← Back
Elevator apt, luxury type
Paramount Tower
240 EAST 39 STREET · Murray Hill-Kips Bay · BIN 1087340
💬 Discuss this project
1997Year Built
52Stories
D8Building Class
C1-9Zoning
624,519 sfGross Floor Area
470Units
LL97 CoveredRent Stabilized0 Open ViolationsFISP: SAFE
Elevator apt, luxury type · Owner of record: EAST 39TH REALTY LLC · 37,219 sf lot · 16.78 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Permit Issued — active, not yet Signed-off
Roof1 filing · 7 docs
Floor 52
Floor 51
Floor 50
Floor 49
Floor 48
Floor 47
Floor 46
Floor 45
Floor 44
Floor 43
Floor 42
Floor 41
Floor 40
Floor 39
Floor 38
Floor 37
Floor 36
Floor 35
Floor 34
Floor 33
Floor 32
Floor 31
Floor 30
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Under Construction1p · 3 filings · 7 docs
CellarUnder Construction5p · 4 filings · 20 docs
Sub-Cellar7p · 4 filings · 20 docs
Site & exterior4 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EAST 39TH REALTY5503/22/2026
GLENWOOD MANAGEMENT CORP.3107/08/2026
PEDROL CONTRACTING704/09/2026
GLENWOOD MANAGEMENT GARAGE DIVISION507/08/2026
EAST 39TH203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
OUTSOURCE CONSULTANTS, INC.1203/21/2026
I L CONSULTING203/21/2026
MESZAROS ENGINEERING PLLC203/21/2026
HIERARCH-E403/21/2026
HLZAE103/21/2026
GEIGER E A GROUP203/21/2026
AM PROFESSIONALS103/21/2026
SME PROFESSIONAL DESIGN & CONSULTAN403/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LCS RESTORATION CORPGeneral Contractor1207/08/2026
J. CAIAZZO PLBG & HTG CORPFire Protection207/08/2026
DUAL FUEL COMPANY LLCGeneral Contractor207/08/2026
SERVICE SIGN ERECTORSScaffold207/08/2026
GLENWOOD MANAGEMENT CORPGeneral Contractor107/08/2026
CARBONQUEST, INCGeneral Contractor107/08/2026
HIGH QUALITY ELECTRIC OFElectrical103/22/2026
J. CAIAZZO PLBG & HTG CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THE ORDERING FORCE9406111/25/2024
OUTSOURCE SPECIAL INSPECT2827602/22/2024
JON LIBASCI3068109/14/2023
HOWARD L ZIMMERMAN ARCHIT1712108/09/2023
PONDOSA DESIGN INC.5126108/09/2023
Building Lifecycle
All (154)Filed (18)Permit Issued (21)Signed Off (7)Facade (FISP) (12)Violation (60)Inspection (6)Special Inspection (30)
01/30/2026
Cycle 10 facade report submitted
01/30/2026
Cycle 10 facade report signed — SAFE
01/21/2026
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00792748-I1
01/21/2026
Signed off — Alteration
CONCRETE REPAIRS, BRICK MASONRY JOINT CUTTING/ REPOINTING, BRICK REPLACEMENT & SEALANT REFURBISHMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00903995-S1
01/21/2026
Cycle 10 facade inspection completed
01/14/2026
Signed off — Alteration
CONCRETE REPAIRS, BRICK MASONRY JOINT CUTTING/ REPOINTING, BRICK REPLACEMENT & SEALANT REFURBISHMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00903995-I1
12/13/2025
Violation issued (ECB, closed)
Unknown
11/20/2025
Signed off — Alteration
REPLACE EXISTING CONDENSING UNIT ON ROOF LEVEL TO PROVIDE SERVICE TO RESIDENTIAL UNIT 52G AND UNIT 52BC. AND OBTAINING EQUIPMENT USE PERMIT. ALL AS PER PLAN . NO CHANGE IN USE EGRESS OR OCCUPANCY.
M00932237-I1
10/21/2025
Permit issued — General Construction
M00903995-I1-GC
10/21/2025
Permit issued — General Construction
M01145495-I1-GC
08/18/2025
Permit issued — Sidewalk Shed
M00792748-I1-SH
07/23/2025
Permit issued — Mechanical Systems
M00932237-I1-MS
07/07/2025
Permit issued — Suspended Scaffold
M00903995-S1-SC
04/15/2025
Permit issued — Protection and Mechanical Methods
M01209661-I1-PMM
04/11/2025
Filed — Alteration
INSTALLATION OF OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01209661-I1
12/09/2024
Filed — Alteration
CONCRETE REPAIRS, BRICK MASONRY JOINT CUTTING/ REPOINTING, BRICK REPLACEMENT & SEALANT REFURBISHMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00903995-P1
12/06/2024
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00792748-P2
11/29/2024
Permit issued — General Construction
M01145495-I1-GC
11/25/2024
Filed — Alteration
LIMITED GARAGE REPAIRS. NO CHANGE TO LAYOUT, USE, EGRESS, OR OCCUPANCY.
