstallationScaffold607/08/2026
Erin Construction & DevelopmentGeneral Contractor403/21/2026
Watson's Plumbing, Heating, & BuildingPlumbing307/08/2026
Expert Fire SprinklerFire Protection207/08/2026
Mark Contracting NYScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M. Hamdi Gunal, PE30001103/13/2023
Building Lifecycle
All (143)Filed (18)Permit Issued (12)Signed Off (8)Violation (60)Inspection (7)Objection (8)Special Inspection (30)
04/29/2026
Violation issued (HPD, open)
A
06/04/2025
Violation issued (HPD, open)
A
04/02/2024
Violation issued (HPD, closed)
A
09/19/2023
Signed off — Alteration
PROPOSE PLUMBING SCOPE OF WORK FILED IN CONJUNCTION WITH ALT 1 # 121205971.
M00221240-I1
09/06/2023
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00152194-I1
08/28/2023
Signed off — Alteration
Propose to install (2) two new gas fired boilers filed in conjunction with Alt 1 # 121205971.
M00236021-I1
08/24/2023
Signed off — Alteration
SEPARATE FILING FOR MECHANICAL SCOPE OF WORK FILED IN CONJUNCTION WITH ALT I #121205971
M00215293-I1
08/17/2023
Filed — Alteration
PROPOSE PLUMBING SCOPE OF WORK FILED IN CONJUNCTION WITH ALT 1 # 121205971.
M00221240-P4
08/10/2023
Special inspection requirement — HVAC insulation and sealing
Mehmet Gunal
08/07/2023
Signed off — Alteration
PROPOSE INSTALLATION OF AUTOMATIC SPRINKLER SYSTEM IN CONJUNCTION WITH ALT I APPLICATION # 121205971.
M00220085-I1
06/08/2023
Signed off — Alteration
M00236088-I1
05/25/2023
Objection resolved — Addressed
05/23/2023
Objection raised — Other
05/22/2023
Filed — Alteration
PROPOSE PLUMBING SCOPE OF WORK FILED IN CONJUNCTION WITH ALT 1 # 121205971.
M00221240-P3
05/19/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
05/17/2023
Permit issued — Structural
M00236088-I1-ST
05/16/2023
Permit issued — Mechanical Systems
M00215293-I1-MS
05/08/2023
Permit issued — Boiler Equipment
M00236021-I1-BE
05/03/2023
Special inspection requirement — Final
Mehmet Gunal
05/03/2023
Special inspection requirement — Masonry
Mehmet Gunal
05/03/2023
Special inspection requirement — Structural Steel - Details
Mehmet Gunal
05/03/2023
Special inspection requirement — Concrete - Cast-In-Place
Mehmet Gunal
05/03/2023
Special inspection requirement — Structural Steel - High Strength Bolting
Mehmet Gunal
05/03/2023
Special inspection requirement — Structural Cold-Formed Steel
Mehmet Gunal
05/03/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mehmet Gunal
05/03/2023
Special inspection requirement — Structural Steel - Welding
Mehmet Gunal
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/24/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/04/2023
Special inspection requirement — HVAC and service water heating system controls
Mehmet Gunal
04/04/2023
Special inspection requirement — Maintenance information
Mehmet Gunal
04/04/2023
Special inspection requirement — HVAC and service water heating equipment
Mehmet Gunal
04/04/2023
Special inspection requirement — Heating Systems
Mehmet Gunal
04/04/2023
Special inspection requirement — Shutoff dampers
Mehmet Gunal
03/22/2023
Special inspection requirement — Mechanical Systems
Mehmet Gunal
03/22/2023
Special inspection requirement — Final
Mehmet Gunal
03/22/2023
Special inspection requirement — Fire-Resistance Rated Construction
Mehmet Gunal
03/22/2023
Special inspection requirement — Energy Code Compliance Inspections
Mehmet Gunal
03/22/2023
Special inspection requirement — Electrical motors
Mehmet Gunal
03/22/2023
Special inspection requirement — HVAC insulation and sealing
Mehmet Gunal
03/22/2023
Special inspection requirement — HVAC and service water heating equipment
Mehmet Gunal
03/22/2023
Special inspection requirement — Maintenance information
Mehmet Gunal
03/22/2023
Special inspection requirement — Shutoff dampers
Mehmet Gunal
03/22/2023
Special inspection requirement — HVAC and service water heating system controls
Mehmet Gunal
03/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mehmet Gunal
03/22/2023
Special inspection requirement — Heating Systems
Mehmet Gunal
03/16/2023
Violation issued (HPD, closed)
A
03/14/2023
Objection raised — Other
03/14/2023
Objection resolved — Addressed
03/14/2023
Objection raised — Other
03/14/2023
Objection resolved — Addressed
03/13/2023
Filed — Alteration
PROPOSE PLUMBING SCOPE OF WORK FILED IN CONJUNCTION WITH ALT 1 # 121205971.
