← Back
BuildNYC
Large suburban residence
240-25 ALAMEDA AVENUE
QUEENS · BIN 4170062
💬 Discuss this project
1935Year Built
2.5Stories
A3Building Class
R1-2Zoning
1,918 sfGross Floor Area
1Units
Large suburban residence · 7,440 sf lot · 0.26 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction10p · 1 filing · 20 docs
AtticUnder Construction22p · 1 filing · 20 docs
Floor 2Under Construction27p · 1 filing · 20 docs
Floor 1Under Construction25p · 1 filing · 20 docs
CellarUnder Construction25p · 1 filing · 20 docs
Site & exteriorUnder Construction1 filing · 2 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/25/2025$1.4M—Private party → Private party$723/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Yang Engineering710/23/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SD Design Studio203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L&L Construction DevelopmentGeneral Contractor208/06/2026
HY Design & DevelopmentGeneral Contractor108/05/2026
L&L Construction DevelopmentScaffold107/29/2026
L L Construction Developmentspecialty_contractor108/04/2026
Thomas F. Cash & SonsPlumbing107/31/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Zheng & Associates7330610/23/2026
Building Lifecycle
10/23/2026
Filed — Alteration
PROPOSED HORIZONTAL & VERTICAL EXTENSION OF AN EXISTING 2.5 STORY BUILDING W/ ATTIC AND CELLAR WITH GENERAL CONSTRUCTION AS PER PLAN.
Q01280703-P2
10/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
Jinfar Liu
10/22/2026
Special inspection requirement — Maintenance information
Jinfar Liu
10/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Jinfar Liu
10/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
Jinfar Liu
44 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedL&L Construction Development08/05/2026
DOB NOWFoundationPermit IssuedHY Design & Development08/04/2026
DOB NOWMechanical SystemsPermit IssuedL&L Construction Development08/03/2026
DOB NOWPlumbingPermit IssuedThomas F. Cash & Sons07/30/2026
DOB NOWStructuralPermit IssuedL&L Construction Development07/30/2026
DOB NOWConstruction FencePermit IssuedL&L Construction Development07/28/2026
1 project · most recent 10/23/2026
Heating and Air Conditioning Systems
FiledStatusContractorScope
10/23/2026Permit IssuedL&L Construction DevelopmentHeating and Air Conditioning Systems
1 project · most recent 08/10/2026
General Wiring
FiledStatusContractorScope
08/10/2026Permit IssuedR & T ElectricalGeneral Wiring
1 project · most recent 05/15/2026
Fence
FiledStatusContractorScope
05/15/2026Permit IssuedL&L Construction DevelopmentFence
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/28/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 67
DateRequirementInspectorRole
10/22/2026Fire-Resistant Penetrations and JointsJinfar Liuspecial
10/22/2026HVAC-R and service water heating equipmentJinfar Liuenergy_progress
10/22/2026Maintenance informationJinfar Liuenergy_progress
10/22/2026HVAC-R and service water heating system controlsJinfar Liuenergy_progress
10/22/2026HVAC-R and service water piping design and insulationJinfar Liuenergy_progress
10/22/2026Energy Code Compliance InspectionsJinfar Liuprogress
09/29/2026HVAC-R and service water heating system controlsJinfar Liuenergy_progress
09/29/2026Fenestration air leakageJinfar Liuenergy_progress
09/29/2026HVAC-R and service water piping design and insulationJinfar Liuenergy_progress
09/29/2026Fenestration areasJinfar Liuenergy_progress
09/29/2026Air barrier - visual inspectionJinfar Liuenergy_progress
09/29/2026Fenestration and door U-factor and product ratingsJinfar Liuenergy_progress
09/29/2026Fire-Resistant Penetrations and JointsJinfar Liuspecial
09/29/2026Heating SystemsJinfar Liuspecial
09/29/2026Mechanical SystemsJinfar Liuspecial
09/29/2026Structural Stability – Alterations of existing buildingsJinfar Liuspecial
09/29/2026Energy Code Compliance InspectionsJinfar Liuprogress
09/29/2026Fire-Resistance Rated ConstructionJinfar Liuprogress
09/29/2026FinalJinfar Liuprogress
09/29/2026Maintenance informationJinfar Liuenergy_progress
09/29/2026MeteringJinfar Liuenergy_progress
09/29/2026HVAC-R and service water heating equipmentJinfar Liuenergy_progress
09/29/2026Interior lighting powerJinfar Liuenergy_progress
09/29/2026Insulation placement and R valuesJinfar Liuenergy_progress
06/08/2026Footing and FoundationJinfar Liuprogress
Latest 25 of 67.
97 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account