M01145495-I1
11/01/2024
Permit issued — General Construction
M00903995-I1-GC
10/02/2024
Filed — Alteration
CONCRETE REPAIRS, BRICK MASONRY JOINT CUTTING/ REPOINTING, BRICK REPLACEMENT & SEALANT REFURBISHMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00903995-S1
10/02/2024
Permit issued — Suspended Scaffold
M00903995-S1-SC
08/16/2024
Permit issued — Sidewalk Shed
M00792748-I1-SH
02/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
02/29/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Christian Meszaros
02/29/2024
Special inspection requirement — Fire-Resistance Rated Construction
JONAR MADRIAGA
02/29/2024
Special inspection requirement — Energy Code Compliance Inspections
JONAR MADRIAGA
02/29/2024
Special inspection requirement — Final
JONAR MADRIAGA
02/29/2024
Special inspection requirement — Lighting controls
JONAR MADRIAGA
02/29/2024
Special inspection requirement — Interior lighting power
JONAR MADRIAGA
02/22/2024
Filed — Alteration
HEREWITH FILING FOR INTERIOR RENOVATIONS AS PER PLANS. NOCHANGE IN USE,EGRESS OR OCCUPANCY.
M00738165-P1
02/21/2024
Signed off — Alteration
INSTALLATION OF CARBONQUEST CARBON CAPTURE SYSTEM IN CONJUNCTION WITH OTCR SUBMITTAL CODE #58-22. NO CHANGE IN EGRESS OR OCCUPANCY.
M00738138-I1
02/09/2024
Special inspection requirement — Energy Code Compliance Inspections
JONAR MADRIAGA
02/09/2024
Special inspection requirement — Mechanical Systems
JONAR MADRIAGA
02/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
02/09/2024
Special inspection requirement — Chimneys and vents
JONAR MADRIAGA
02/09/2024
Special inspection requirement — HVAC-R and service water heating system controls
JONAR MADRIAGA
02/09/2024
Special inspection requirement — Maintenance information
JONAR MADRIAGA
02/09/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JONAR MADRIAGA
02/09/2024
Special inspection requirement — HVAC-R and service water heating equipment
JONAR MADRIAGA
02/09/2024
Special inspection requirement — Ventilation and air distribution system
JONAR MADRIAGA
02/09/2024
Special inspection requirement — Final
JONAR MADRIAGA
02/08/2024
Filed — Alteration
INSTALLATION OF CARBONQUEST CARBON CAPTURE SYSTEM IN CONJUNCTION WITH OTCR SUBMITTAL CODE #58-22. NO CHANGE IN EGRESS OR OCCUPANCY.
M00738138-P1
02/08/2024
Signed off — Alteration
addition and relocation of sprinkler heads to provide code sprinkler coverage as per plans. no change in use, egress or occupancy.
M00738160-I1
02/06/2024
Permit issued — Mechanical Systems
M00738138-I1-MS
02/06/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
JONAR MADRIAGA
02/06/2024
Special inspection requirement — Interior lighting power
02/06/2024
Special inspection requirement — Lighting controls
02/01/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/31/2024
Signed off — Alteration
herewith filing for plumbing modifications for carbon capture as per plans. no change in use, egress or occupancy.
M00738145-I1
01/12/2024
Filed — Alteration
INSTALLATION OF CARBONQUEST CARBON CAPTURE SYSTEM IN CONJUNCTION WITH OTCR SUBMITTAL CODE #58-22. NO CHANGE IN EGRESS OR OCCUPANCY.
M00738138-S1
01/10/2024
Special inspection requirement — Tenant Protection Plan Compliance
11/08/2023
Permit issued — General Construction
M00903995-I1-GC
09/14/2023
Filed — Alteration
REPLACE EXISTING CONDENSING UNIT ON ROOF LEVEL TO PROVIDE SERVICE TO RESIDENTIAL UNIT 52G AND UNIT 52BC. AND OBTAINING EQUIPMENT USE PERMIT. ALL AS PER PLAN . NO CHANGE IN USE EGRESS OR OCCUPANCY.