M00221240-P2
03/13/2023
Filed — Alteration
SEPARATE FILING FOR MECHANICAL SCOPE OF WORK FILED IN CONJUNCTION WITH ALT I #121205971
M00215293-P2
03/13/2023
Filed — Alteration
PROPOSE INSTALLATION OF AUTOMATIC SPRINKLER SYSTEM IN CONJUNCTION WITH ALT I APPLICATION # 121205971.
M00220085-P2
03/13/2023
Permit issued — Sprinklers
M00220085-I1-EW-SP
03/09/2023
Special inspection requirement — Maintenance information
Mehmet Gunal
03/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mehmet Gunal
03/09/2023
Special inspection requirement — Heating Systems
Mehmet Gunal
03/09/2023
Special inspection requirement — Mechanical Systems
Mehmet Gunal
12/30/2022
Signed off — Alteration
M00552744-I1
12/30/2022
Signed off — Alteration
M00552753-I1
Latest 60 of 143 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offErin Construction & Development05/17/2023
DOB NOWMechanical SystemsSigned-offErin Construction & Development05/16/2023
DOB NOWBoiler EquipmentSigned-offWatson's Plumbing, Heating, & Building05/08/2023
DOB NOWSprinklersSigned-offExpert Fire Sprinkler03/13/2023
DOB NOWPlumbingSigned-offWatson's Plumbing, Heating, & Building11/04/2022
DOB NOWSidewalk ShedSigned-offIntersystem Installation08/19/2022
DOB NOWSprinklersSigned-offExpert Fire Sprinkler01/31/2022
DOB NOWPlumbingSigned-offWatson's Plumbing, Heating, & Building11/04/2021
DOB NOWSidewalk ShedSigned-offIntersystem Installation08/17/2021
DOB NOWSidewalk ShedSigned-offIntersystem Installation07/07/2021
DOB NOWSupported ScaffoldSigned-offIntersystem Installation07/07/2021
DOB NOWSidewalk ShedSigned-offMark Contracting NY04/25/2019
BIS—ISSUEDErin Construction & Development09/01/2023
BIS—ISSUEDErin Construction & Development09/08/2022
BIS—ISSUEDErin Construction & Development09/13/2021
BIS—ISSUEDErin Construction & Development07/07/2021
BISOTISSUEDMark Contracting NY02/05/2020
BISBLISSUEDNuway Fueloil Burner07/23/2001
BISOTISSUEDBC Construction Co05/04/2001
BISOTISSUEDA Taher Contracting12/20/2000
BISEQISSUEDA Taher Contracting12/20/2000
3 projects · most recent 07/22/2021
General Wiring
FiledStatusContractorScope
07/22/2021CompleteRamdeen's Electric ContractingGeneral Wiring
06/28/2021CompleteSteven Farkas—
04/08/2019CompleteRichard Neu—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
05/19/2023Pass-Final Boiler Equipment InspectionPassView ↗
04/24/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/18/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/18/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/14/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/21/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/21/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 57
DateRequirementInspectorRole
08/10/2023HVAC insulation and sealing Mehmet Gunalenergy_progress
05/03/2023FinalMehmet Gunalprogress
05/03/2023MasonryMehmet Gunalspecial
05/03/2023Structural Steel - DetailsMehmet Gunalspecial
05/03/2023Concrete - Cast-In-PlaceMehmet Gunalspecial
05/03/2023Structural Steel - High Strength BoltingMehmet Gunalspecial
05/03/2023Structural Cold-Formed SteelMehmet Gunalspecial
05/03/2023Structural Stability – Alterations of existing buildingsMehmet Gunalspecial
05/03/2023Structural Steel - WeldingMehmet Gunalspecial
04/04/2023HVAC and service water heating system controls Mehmet Gunalenergy_progress
04/04/2023Maintenance informationMehmet Gunalenergy_progress
04/04/2023HVAC and service water heating equipment Mehmet Gunalenergy_progress
04/04/2023Heating SystemsMehmet Gunalspecial
04/04/2023Shutoff dampersMehmet Gunalenergy_progress
03/22/2023Mechanical SystemsMehmet Gunalspecial
03/22/2023FinalMehmet Gunalprogress
03/22/2023Fire-Resistance Rated ConstructionMehmet Gunalprogress
03/22/2023Energy Code Compliance InspectionsMehmet Gunalprogress
03/22/2023Electrical motorsMehmet Gunalenergy_progress
03/22/2023HVAC insulation and sealing Mehmet Gunalenergy_progress
03/22/2023HVAC and service water heating equipment Mehmet Gunalenergy_progress
03/22/2023Maintenance informationMehmet Gunalenergy_progress
03/22/2023Shutoff dampersMehmet Gunalenergy_progress
03/22/2023HVAC and service water heating system controls Mehmet Gunalenergy_progress
03/22/2023Fire-Resistant Penetrations and JointsMehmet Gunalspecial
Latest 25 of 57.
