← Back
Elevator apt, semi-fireproof with stores
Stuy Town Peter Cooper Village
240 1 AVENUE · BIN 1082883
💬 Discuss this project
1945Year Built
13Stories
D7Building Class
R7-2Zoning
8,942,176 sfGross Floor Area
8,812Units
LL97 CoveredRent Stabilized18 Open Violations ▸FISP: SWARMP
Elevator apt, semi-fireproof with stores · Owner of record: BPP ST OWNER LLC · 2,675,000 sf lot · 3.34 FAR built · Flood zone X
Locations of Work
ArchitectureFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 2 filings · 14 docs
BulkheadUnder Construction1p · 1 filing · 6 docs
Floor 18p · 2 filings · 20 docs
Basement2p · 1 filing · 10 docs
25 jobs · most recent 08/31/2026
General Wiring
FiledStatusContractorScope
08/31/2026Permit IssuedGRX EURO ELECTRIC CORP—
08/05/2026Permit IssuedWCK ELECTRIC CORP.—
05/18/2026CompleteELECTRICAL SOLUTIONS LLCGeneral Wiring
08/06/2025CompleteELECTRICAL SOLUTIONS LLCGeneral Wiring
07/09/2025CompleteELECTRICAL SOLUTIONS LLCGeneral Wiring
01/15/2025CompleteATLAS-ACON ELEC. SERVICEGeneral Wiring
01/07/2025CompleteELECTRICAL SOLUTIONS LLCGeneral Wiring
08/30/2024CompleteELECTRICAL SOLUTIONS LLC—
05/17/2024CompleteELECTRICAL SOLUTIONS LLCGeneral Wiring
04/15/2024CompleteELECTRICAL SOLUTIONS LLCGeneral Wiring
01/22/2024CompleteELECTRICAL SOLUTIONS LLCGeneral Wiring
01/08/2024CompleteELECTRICAL SOLUTIONS LLCGeneral Wiring
12/12/2023CompleteELECTRICAL SOLUTIONS LLCGeneral Wiring
11/27/2023Permit IssuedELECTRICAL SOLUTIONS LLCGeneral Wiring
11/13/2023CompleteSOLAS ELECTRICAL CORP—
1 job · most recent 08/21/2026
FiledStatusContractorScope
08/21/2026Permit IssuedPJP INSTALLERS INC1 scope_items
1 job · most recent 08/11/2026
Sidewalk Shed
FiledStatusContractorScope
08/11/2026——Sidewalk Shed
1 job · most recent 08/11/2026
Suspended Scaffold
FiledStatusContractorScope
08/11/2026Permit IssuedCONSTRUCTED CORPSuspended Scaffold
1 job · most recent 08/11/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
08/11/2026Permit IssuedCONSTRUCTED CORPSuspended Scaffold (SC)
Building Lifecycle
All (174)Filed (26)Permit Issued (23)Signed Off (15)Facade (FISP) (12)Violation (60)Inspection (6)Objection (2)Special Inspection (30)
08/24/2026
Permit issued — General Construction
M01352135-I1-GC
08/24/2026
Permit issued — Protection and Mechanical Methods
M01449159-I1-PMM
08/21/2026
Filed — Alteration
STORAGE OF MATERIAL / EQUIPMENT ON TOP OF HEAVY DUTY SIDEWALK SHED. STORAGE SHALL NOT EXCEED 50 PSF. SHED FILED UNDER SEPARATE APPLICATION. STORAGE SHALL COMPLY WITH CH#33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
M01449159-I1
08/20/2026
Permit issued — Suspended Scaffold
M01428854-I1-SC
08/19/2026
Filed — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01447828-I1
08/19/2026
Permit issued — Sidewalk Shed
M01447828-I1-SH
08/11/2026
Filed — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01443402-I1
08/11/2026
Filed — Alteration
THE SCOPE OF WORK INCLUDES THE INSTALLATION OF OUTRIGGERS AS SHOWN IN PROVIDED DRAWINGS FOR LOCAL LAW 11 MASONRY FACADE REPAIR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01428854-I1
08/06/2026
Filed — Alteration
Filing for limited FISP facade repairs at 505 East 14th St, and 515 East 14th St, as shown on drawings filed herewith. No change in use, egress or occupancy
M01352135-I1
08/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
Sandeep Gunnala
08/05/2026
Special inspection requirement — Masonry
Sandeep Gunnala
08/05/2026
Special inspection requirement — Post-installed Anchors
Sandeep Gunnala
08/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Sandeep Gunnala
08/03/2026
Special inspection requirement — Post-installed Anchors
Sandeep Gunnala
08/03/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Sandeep Gunnala
08/03/2026
Special inspection requirement — Final
Sandeep Gunnala
06/27/2026
Violation issued (HPD, closed)
C
04/30/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/19/2026
Violation issued (HPD, closed)
C
02/01/2026
Violation issued (HPD, closed)
B
02/01/2026
Violation issued (HPD, closed)
B
01/16/2026
Violation issued (ECB, closed)
Elevators
12/09/2025
Signed off — Alteration
M01112630-I1
11/21/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/29/2025
Signed off — Alteration
General construction for interior renovation of Apartment 4A on the 5th floor as shown on drawings filed herewith. No change in use, egress or occupancy
M01238472-I1
08/29/2025
Signed off — Alteration
General construction for interior renovation of Apartment 6A on the 7th floor as shown on drawings filed herewith. No change in use, egress or occupancy.
