Elevator apt, semi-fireproof with stores
240 1 AVENUE
MANHATTAN · BIN 1082878
💬 Discuss this project
1945Year Built
13Stories
D7Building Class
R7-2Zoning
8,942,176 sfGross Floor Area
8,812Units
LL97 CoveredRent Stabilized18 Open Violations ▸
Elevator apt, semi-fireproof with stores · Owner of record: BPP ST OWNER LLC · 2,675,000 sf lot · 3.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Roof6p · 3 filings · 20 docs
Floor 19p · 2 filings · 20 docs
Cellar2p · 2 filings · 3 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/18/2015$4.1B—ST-DIL LLC → BPP ST OWNER LLC$460/sf building
06/03/2014$3.3B—— → —$372/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS703/21/2026
SIGNS CAD403/21/2026
CONVERSANO ASSOCIATES, INC.203/21/2026
ANDREW MAASS1103/21/2026
RPO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CONSTRUCTION MANAGEMENT &General Contractor604/09/2026
ALLSTATE SPRINKLER LLCFire Protection107/08/2026
SIGNS CAD CORPGeneral Contractor107/08/2026
A PLUS PLUMBING CORPPlumbing107/08/2026
SIGNS CADScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SKYLINE ENGINEERING, PLLC2671411/20/2025
NORMAN C. LOK818111/01/2024
BUILDING STUDIO ARCHITECT592312/20/2022
CROSSCHECK INSPECTION SER544112/20/2022
HIGH LINE ENGINEERING PC29203—
MILROSE CONSULTANTS LLC20033—
Building Lifecycle
All (70)Filed (18)Permit Issued (8)Signed Off (7)Inspection (5)Objection (2)Special Inspection (30)
07/23/2026
Signed off — Alteration
ERECT TWO NON-ILLUMINATED, ACCESSORY BUSINESS AWNINGS, NO CHANGE TO USE, EGRESS OR OCCUPATION
M01120719-I1
01/15/2026
Signed off — Alteration
Modification to the existing Plumbing system on the 1st floor. No change in occupancy, use or egress.
M01085805-S1
01/15/2026
Signed off — Alteration
M01120658-I1
01/08/2026
Signed off — Alteration
Modification to the existing Plumbing system on the 1st floor. No change in occupancy, use or egress.
M01085805-S3
12/22/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/19/2025
Signed off — Alteration
Modification to the existing Plumbing system on the 1st floor. No change in occupancy, use or egress.
M01085805-S2
12/19/2025
Signed off — Alteration
Modification to the existing Plumbing system on the 1st floor. No change in occupancy, use or egress.
M01085805-I1
11/21/2025
Special inspection requirement — Tenant Protection Plan Compliance
Matthew Wavro
11/20/2025
Filed — Alteration
Modification to the existing Plumbing system on the 1st floor. No change in occupancy, use or egress.
M01085805-P7
11/12/2025
Permit issued — General Construction
M01085805-I1-GC
11/10/2025
Filed — Alteration
Modification to the existing Plumbing system on the 1st floor. No change in occupancy, use or egress.
M01085805-P6
11/10/2025
Filed — Alteration
Modification to the existing Plumbing system on the 1st floor. No change in occupancy, use or egress.
M01085805-P8
11/10/2025
Special inspection requirement — Final
Matthew Wavro
11/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
Matthew Wavro
11/10/2025
Special inspection requirement — Mechanical Systems
Matthew Wavro
11/10/2025
Special inspection requirement — Energy Code Compliance Inspections
Matthew Wavro
11/10/2025
Special inspection requirement — Final
Matthew Wavro
11/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
Matthew Wavro
11/10/2025
Special inspection requirement — Post-installed Anchors
Matthew Wavro
11/10/2025
Special inspection requirement — Maintenance information
Matthew Wavro
11/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
Matthew Wavro
11/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Matthew Wavro
11/10/2025
Special inspection requirement — Shutoff dampers
Matthew Wavro
11/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
Matthew Wavro
11/10/2025
Special inspection requirement — Exterior lighting power
Matthew Wavro
07/24/2025
Special inspection requirement — Tenant Protection Plan Compliance
Matthew Wavro
05/22/2025
Signed off — Alteration
Propose existing sprinkler system modifications to Cellar and 001 floors at 409 East 14 Street, NY, NY all as per plans herewith filed. No change in use, egress or occupancy filed under this application.
