← Back
BROOKLYN
240 HUNTINGTON STREET
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
6 Open Violations ▸FDNY Report ↗
Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Roof3p · 8 filings · 20 docs
Floor 624p · 8 filings · 20 docs
Floor 523p · 8 filings · 20 docs
Floor 47p · 7 filings · 20 docs
Floor 38p · 7 filings · 20 docs
Floor 29p · 8 filings · 20 docs
Floor 19p · 14 filings · 20 docs
Site & exterior7 filings · 18 docs
Filed — no permit issued2 filings · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MONADNOCK DEVELOPMENT9607/08/2026
300 HUNTINGTON STREET1103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.7203/21/2026
EUROCELT EXPEDITING, INC1003/21/2026
SEARS TAMBASCO ARCHITECTURE203/21/2026
BUILDING BROTHERS603/21/2026
AE DESIGN SOLUTION403/21/2026
LOUIS STRIAR203/21/2026
IKMUELLER ARCHITECTURE603/21/2026
CDEM803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RGF ELECTRIC CORP 004477General Contractor903/22/2026
MONADNOCK GEN'L CONT INCGeneral Contractor907/08/2026
MONADNOCK CONSTRUCTION INGeneral Contractor807/08/2026
RIDGE CONTRACTING CORPGeneral Contractor704/09/2026
AMERICAN STANDARD P&H CORORP.Plumbing607/08/2026
PLATFORM SOLUTIONS, INCGeneral Contractor407/08/2026
GOOD-WILL MECHANICAL CORP.General Contractor403/21/2026
AMERICAN STANDARD PLUMBING &Fire Protection307/08/2026
PAUL SIGNSScaffold207/08/2026
AAA TOTAL PLUMBING INCFire Protection207/08/2026
G.N.T. MECHANICAL LLCFire Protection207/08/2026
ARCH MW LLCGeneral Contractor204/09/2026
AAA TOTAL PLUMBING, INCPlumbing207/08/2026
G.N.T. MECHANICAL LLCPlumbing207/08/2026
RELIANT ELEC'L CONT'G INCElectrical103/22/2026
LUVER PLBG & HTG INCPlumbing107/08/2026
MARATHON MECHANICAL LLCPlumbing107/08/2026
ACTIVE SIGNSScaffold107/08/2026
CITY SIGNSScaffold107/08/2026
SNG BRICK AND STONE INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
H. A. BADER CONSULTANTS2332508/20/2026
MILROSE CONSULTANTS LLC20031002/18/2026
MICHAEL SCADUTO ARCHITECT4833509/22/2025
ENGINEERING CONSULTING SE2050207/10/2025
DOMANI INSPECTION SERVICE8431302/24/2025
DEMERARA ENGINEERING, PLL4248412/11/2024
LEO Y LEE ASSOCIATES2481202/15/2023
Building Lifecycle
All (300)Filed (63)Permit Issued (47)Signed Off (28)Violation (11)Inspection (49)Objection (72)Special Inspection (30)
08/20/2026
Filed — Alteration
FILING ALT 2 MINOR INT. RENOVATION OF EX. COMM. SPACES: 1ST FLR. COFFEE SHOP & 2ND FLR. GRANARY. MINOR PARTITION WORK, NEW COMMERCIAL KITCHEN FIXTURES, NEW WALL & FLOOR FINISHES PER PLANS. NO STRUCTURAL PARTITIONS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01158880-P2
08/18/2026
Special inspection requirement — HVAC-R and service water heating equipment
Ian Mueller
08/18/2026
Special inspection requirement — Post-installed Anchors
Howard Bader
08/18/2026
Special inspection requirement — Energy Code Compliance Inspections
Ian Mueller
08/18/2026
Special inspection requirement — HVAC-R and service water heating system controls
Ian Mueller
08/18/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Ian Mueller
08/18/2026
Special inspection requirement — Maintenance information
Ian Mueller
08/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Howard Bader
08/18/2026
Special inspection requirement — Sprinkler Systems
Howard Bader
08/07/2026
Signed off — Alteration
Mechanical application interior Tenant Fit out work on the 5th Floor as per plans filed in conjunction with #NB 321588885
B01310354-I1
04/17/2026
Signed off — Alteration
FILING ALT 2 MINOR INT. RENOVATION OF EX. COMM. SPACES: 1ST FLR. COFFEE SHOP & 2ND FLR. GRANARY. MINOR PARTITION WORK, NEW COMMERCIAL KITCHEN FIXTURES, NEW WALL & FLOOR FINISHES PER PLANS. NO STRUCTURAL PARTITIONS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01158880-I1
03/27/2026
Signed off — Alteration
B01314771-I1
03/23/2026
Signed off — Alteration
Mechanical application interior Tenant Fit out work on the 5th Floor as per plans filed in conjunction with #NB 321588885
B01310354-S3
03/23/2026
Signed off — Alteration