▾Documents — 152 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch - Plumbing5
09/05/2026M00221240-P4Request digital key ↗
09/05/2026M00221240-I1Request digital key ↗
09/05/2026M00221240-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/05/2026M00215293-P2Request digital key ↗
09/05/2026M00215293-I1Request digital key ↗
09/05/2026M00215293-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler3
09/03/2026M00220085-I1Request digital key ↗
08/14/2026M00220085-P1Request digital key ↗
08/14/2026M00220085-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment2
09/03/2026M00236021-I1Request digital key ↗
09/03/2026M00236021-P1Request digital key ↗
▸DOB NOWPlans/Sketch2
09/03/2026M00552744-I1Request digital key ↗
09/03/2026M00552753-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
09/03/2026M00236088-I1Request digital key ↗
08/15/2026M00236088-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00152194-I1Request digital key ↗
▸Applications & Permits11
▸BISPLAN / WORK APPROVAL APPLICATION7
03/13/2024140858427Open ↗
01/23/2024102963063Open ↗
12/21/2023121205971Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION3
07/07/2021121205971Open ↗
07/16/2019140858427Open ↗
07/12/2019140858427Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
01/17/2023121205971Open ↗
▸Seals & Professional Certifications39
▸DOB NOWDPL-1: Design Professional Seal & Signature18
09/05/2026M00152194-I1Open ↗
09/05/2026M00215293-P1Open ↗
09/05/2026M00215293-P2Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
10/04/2026M00221240-P4Open ↗
09/23/2026M00236021-I1Open ↗
09/02/2026M00236021-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/23/2026M00236021-I1Open ↗
09/02/2026M00236021-P1Open ↗
08/31/2026M00236088-I1Open ↗
Showing 3 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/12/2019140858427Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/12/2019140858427Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/12/2019140858427Open ↗
▸Trade Schedules & Equipment2
▸BISFA - FDNY APPROVAL : FD-FAA1
03/14/2024121205971Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
03/14/2024121205971Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
09/30/2019121205971Open ↗
08/30/2019121205971Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
07/12/2019140858427Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
09/05/2026M00215293-I1Open ↗
09/05/2026M00221240-I1Open ↗
09/03/2026M00236021-I1Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORM PRIOR TO SIGNOFF.1
01/08/2024121205971Open ↗
▸BISASBESTOS: VARIANCE (DEP FORM V5)1
07/07/2021121205971Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/12/2019140858427Open ↗
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
03/14/2024121205971Open ↗
07/07/2021121205971Open ↗
08/30/2019121205971Open ↗
Showing 3 of 5 on file for this type
▸BISEXTERIOR LIGHTING POWER1
01/10/2024121205971Open ↗
▸BISFENESTRATION AIR LEAKAGE1
01/10/2024121205971Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
01/10/2024121205971Open ↗
▸BISINTERIOR LIGHTING POWER1
01/10/2024121205971Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
01/10/2024121205971Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
01/10/2024121205971Open ↗
▸BISLIGHTING IN DWELLING UNITS1
01/10/2024121205971Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
01/10/2024121205971Open ↗
▸BISELECTRIC MOTORS1
01/10/2024121205971Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/13/2023121205971Open ↗
▸BISLIGHTING CONTROLS1
01/10/2024121205971Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/12/2019140858427Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
01/10/2024121205971Open ↗
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY5
03/14/2024121205971Open ↗
07/07/2021121205971Open ↗
08/30/2019121205971Open ↗
Showing 3 of 5 on file for this type
▸BISCONCRETE - CAST-IN-PLACE1
01/10/2024121205971Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
01/10/2024121205971Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
01/10/2024121205971Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/10/2024121205971Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
01/10/2024121205971Open ↗
▸BISMASONRY1
01/10/2024121205971Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
01/10/2024121205971Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
01/10/2024121205971Open ↗
▸Approvals, Objections & Sign-offs26
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter16
09/05/2026M00152194-I1Open ↗
09/05/2026M00215293-P1Open ↗
09/05/2026M00215293-P2Open ↗
Showing 3 of 16 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
04/19/2024121205971Open ↗
09/27/2019121205971Open ↗
08/30/2019121205971Open ↗
▸DOB NOWDEP Variance (V5) letter3
09/05/2026M00215293-I1Open ↗
09/05/2026M00221240-I1Open ↗
09/03/2026M00220085-I1Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)2
08/13/2026M00236088-I1Open ↗
08/13/2026M00236088-P1Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
12/13/2023121205971Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
07/12/2019140858427Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
08/30/2019121205971Open ↗
07/12/2019140858427Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
12/19/2023121205971Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION4
12/29/2023121205971Open ↗
12/29/2023121205971Open ↗
09/30/2019121205971Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
07/12/2019140858427Open ↗
▸Other Documents7
▸BISVESTIBULES1
01/10/2024121205971Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
01/10/2024121205971Open ↗
▸BISFEE EXEMPTION DOCUMENTATION1
07/12/2019140858427Open ↗
▸BISMAINTENANCE INFORMATION1
01/10/2024121205971Open ↗
▸BIS* LOADING DECK WEATHER SEALS1
01/10/2024121205971Open ↗
▸BISPLOT DIAGRAM1
08/30/2019121205971Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
09/05/2026M00152194-I1Open ↗