M01163907-I1
05/08/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/05/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/05/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/28/2025
Permit issued — Sprinklers
M01163907-I1-EW-SP
03/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/17/2025
Filed — Alteration
Propose existing sprinkler system modifications to Cellar and 001 floors at 409 East 14 Street, NY, NY all as per plans herewith filed. No change in use, egress or occupancy filed under this application.
M01163907-I1
03/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
Matthew Wavro
02/19/2025
Permit issued — Plumbing
M01085805-S3-PL
02/14/2025
Filed — Alteration
Modification to the existing Plumbing system on the 1st floor. No change in occupancy, use or egress.
M01085805-P5
01/17/2025
Permit issued — Structural
M01085805-S2-ST
01/10/2025
Permit issued — Mechanical Systems
M01085805-S1-MS
01/07/2025
Filed — Alteration
Modification to the existing Plumbing system on the 1st floor. No change in occupancy, use or egress.
M01085805-P2
01/07/2025
Filed — Alteration
Modification to the existing Plumbing system on the 1st floor. No change in occupancy, use or egress.
M01085805-P3
01/07/2025
Special inspection requirement — Sprinkler Systems
Matthew Wavro
01/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
12/31/2024
Filed — Alteration
Modification to the existing Plumbing system on the 1st floor. No change in occupancy, use or egress.
M01085805-P1
12/30/2024
Filed — Alteration
Modification to the existing Plumbing system on the 1st floor. No change in occupancy, use or egress.
M01085805-P4
12/16/2024
Special inspection requirement — HVAC-R and service water heating system controls
Matthew Wavro
12/16/2024
Special inspection requirement — Post-installed Anchors
Matthew Wavro
12/16/2024
Special inspection requirement — Structural Steel - Details
Matthew Wavro
12/16/2024
Special inspection requirement — Structural Steel - High Strength Bolting
Matthew Wavro
12/16/2024
Special inspection requirement — Structural Steel - Welding
Matthew Wavro
12/16/2024
Special inspection requirement — Tenant Protection Plan Compliance
Matthew Wavro
12/16/2024
Special inspection requirement — Final
Matthew Wavro
12/16/2024
Special inspection requirement — Tenant Protection Plan Compliance
Matthew Wavro
12/16/2024
Special inspection requirement — Mechanical Systems
Matthew Wavro
12/16/2024
Special inspection requirement — Post-installed Anchors
Matthew Wavro
12/16/2024
Special inspection requirement — Energy Code Compliance Inspections
Matthew Wavro
12/16/2024
Special inspection requirement — Final
Matthew Wavro
11/18/2024
Permit issued — General Construction
M01085805-I1-GC
11/15/2024
Permit issued — General Construction
M01120719-I1-GC
11/04/2024
Permit issued — Sign
M01120658-I1-SG
11/01/2024
Filed — Alteration
ERECT TWO NON-ILLUMINATED, ACCESSORY BUSINESS AWNINGS, NO CHANGE TO USE, EGRESS OR OCCUPATION
M01120719-I1
Latest 60 of 70 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCONSTRUCTION MANAGEMENT &11/12/2025
DOB NOWSprinklersSigned-offALLSTATE SPRINKLER LLC04/28/2025
DOB NOWPlumbingSigned-offA PLUS PLUMBING CORP02/19/2025
DOB NOWStructuralSigned-offCONSTRUCTION MANAGEMENT &01/17/2025
DOB NOWMechanical SystemsSigned-offCONSTRUCTION MANAGEMENT &01/10/2025
DOB NOWGeneral ConstructionSigned-offCONSTRUCTION MANAGEMENT &11/18/2024
DOB NOWGeneral ConstructionSigned-offSIGNS CAD CORP11/15/2024
DOB NOWSignSigned-offSIGNS CAD CORP11/04/2024
9 projects · most recent 12/18/2025
General Wiring HVAC Wiring
FiledStatusContractorScope