Mechanical application interior Tenant Fit out work on the 5th Floor as per plans filed in conjunction with #NB 321588885
B01310354-S2
03/23/2026
Signed off — Alteration
Mechanical application interior Tenant Fit out work on the 5th Floor as per plans filed in conjunction with #NB 321588885
B01310354-S1
02/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
02/25/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Drutjons
02/25/2026
Special inspection requirement — Mechanical Systems
Christopher Drutjons
02/25/2026
Special inspection requirement — Energy Code Compliance Inspections
Christopher Drutjons
02/25/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
02/25/2026
Special inspection requirement — Final
Christopher Drutjons
02/25/2026
Special inspection requirement — Shutoff dampers
Christopher Drutjons
02/25/2026
Special inspection requirement — Maintenance information
Christopher Drutjons
02/25/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Drutjons
02/18/2026
Filed — Alteration
Mechanical application interior Tenant Fit out work on the 5th Floor as per plans filed in conjunction with #NB 321588885
B01310354-P1
02/17/2026
Special inspection requirement — Shutoff dampers
Christopher Drutjons
02/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Drutjons
02/17/2026
Special inspection requirement — Final
Christopher Drutjons
02/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Drutjons
02/17/2026
Special inspection requirement — Maintenance information
Christopher Drutjons
02/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
02/17/2026
Special inspection requirement — Mechanical Systems
Christopher Drutjons
02/17/2026
Special inspection requirement — Energy Code Compliance Inspections
Christopher Drutjons
02/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
02/13/2026
Violation issued (FDNY_ORDER, closed)
02/09/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/29/2026
Signed off — Alteration
Interior build-out of commercial space: partitions, lighting, AHUs and ductwork connected to existing VRF heat pump condensers. No change to use, egress, or occupancy.
B01107373-S1
01/16/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/14/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/14/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/07/2026
Signed off — Alteration
General Construction Tenant Fit out work work as per plans filed in conjunction with #NB 321588885
B01191265-S4
01/07/2026
Signed off — Alteration
General Construction Tenant Fit out work work as per plans filed in conjunction with #NB 321588885
B01191265-S2
01/07/2026
Signed off — Alteration
Interior build-out of commercial space: partitions, lighting, AHUs and ductwork connected to existing VRF heat pump condensers. No change to use, egress, or occupancy.
B01107373-I1
01/02/2026
Signed off — Alteration
General Construction Tenant Fit out work work as per plans filed in conjunction with #NB 321588885
B01191265-S3
12/30/2025
Signed off — Alteration
General Construction Tenant Fit out work work as per plans filed in conjunction with #NB 321588885
B01191265-I1
12/23/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/19/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/17/2025
Permit issued — Mechanical Systems
B01310354-S3-MS
12/16/2025
Permit issued — Sign
B01314771-I1-SG
12/15/2025
Filed — Alteration
B01314771-I1
12/09/2025
Permit issued — Mechanical Systems
B01191265-S3-MS
12/09/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/05/2025
Filed — Alteration
Mechanical application interior Tenant Fit out work on the 5th Floor as per plans filed in conjunction with #NB 321588885
B01310354-S3
12/05/2025
Permit issued — General Construction
B01310354-I1-GC
12/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/01/2025
Permit issued — Sprinklers
B01310354-S1-EW-SP
11/25/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/24/2025
Signed off — Alteration
Interior renovation of existing retail store. The work includes new partitioning, hung ceilings, new doors, new lighting and new power receptacles.
