← Back
Large suburban residence
240-34 51 AVENUE
QUEENS · BIN 4169935
💬 Discuss this project
1920Year Built
2.5Stories
A3Building Class
R1-2Zoning
3,792 sfGross Floor Area
1Units
Large suburban residence · 7,800 sf lot · 0.49 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Floor 213p · 2 filings · 20 docs
Floor 110p · 1 filing · 20 docs
Cellar12p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/17/2021$1.2M—Private party → Private party$305/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ZHENG & ASSOCIATES LLC508/19/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PAN LINK CONSTRUCTION INCGeneral Contractor903/21/2026
XH&RC PLBG AND HTG INCFire Protection107/08/2026
XH&RC PLBG AND HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TRIANGLE INSPECTION & TES7495208/19/2023
ZHENG & ASSOCIATES LLC7330408/19/2023
Building Lifecycle
All (80)Filed (5)Permit Issued (5)Signed Off (3)Inspection (9)Objection (28)Special Inspection (30)
05/24/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
ENLARGEMENT OF EXISTING ONE FAMILY DWELLING UNIT.
Q00692636-I1
04/18/2024
Signed off — Alteration
FILE PLUMBING WORK AND FIRE SPRINKLER FOR PROPOSED ALT-1 JOB.
Q00692638-I1
01/23/2024
Signed off — Alteration
Q00692620-I1
11/30/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/26/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/08/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/05/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/31/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
08/22/2023
Special inspection requirement — Sprinkler Systems
Jinfar Liu
08/22/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Jinfar Liu
08/22/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
08/22/2023
Special inspection requirement — Energy Code Compliance Inspections
Jinfar Liu
08/19/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
ENLARGEMENT OF EXISTING ONE FAMILY DWELLING UNIT.
Q00692636-P1
08/19/2023
Filed — Alteration
FILE PLUMBING WORK AND FIRE SPRINKLER FOR PROPOSED ALT-1 JOB.
Q00692638-P1
08/08/2023
Special inspection requirement — Heating Systems
Jinfar Liu
08/08/2023
Special inspection requirement — Permanent certificate
Jinfar Liu
08/08/2023
Special inspection requirement — HVAC-R and service water heating equipment
Jinfar Liu
08/08/2023
Special inspection requirement — Air barrier continuity plan testing
Jinfar Liu
08/08/2023
Special inspection requirement — Insulation placement and R values
Jinfar Liu
08/08/2023
Special inspection requirement — Protection of exposed foundation insulation
Jinfar Liu
08/08/2023
Special inspection requirement — Mechanical Systems
Jinfar Liu
08/08/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jinfar Liu
08/08/2023
Special inspection requirement — Structural Steel - Details
Jinfar Liu
08/08/2023
Special inspection requirement — Structural Steel - High Strength Bolting
Jinfar Liu
08/08/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
08/08/2023
Special inspection requirement — Wood – Metal-Plate-Connected Trusses
Jinfar Liu
08/08/2023
Special inspection requirement — Energy Code Compliance Inspections
Jinfar Liu
08/08/2023
Special inspection requirement — Final
Jinfar Liu
08/08/2023
Special inspection requirement — Fire-Resistance Rated Construction
Jinfar Liu
08/08/2023
Special inspection requirement — Footing and Foundation
Jinfar Liu
08/08/2023
Special inspection requirement — Structural Wood Frame
Jinfar Liu
08/08/2023
Special inspection requirement — Air barrier — testing
Jinfar Liu
08/08/2023
Special inspection requirement — Fenestration areas
Jinfar Liu
08/08/2023
Special inspection requirement — Electric vehicle service equipment requirements
Jinfar Liu
08/08/2023
Special inspection requirement — HVAC-R and service water heating system controls
Jinfar Liu
08/08/2023
Special inspection requirement — Maintenance information
Jinfar Liu
08/08/2023
Special inspection requirement — Fenestration air leakage
Jinfar Liu
08/08/2023
Special inspection requirement — Air barrier - visual inspection
Jinfar Liu
08/08/2023
Special inspection requirement — Ventilation and air distribution system
Jinfar Liu
01/04/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/04/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/04/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/04/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/25/2022
Permit issued — Sprinklers
Q00692638-I1-EW-SP
11/25/2022
Permit issued — Plumbing
Q00692638-I1-PL
11/14/2022
Permit issued — Mechanical Systems
Q00692636-I1-GC-CX
08/29/2022
Permit issued — Foundation
Q00692636-I1-GC-CX
08/29/2022
Permit issued — Construction Fence
Q00692620-I1-FN
07/18/2022
Objection raised — Other
07/18/2022
Objection resolved — Addressed
06/16/2022
Filed — Alteration
FILE PLUMBING WORK AND FIRE SPRINKLER FOR PROPOSED ALT-1 JOB.