M01230810-I1
08/07/2025
Filed — Alteration
General construction for interior renovation of Apartment 4A on the 5th floor as shown on drawings filed herewith. No change in use, egress or occupancy
M01238472-P1
08/06/2025
Special inspection requirement — Energy Code Compliance Inspections
John Field
08/06/2025
Special inspection requirement — Tenant Protection Plan Compliance
08/06/2025
Special inspection requirement — Lighting in dwelling units
John Field
08/06/2025
Special inspection requirement — Final
John Field
07/07/2025
Signed off — Alteration
Filing for FISP limited facade repairs at 505 East 14th St and 515 East 14th St as shown on drawings filed herewith. No change in use, egress or occupancy.
M00950664-I1
06/26/2025
Permit issued — General Construction
M01238472-I1-GC
06/17/2025
Permit issued — General Construction
M01230810-I1-GC
06/12/2025
Filed — Alteration
General construction for interior renovation of Apartment 4A on the 5th floor as shown on drawings filed herewith. No change in use, egress or occupancy
M01238472-I1
06/12/2025
Violation issued (HPD, closed)
A
06/10/2025
Filed — Alteration
General construction for interior renovation of Apartment 6A on the 7th floor as shown on drawings filed herewith. No change in use, egress or occupancy.
M01230810-I1
06/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
John Field
06/09/2025
Special inspection requirement — Final
John Field
06/09/2025
Special inspection requirement — Energy Code Compliance Inspections
John Field
06/09/2025
Special inspection requirement — Lighting in dwelling units
John Field
06/03/2025
Signed off — Alteration
Plumbing modifications for interior renovation of Apartment 0ME at 505 East 14th St as shown on drawings filed herewith. Alt CO filed separately under M00979589-I1.
M00987549-I1
06/02/2025
Signed off — Alteration
Installation of sprinkler heads and related piping for renovation of Apartment 0ME in conjunction with Alt CO M00979589-I1 as shown on drawings filed herewith.
M01066337-I1
03/11/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/07/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/06/2025
Special inspection requirement — Sprinkler Systems
EUGENE BIFULCO
03/06/2025
Special inspection requirement — Tenant Protection Plan Compliance
John Field
03/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
John Field
03/05/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00959156-I1
02/05/2025
Permit issued — Sprinklers
M01066337-I1-EW-SP
01/30/2025
Filed — Alteration
Installation of sprinkler heads and related piping for renovation of Apartment 0ME in conjunction with Alt CO M00979589-I1 as shown on drawings filed herewith.