M00932237-I1
09/13/2023
Special inspection requirement — Tenant Protection Plan Compliance
jon libasci
09/11/2023
Special inspection requirement — Final
jacob Kanner
09/11/2023
Special inspection requirement — Mechanical Systems
jon libasci
09/11/2023
Special inspection requirement — Energy Code Compliance Inspections
jon libasci
09/11/2023
Special inspection requirement — Ventilation and air distribution system
jon libasci
09/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
Latest 60 of 154 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offLCS RESTORATION CORP10/21/2025
DOB NOWGeneral ConstructionPermit IssuedLCS RESTORATION CORP10/21/2025
DOB NOWSidewalk ShedSigned-offLCS RESTORATION CORP08/18/2025
DOB NOWMechanical SystemsSigned-offGLENWOOD MANAGEMENT CORP07/23/2025
DOB NOWSuspended ScaffoldSigned-offPEDROL CONTRACTING INC07/07/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedLCS RESTORATION CORP04/15/2025
DOB NOWGeneral ConstructionPermit IssuedLCS RESTORATION CORP11/29/2024
DOB NOWGeneral ConstructionSigned-offLCS RESTORATION CORP11/01/2024
DOB NOWSuspended ScaffoldSigned-offPEDROL CONTRACTING INC10/02/2024
DOB NOWSidewalk ShedSigned-offLCS RESTORATION CORP08/16/2024
DOB NOWMechanical SystemsSigned-offDUAL FUEL COMPANY LLC02/06/2024
DOB NOWGeneral ConstructionSigned-offLCS RESTORATION CORP11/08/2023
DOB NOWSidewalk ShedSigned-offLCS RESTORATION CORP08/18/2023
DOB NOWGeneral ConstructionPermit IssuedCARBONQUEST, INC06/21/2023
DOB NOWSprinklersSigned-offANTHONY CAIAZZO06/01/2023
DOB NOWMechanical SystemsSigned-offDUAL FUEL COMPANY LLC12/01/2022
DOB NOWPlumbingSigned-offJ. CAIAZZO PLBG & HTG COR10/06/2022
DOB NOWSprinklersSigned-offANTHONY CAIAZZO10/06/2022
DOB NOWSidewalk ShedSigned-offLCS RESTORATION CORP08/18/2022
DOB NOWSignPermit IssuedSERVICE SIGN ERECTORS CO11/01/2019
DOB NOWSignPermit IssuedSERVICE SIGN ERECTORS CO11/01/2019
BISMHISSUEDJ T & T AIR CONDITIONING12/06/2017
BISOTISSUEDARA CONSTRUCTION CORP12/04/2017
BISMHISSUEDARA CONSTRUCTION CORP12/04/2017
BISOTISSUEDSTEVE BLAIR01/09/2014
BISEQISSUEDOUTDOOR INSTALLATIONS LLC08/19/2010
BISPLISSUEDGEORGE BATEMAN PLBG AND HTG05/27/2004
BISMHISSUEDEAST 39TH TEALTY LLC05/05/2004
BISPLISSUEDGEORGE S. BATEMAN PLG AND HTG01/17/2003
BISSPISSUEDACCURATE MECHANICAL INC01/09/2003
BISMHISSUEDWILLIAMS STREET LIMITED PARTNER01/08/2003
BISOTISSUEDE. 39TH REALTY11/25/2002
BISPLISSUEDGEORGE S BATEMAN PLBG& HTG11/04/2002
BIS—ISSUEDEAST 39TH REALTY LLC10/01/2002
BISMHISSUEDEAST 39TH REALTY LLC10/01/2002
BISMHISSUEDEAST 39TH REALTY LLC12/05/2001
BISOTISSUEDEAST 39TH REALTY LLC12/05/2001
BIS—ISSUEDEAST 39TH REALTY LLC06/18/1999
BIS—ISSUEDEAST 39TH REALTY LLC06/09/1999
BISEQISSUEDEAST 39TH REALTY LLC06/09/1999
+ 28 more permits on file
1 project · most recent 02/08/2024
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
02/08/2024Signed-offDUAL FUEL CORPAir Conditioning Systems, Heating Systems
Cooling
Daikin W.LVW.1.096.BY.S.Y.Y.Y 80,000 BTU · Wshp ×1
Heating
Daikin W.LVW.1.096.BY.S.Y.Y.Y 86,000 BTU · Wshp ×1
6 projects · most recent 08/09/2026
General Wiring Lighting
FiledStatusContractorScope
08/09/2026Permit IssuedDVM ELECTRICAL SERVICES LGeneral Wiring
05/04/2023Permit IssuedHIGH QUALITY ELECTRIC OF—
12/01/2022CompleteDELUXE ELECL & MAINT CORP1 meters, 1 new_meters
05/31/2022Permit IssuedROBERT CHIMENTI2 meters, 1 new_meters
12/22/2021Permit IssuedP.S. MARCATO ELEV. CO INC—
02/09/2018CompleteNOVA ELECTRIC LLCGeneral Wiring, Lighting
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
02/01/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/21/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/16/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/26/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/01/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/01/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
02/29/2024Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
02/29/2024Alternative Materials - OTCR Buildings Bulletin NumberChristian Meszarosspecial
02/29/2024Fire-Resistance Rated ConstructionJONAR MADRIAGAprogress
02/29/2024Energy Code Compliance InspectionsJONAR MADRIAGAprogress
02/29/2024FinalJONAR MADRIAGAprogress
02/29/2024Lighting controlsJONAR MADRIAGAenergy_progress
02/29/2024Interior lighting powerJONAR MADRIAGAenergy_progress
02/09/2024Energy Code Compliance InspectionsJONAR MADRIAGAprogress
02/09/2024Mechanical SystemsJONAR MADRIAGAspecial
02/09/2024Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