12/18/2025CompletePATRIOT ELECTRIC CORPGeneral Wiring
04/02/2025CompleteSIGNS CAD CORP—
01/14/2025CompletePATRIOT ELECTRIC CORP—
12/26/2024CompleteBIG CITY ELECL SOLUTIONSHVAC Wiring
11/04/2024CompletePATRIOT ELECTRIC CORPGeneral Wiring
05/06/2024Permit IssuedATLAS-ACON ELEC. SERVICEGeneral Wiring
01/22/2024CompleteBIG CITY ELECL SOLUTIONS—
01/16/2024CancelledELECTRICAL SOLUTIONS LLCGeneral Wiring
06/23/2021CompleteGLENDALE ELECTL CONTNG IN—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/22/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/08/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/05/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/05/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 57
DateRequirementInspectorRole
11/21/2025Tenant Protection Plan ComplianceMatthew Wavrospecial
11/10/2025FinalMatthew Wavroprogress
11/10/2025Tenant Protection Plan ComplianceMatthew Wavrospecial
11/10/2025Mechanical SystemsMatthew Wavrospecial
11/10/2025Energy Code Compliance InspectionsMatthew Wavroprogress
11/10/2025FinalMatthew Wavroprogress
11/10/2025Tenant Protection Plan ComplianceMatthew Wavrospecial
11/10/2025Post-installed AnchorsMatthew Wavrospecial
11/10/2025Maintenance informationMatthew Wavroenergy_progress
11/10/2025HVAC-R and service water heating equipmentMatthew Wavroenergy_progress
11/10/2025HVAC-R and service water piping design and insulationMatthew Wavroenergy_progress
11/10/2025Shutoff dampersMatthew Wavroenergy_progress
11/10/2025HVAC-R and service water heating system controlsMatthew Wavroenergy_progress
11/10/2025Exterior lighting powerMatthew Wavroenergy_progress
07/24/2025Tenant Protection Plan ComplianceMatthew Wavrospecial
03/11/2025Tenant Protection Plan ComplianceMatthew Wavrospecial
01/07/2025Sprinkler SystemsMatthew Wavrospecial
01/07/2025Fire-Resistant Penetrations and JointsMatthew Wavrospecial
12/16/2024HVAC-R and service water heating system controlsMatthew Wavroenergy_progress
12/16/2024Post-installed AnchorsMatthew Wavrospecial
12/16/2024Structural Steel - DetailsMatthew Wavrospecial
12/16/2024Structural Steel - High Strength BoltingMatthew Wavrospecial
12/16/2024Structural Steel - WeldingMatthew Wavrospecial
12/16/2024Tenant Protection Plan ComplianceMatthew Wavrospecial
12/16/2024FinalMatthew Wavroprogress
Latest 25 of 57.
▾Documents — 91 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
09/01/2026M08001144-I1Request digital key ↗
09/01/2026M08001341-I1Request digital key ↗
08/25/2026M01120658-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸Seals & Professional Certifications52
▸DOB NOWSpecial Inspector Seal & Signature22
09/27/2026M08034906-I1Open ↗
09/27/2026M08034906-I1Open ↗
09/01/2026M08034895-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature20
09/01/2026M08042410-I1Open ↗
08/25/2026M01120658-I1Open ↗
08/25/2026M01085805-P1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026M08034895-I1Open ↗
09/01/2026M01085805-I1Open ↗
08/28/2026M01085805-P4Open ↗
Showing 3 of 10 on file for this type
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
08/25/2026M01120658-I1Open ↗
08/25/2026M01085805-P5Open ↗
08/25/2026M01085805-P2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Completion Form3
08/13/2026M08034862-I1Open ↗
08/13/2026M08034895-I1Open ↗
08/13/2026M08005035-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M01085805-I1Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M01085805-S1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026M08001341-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026M08001341-I1Open ↗