M01066337-P1
01/02/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/18/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/05/2024
Special inspection requirement — Tenant Protection Plan Compliance
11/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
John Field
11/04/2024
Special inspection requirement — Sprinkler Systems
EUGENE BIFULCO
10/07/2024
Permit issued — Mechanical Systems
M01112630-I1-MS
09/29/2024
Signed off — Alteration
Facade Restoration
M01008052-I1
09/23/2024
Filed — Alteration
M01112630-I1
09/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
John Field
Latest 60 of 174 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BPP ST OWNER9809/12/2026
BPP PCV OWNER2408/21/2026
OWNERS REP403/22/2026
METROPOLITAN INSURANCE103/22/2026
PVC/ST LLC C/O REI N103/22/2026
BPP OWNERS LLC503/22/2026
ROSE ASSOCIATES INC603/21/2026
PCV ST OWNER LP203/21/2026
ST OWNER203/21/2026
ROSE ASSOCIATES INC MANAGER2903/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/18/2015$4.1B—ST-DIL LLC → BPP ST OWNER LLC$460/sf building
06/03/2014$3.3B—— → —$372/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HC PEC308/21/2026
SANDEEP GUNNALA ENGINEERING PLLC108/06/2026
BUILDING STUDIO ARCHITECTS1408/07/2025
L. NAOUM, P.E., P. C.201/30/2025
PAUL PERDEK, PROF. ENG. PLLC211/29/2023
CTL GROUP211/02/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RIZZO GROUP1803/21/2026
RIGGING CONSULTANTS203/21/2026
AE DESIGN SOLUTION403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUPER G CONSTRUCTION CORPGeneral Contractor2507/08/2026
IRON WORKERS LOCAL 40Electrical703/21/2026
ASPESI, MARCELOElectrical703/21/2026
YORK CONSTRUCTION SERVICEGeneral Contractor507/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor303/21/2026
DUO PLBG. & HTG. CORPFire Protection207/08/2026
HARVEY ISAACMANElectrical203/21/2026
MORALES, RICHARDElectrical203/21/2026
VTL ELECTRIC CO., CORPElectrical203/22/2026
PJP INSTALLERS INCGeneral Contractor208/25/2026
KAMA CONSTRUCTION CORPGeneral Contractor108/25/2026
TORRES IVANElectrical103/21/2026
NORTHEAST PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SANDEEP GUNNALA ENGINEERI8482308/11/2026
BUILDING STUDIO ARCHITECT5921206/12/2025
CROSSCHECK INSPECTION SER544201/30/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedKAMA CONSTRUCTION CORP08/24/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedPJP INSTALLERS INC08/24/2026
DOB NOWSuspended ScaffoldPermit IssuedCONSTRUCTED CORP08/20/2026
DOB NOWSidewalk ShedPermit IssuedPJP INSTALLERS INC08/19/2026
DOB NOWGeneral ConstructionSigned-offSUPER G CONSTRUCTION CORP06/26/2025
DOB NOWGeneral ConstructionSigned-offSUPER G CONSTRUCTION CORP06/17/2025
DOB NOWSprinklersSigned-offDUO PLBG. & HTG. CORP02/05/2025
DOB NOWMechanical SystemsSigned-offSUPER G CONSTRUCTION CORP10/07/2024
DOB NOWSprinklersSigned-offDUO PLBG. & HTG. CORP09/10/2024
DOB NOWPlumbingSigned-offNORTHEAST PLBG & HTG CORP08/29/2024
DOB NOWGeneral ConstructionPermit IssuedSUPER G CONSTRUCTION CORP08/07/2024
DOB NOWGeneral ConstructionSigned-offYORK CONSTRUCTION SERVICE05/23/2024
DOB NOWGeneral ConstructionSigned-offYORK CONSTRUCTION SERVICE05/22/2024
DOB NOWGeneral ConstructionSigned-offSUPER G CONSTRUCTION CORP04/09/2024
DOB NOWSuspended ScaffoldSigned-offSHR3 CONSTRUCTION CORP03/08/2024