Q00692638-I1
03/29/2022
Objection raised — Zoning
03/29/2022
Objection resolved — Addressed
03/29/2022
Objection raised — Other
03/29/2022
Objection resolved — Addressed
03/29/2022
Objection raised — Other
03/29/2022
Objection resolved — Addressed
03/29/2022
Objection raised — Zoning
03/29/2022
Objection resolved — Addressed
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offXH&RC PLBG AND HTG INC11/25/2022
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC11/25/2022
DOB NOWMechanical SystemsPermit IssuedPAN LINK CONSTRUCTION INC11/14/2022
DOB NOWFoundationPermit IssuedPAN LINK CONSTRUCTION INC08/29/2022
DOB NOWConstruction FenceSigned-offPAN LINK CONSTRUCTION INC08/29/2022
BISOTISSUEDMJ CONST07/30/1998
1 project · most recent 08/19/2023
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/19/2023Permit IssuedPAN LINK CONSTRUCTION INCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Goodman 24ABB348A360 60,000 BTU · Condensing Unit ×4
Heating
Navien NPE-240A2 175,000 BTU · Condensing Unit ×2
NFB-175H 175,000 BTU · Condensing Unit ×2
Ventilation
Broan 24ABB348ABN36010 104 CFM · Condensing Unit ×2
FB4CNF048 104 CFM · Fan Coil Indoor ×2
1 project · most recent 09/07/2023
General Wiring
FiledStatusContractorScope
09/07/2023CompleteCL ELECTRICAL CORPGeneral Wiring
1 project · most recent 08/19/2023
Steel Wood
FiledStatusContractorScope
08/19/2023Permit IssuedPAN LINK CONSTRUCTION INCSteel, Wood
1 project · most recent 08/19/2023
Earthwork
FiledStatusContractorScope
08/19/2023Permit IssuedPAN LINK CONSTRUCTION INCEarthwork
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
11/30/2023Pass-Final CND-Occupancy InspectionPassView ↗
09/26/2023Pass-Final CND-Occupancy InspectionPassView ↗
09/08/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/05/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/31/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/04/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/04/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/04/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/04/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
08/22/2023Fire-Resistant Penetrations and JointsJinfar Liuspecial
08/22/2023Sprinkler SystemsJinfar Liuspecial
08/22/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJinfar Liuspecial
08/22/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
08/22/2023Energy Code Compliance InspectionsJinfar Liuprogress
08/08/2023Heating SystemsJinfar Liuspecial
08/08/2023Permanent certificateJinfar Liuenergy_progress
08/08/2023HVAC-R and service water heating equipmentJinfar Liuenergy_progress
08/08/2023Air barrier continuity plan testingJinfar Liuenergy_progress
08/08/2023Insulation placement and R valuesJinfar Liuenergy_progress
08/08/2023Protection of exposed foundation insulationJinfar Liuenergy_progress
08/08/2023Mechanical SystemsJinfar Liuspecial
08/08/2023Structural Stability – Alterations of existing buildingsJinfar Liuspecial
08/08/2023Structural Steel - DetailsJinfar Liuspecial
08/08/2023Structural Steel - High Strength BoltingJinfar Liuspecial
08/08/2023Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
08/08/2023Wood – Metal-Plate-Connected TrussesJinfar Liuspecial
08/08/2023Energy Code Compliance InspectionsJinfar Liuprogress
08/08/2023FinalJinfar Liuprogress
08/08/2023Fire-Resistance Rated ConstructionJinfar Liuprogress
08/08/2023Footing and FoundationJinfar Liuprogress
08/08/2023Structural Wood FrameJinfar Liuprogress
08/08/2023Air barrier — testing Jinfar Liuenergy_progress
08/08/2023Fenestration areasJinfar Liuenergy_progress
08/08/2023Electric vehicle service equipment requirementsJinfar Liuenergy_progress
Latest 25 of 44.
▾Documents — 57 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/26/2026Q00692620-I1Request digital key ↗
08/24/2026Q00692636-P1Request digital key ↗
08/24/2026Q00692638-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits3
▸BISBPP-5 - Authorization to the Department of Transportation1
04/06/2022440708940Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
11/15/2023400801888Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
04/06/2022440708940Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00692636-I1Open ↗
08/13/2026Q00692636-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00692636-I1Open ↗
▸Seals & Professional Certifications22
▸DOB NOWSpecial Inspector Seal & Signature11
09/01/2026Q00692636-P1Open ↗
09/01/2026Q00692636-P1Open ↗
09/01/2026Q00692636-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026Q00692636-P1Open ↗
09/01/2026Q00692636-P1Open ↗
09/01/2026Q00692636-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/24/2026Q00692636-I1Open ↗
08/24/2026Q00692636-P1Open ↗
08/13/2026Q00692638-P1Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
04/06/2022440708940Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026Q00692636-P1Open ↗
08/13/2026Q00692636-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00692636-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/24/2026Q00692636-P1Open ↗
08/15/2026Q00692636-I1Open ↗
08/13/2026Q00692638-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00692636-I1Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT2
08/13/2026Q00692636-I1Open ↗
08/13/2026Q00692636-P1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
04/06/2022440708940Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00692636-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026Q00692636-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
01/29/2024440708940Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
04/06/2022440708940Open ↗
▸Other Documents9
▸DOB NOWSite Survey: Initial2
08/13/2026Q00692636-I1Open ↗
08/13/2026Q00692636-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00692636-I1Open ↗
08/13/2026Q00692636-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/24/2026Q00692636-P1Open ↗
08/15/2026Q00692636-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00692636-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00692636-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026Q00692636-I1Open ↗