02/09/2024Chimneys and ventsJONAR MADRIAGAspecial
02/09/2024HVAC-R and service water heating system controlsJONAR MADRIAGAenergy_progress
02/09/2024Maintenance informationJONAR MADRIAGAenergy_progress
02/09/2024HVAC-R and service water piping design and insulationJONAR MADRIAGAenergy_progress
02/09/2024HVAC-R and service water heating equipmentJONAR MADRIAGAenergy_progress
02/09/2024Ventilation and air distribution systemJONAR MADRIAGAenergy_progress
02/09/2024FinalJONAR MADRIAGAprogress
02/06/2024Alternative Materials - OTCR Buildings Bulletin NumberJONAR MADRIAGAspecial
02/06/2024Interior lighting power—energy_progress
02/06/2024Lighting controls—energy_progress
01/10/2024Tenant Protection Plan Compliance—special
09/13/2023Tenant Protection Plan Compliancejon libascispecial
09/11/2023Finaljacob Kannerprogress
09/11/2023Mechanical Systemsjon libascispecial
09/11/2023Energy Code Compliance Inspectionsjon libasciprogress
Latest 25 of 42.
▾Documents — 171 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch16
09/02/2026M00738160-I1Request digital key ↗
09/02/2026M00738145-I1Request digital key ↗
08/31/2026M00792748-P1Request digital key ↗
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - Sign2
09/05/2026M00251578-I1Request digital key ↗
09/05/2026M00251638-I1Request digital key ↗
▸Applications & Permits19
▸BISPLAN / WORK APPROVAL APPLICATION13
12/06/2017123243622Open ↗
12/01/2017123241465Open ↗
11/30/2017123241465Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION6
12/06/2017123243622Open ↗
12/04/2017123241465Open ↗
12/04/2017123241465Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications78
▸DOB NOWProgress Inspector Seal & Signature21
10/02/2026M00251578-I1Open ↗
08/31/2026M00251638-I1Open ↗
08/28/2026M00903995-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
09/02/2026M00738160-I1Open ↗
09/02/2026M00738145-I1Open ↗
08/31/2026M00792748-P2Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
08/31/2026M00738160-I1Open ↗
08/31/2026M00738160-I1Open ↗
08/31/2026M00738160-I1Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
08/31/2018123241465Open ↗
01/03/2018123243622Open ↗
12/06/2017123243622Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
12/06/2017123243622Open ↗
11/17/2017123241465Open ↗
01/10/2014121891220Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
12/06/2017123243622Open ↗
11/17/2017123241465Open ↗
11/17/2017123241465Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
08/20/2010120446259Open ↗
07/13/2010120409469Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
02/07/2014121891220Open ↗
01/10/2014121891220Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
01/03/2018123243622Open ↗
12/06/2017123243622Open ↗
▸BISEQUIPMENT USE PERMITS1
01/03/2018123243622Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
07/29/2015121821369Open ↗
▸Safety & Tenant Protection3
▸DOB NOWTenant Protection Plan2
08/13/2026M00251638-I1Open ↗
08/13/2026M00251578-I1Open ↗
▸BISTenant Protection Plan and Notes1
12/06/2017123243622Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
01/10/2014121891220Open ↗
08/20/2010120446259Open ↗
07/13/2010120409469Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/25/2026M01145495-I1Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
01/03/2018123243622Open ↗
12/06/2017123243622Open ↗
12/01/2017123241465Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026M00738165-I1Open ↗
08/13/2026M00738138-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/03/2018123243622Open ↗
▸Approvals, Objections & Sign-offs8
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
12/28/2018101753684Open ↗
08/31/2018123241465Open ↗
01/03/2018123243622Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
08/20/2010120446259Open ↗
07/13/2010120409469Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
08/31/2018123241465Open ↗
01/03/2018123243622Open ↗
12/06/2017123243622Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms12
▸BISEFILING COVER SHEET7
12/06/2017123243622Open ↗
11/17/2017123241465Open ↗
11/17/2017123241465Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM4
12/28/2018101753684Open ↗
08/31/2018123241465Open ↗
01/03/2018123243622Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION1
02/10/2014121891220Open ↗
▸Other Documents4
▸DOB NOWCalculations2
08/13/2026M00903995-S1Open ↗
08/13/2026M00903995-P1Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026M00903995-S1Open ↗
08/13/2026M00903995-P1Open ↗