DOB NOWGeneral ConstructionSigned-offSUPER G CONSTRUCTION CORP11/29/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC11/09/2023
DOB NOWGeneral ConstructionSigned-offYORK CONSTRUCTION SERVICE11/09/2023
DOB NOWGeneral ConstructionSigned-offSUPER G CONSTRUCTION CORP05/24/2023
DOB NOWGeneral ConstructionSigned-offSUPER G CONSTRUCTION CORP05/09/2023
DOB NOWGeneral ConstructionSigned-offSUPER G CONSTRUCTION CORP05/28/2022
DOB NOWGeneral ConstructionSigned-offSUPER G CONSTRUCTION CORP05/28/2022
DOB NOWGeneral ConstructionSigned-offSUPER G CONSTRUCTION CORP05/26/2022
BISOTISSUEDCRRE TOWN AND VILLAGE LLC09/25/2025
BISOTISSUEDCRRE TOWN AND VILLAGE LLC09/25/2024
BISOTISSUEDCRRE TOWN AND VILLAGE LLC09/26/2023
BISOTISSUEDCRRE TOWN AND VILLAGE LLC09/30/2022
BISOTISSUEDCRRE TOWN AND VILLAGE LLC11/17/2021
BISOTISSUEDCRRE TOWN AND VILLAGE LLC09/23/2020
BISOTISSUEDCRRE TOWN AND VILLAGE LLC06/15/2020
BISOTISSUEDCRRE TOWN AND VILLAGE LLC12/09/2019
BISOTISSUEDTRADITIONAL WATERPROOFING11/19/2019
BISPLISSUEDPACE PLUMBING CORP05/21/2019
BISOTISSUEDSUPER G CONSTRUCTION CORP05/14/2019
BISPLISSUEDPACE PLUMBING CORP05/07/2019
BISOTISSUEDDELLAPEAK INTERIORS LLC05/01/2019
BISPLISSUEDPACE PLUMBING CORP04/30/2019
BISOTISSUEDLEGACY BUILDERS/DEVELOPERS CORP04/22/2019
BISOTISSUEDDELLAPEAK INTERIORS LLC04/18/2019
BISPLISSUEDPACE PLUMBING CORP04/10/2019
+ 33 more permits on file
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/30/2026Pass-Final CND-Occupancy InspectionPassView ↗
11/21/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/11/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/07/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/02/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/18/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 58
DateRequirementInspectorRole
08/05/2026Tenant Protection Plan ComplianceSandeep Gunnalaspecial
08/05/2026MasonrySandeep Gunnalaspecial
08/05/2026Post-installed AnchorsSandeep Gunnalaspecial
08/05/2026Structural Stability – Alterations of existing buildingsSandeep Gunnalaspecial
08/03/2026Post-installed AnchorsSandeep Gunnalaspecial
08/03/2026Alternative Materials - OTCR Buildings Bulletin NumberSandeep Gunnalaspecial
08/03/2026FinalSandeep Gunnalaprogress
08/06/2025Energy Code Compliance InspectionsJohn Fieldprogress
08/06/2025Tenant Protection Plan Compliance—special
08/06/2025Lighting in dwelling unitsJohn Fieldenergy_progress
08/06/2025FinalJohn Fieldprogress
06/09/2025Tenant Protection Plan ComplianceJohn Fieldspecial
06/09/2025FinalJohn Fieldprogress
06/09/2025Energy Code Compliance InspectionsJohn Fieldprogress
06/09/2025Lighting in dwelling unitsJohn Fieldenergy_progress
03/06/2025Sprinkler SystemsEUGENE BIFULCOspecial
03/06/2025Tenant Protection Plan ComplianceJohn Fieldspecial
03/06/2025Fire-Resistant Penetrations and JointsJohn Fieldspecial
11/05/2024Tenant Protection Plan Compliance—special
11/04/2024Fire-Resistant Penetrations and JointsJohn Fieldspecial
11/04/2024Sprinkler SystemsEUGENE BIFULCOspecial
09/19/2024Fire-Resistant Penetrations and JointsJohn Fieldspecial
09/19/2024Tenant Protection Plan ComplianceJohn Fieldspecial
09/17/2024Mechanical SystemsJohn Fieldspecial
09/17/2024FinalJohn Fieldprogress
Latest 25 of 58.
▾Documents — 800 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch25
09/02/2026M00730720-I1Request digital key ↗
09/02/2026M00730722-I1Request digital key ↗
09/02/2026M00730723-I1Request digital key ↗
Showing 3 of 25 on file for this type
▸Applications & Permits121
▸BISPLAN / WORK APPROVAL APPLICATION62
11/13/2025102786781Open ↗
06/28/2021102786781Open ↗
03/09/2021102786781Open ↗
Showing 3 of 62 on file for this type
▸BISWORK PERMIT APPLICATION58
12/09/2019102786781Open ↗
11/19/2019123768020Open ↗
05/22/2019123719413Open ↗
Showing 3 of 58 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications238
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION85
10/15/2019123768020Open ↗
09/17/2019123719413Open ↗
09/16/2019123835485Open ↗
Showing 3 of 85 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST43
05/15/2019123719413Open ↗
05/02/2019123807899Open ↗
04/22/2019123835485Open ↗
Showing 3 of 43 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM34
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 34 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature25
09/02/2026M00730720-I1Open ↗
08/31/2026M00873605-I1Open ↗
08/28/2026M00950664-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
09/23/2026M00979589-I1Open ↗
09/19/2026M01010281-I1Open ↗
09/19/2026M01010281-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/23/2026M00979589-I1Open ↗
09/23/2026M00979589-I1Open ↗
09/19/2026M01010281-I1Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT11
05/15/2019123719413Open ↗
05/02/2019123807899Open ↗
04/22/2019123835485Open ↗
Showing 3 of 11 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
03/05/2018140737727Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
03/05/2018140737727Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment9
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
05/15/2019123719413Open ↗
05/02/2019123807899Open ↗
04/22/2019123835485Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSELF-CERT PLUMBING NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection14
▸BISTenant Protection Plan and Notes13
09/17/2019123768020Open ↗
09/06/2019123768020Open ↗
07/09/2019123768020Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWStreet Tree Checklist1
08/13/2026M00979589-I1Open ↗
▸Environmental & Asbestos76
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'42
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 42 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
09/02/2026M00730720-I1Open ↗
08/31/2026M00873605-I1Open ↗
08/28/2026M00950664-P1Open ↗
Showing 3 of 15 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)14
07/09/2019123768020Open ↗
07/09/2019123768020Open ↗
05/15/2019123719413Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/27/2026M00987549-I1Open ↗
08/27/2026M01066337-I1Open ↗
08/26/2026M01112630-I1Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance49
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS19
10/15/2019123768020Open ↗
09/17/2019123719413Open ↗
09/16/2019123835485Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: ENERGY11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
07/09/2020123807899Open ↗
09/17/2019123719413Open ↗
09/16/2019123835485Open ↗
Showing 3 of 8 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis3
08/13/2026M00730723-I1Open ↗
08/13/2026M00730722-I1Open ↗
08/13/2026M00730720-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
07/09/2020123807899Open ↗
03/05/2018140737727Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/23/2020123768020Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
03/05/2018140737727Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
07/09/2020123807899Open ↗
03/05/2018140737727Open ↗
03/05/2018140737727Open ↗
▸Approvals, Objections & Sign-offs77
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST40
11/23/2020123768020Open ↗
07/09/2020123807899Open ↗
09/17/2019123719413Open ↗
Showing 3 of 40 on file for this type
▸BISADMINISTRATIVE OBJECTIONS32
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 32 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
11/19/2019123768020Open ↗
03/05/2018140737727Open ↗
Showing 2 of 3 on file for this type
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership113
▸BISCOST AFFIDAVIT80
09/17/2019123719413Open ↗
09/16/2019123835485Open ↗
09/11/2019123862454Open ↗
Showing 3 of 80 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT30
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 30 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
11/23/2020123768020Open ↗
07/09/2020123807899Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
11/13/2019123768020Open ↗
▸Filing & Intake Forms68
▸BISEFILING COVER SHEET41
07/09/2019123768020Open ↗
05/15/2019123719413Open ↗
05/02/2019123807899Open ↗
Showing 3 of 41 on file for this type
▸BISBOROUGH INTAKE FORM12
09/17/2019123719413Open ↗
09/16/2019123835485Open ↗
09/11/2019123862454Open ↗
Showing 3 of 12 on file for this type
▸BISADDITIONAL INFORMATION9
10/29/2019123768020Open ↗
10/15/2019123768020Open ↗
10/11/2019123768020Open ↗
Showing 3 of 9 on file for this type
▸BISeFiling Job Application Cover Sheet6
03/05/2018140737727Open ↗
Showing 1 of 6 on file for this type
▸Other Documents7
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
11/13/2025102786781Open ↗
03/05/2018140737727Open ↗
▸DOB NOWManufacturer's Specifications2
09/28/2026M01428854-I1Open ↗
08/13/2026M01008052-I1Open ↗
▸DOB NOWCalculations2
09/28/2026M01428854-I1Open ↗
08/13/2026M01008052-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/28/2026M00979589-I1Open ↗