B01250142-I1
11/24/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/21/2025
Signed off — Alteration
Herewith filing plans to install two toilets, service sink and kitchen sink in first floor retail store
B01250864-I1
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMONADNOCK GEN'L CONT INC12/17/2025
DOB NOWSignSigned-offPAUL SIGNS, INC12/16/2025
DOB NOWMechanical SystemsSigned-offMONADNOCK GEN'L CONT INC12/09/2025
DOB NOWGeneral ConstructionSigned-offMONADNOCK GEN'L CONT INC12/05/2025
DOB NOWSprinklersSigned-offG.N.T. MECHANICAL LLC12/01/2025
DOB NOWPlumbingSigned-offG.N.T. MECHANICAL LLC11/21/2025
DOB NOWMechanical SystemsSigned-offRIDGE CONTRACTING CORP08/20/2025
DOB NOWPlumbingSigned-offLUVER PLBG & HTG INC08/18/2025
DOB NOWPlumbingSigned-offG.N.T. MECHANICAL LLC08/14/2025
DOB NOWSprinklersSigned-offG.N.T. MECHANICAL LLC08/14/2025
DOB NOWGeneral ConstructionSigned-offRIDGE CONTRACTING CORP08/01/2025
DOB NOWGeneral ConstructionSigned-offMONADNOCK GEN'L CONT INC07/30/2025
DOB NOWPlumbingSigned-offAAA TOTAL PLUMBING INC04/08/2025
DOB NOWMechanical SystemsSigned-offGOODWILL MECHANICAL04/08/2025
DOB NOWPlumbingSigned-offAAA TOTAL PLUMBING, INC04/08/2025
DOB NOWGeneral ConstructionSigned-offRIDGE CONTRACTING CORP04/02/2025
DOB NOWSignSigned-offPAUL SIGNS, INC03/06/2025
DOB NOWMechanical SystemsSigned-offARCH MW LLC01/13/2025
DOB NOWSignSigned-offELMER DAWSON11/06/2024
DOB NOWPlumbingSigned-offMARATHON MECHANICAL LLC10/29/2024
DOB NOWGeneral ConstructionSigned-offARCH MW LLC10/11/2024
DOB NOWMechanical SystemsSigned-offGOODWILL MECHANICAL10/04/2024
DOB NOWPlumbingSigned-offAAA TOTAL PLUMBING INC10/03/2024
DOB NOWSprinklersSigned-offAAA TOTAL PLUMBING, INC10/03/2024
DOB NOWStandpipePermit IssuedAMERICAN STANDARD PLUMBIN08/08/2024
DOB NOWGeneral ConstructionSigned-offRIDGE CONTRACTING CORP07/10/2024
DOB NOWSignSigned-offACTIVE SIGNS INC02/20/2024
DOB NOWMechanical SystemsSigned-offMONADNOCK GEN'L CONT INC11/16/2023
DOB NOWPlumbingPermit IssuedAMERICAN STANDARD P&H CORORP.09/06/2023
DOB NOWStandpipePermit IssuedAMERICAN STANDARD PLUMBIN09/05/2023
DOB NOWSprinklersPermit IssuedAMERICAN STANDARD P&H CORORP.09/01/2023
DOB NOWMechanical SystemsSigned-offMONADNOCK GEN'L CONT INC08/01/2023
DOB NOWConstruction FenceSigned-offMONADNOCK GEN'L CONT INC08/01/2023
DOB NOWStandpipeSigned-offAMERICAN STANDARD P&H CORORP.06/29/2023
DOB NOWMechanical SystemsSigned-offMONADNOCK CONSTRUCTION IN04/05/2023
DOB NOWConstruction FenceSigned-offMONADNOCK CONSTRUCTION IN04/05/2023
DOB NOWSupported ScaffoldSigned-offSNG BRICK AND STONE INC02/02/2023
DOB NOWCurb CutSigned-offMONADNOCK CONSTRUCTION IN02/02/2023
DOB NOWSidewalk ShedSigned-offPLATFORM SOLUTIONS, INC12/20/2022
DOB NOWProtection and Mechanical MethodsSigned-offPLATFORM SOLUTIONS, INC09/27/2022
+ 14 more permits on file
3 projects · most recent 08/20/2026
Air Conditioning Systems Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/20/2026Signed-offGOOD-WILL MECHANICAL CORPHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Lg ARNU123MAA4 1 tons · Vrf Indoor ×1
Ventilation
Captiveaire SIF11DD-HE 360 CFM · Makeup Air ×1
SIF15DD 1,450 CFM · Makeup Air ×1
SIF15DD-SS 1,900 CFM · Kitchen Exhaust ×1
02/18/2026Signed-offMONADNOCK GEN'L CONT INCAir Conditioning Systems
Cooling
Lg ARUM121BTE5 121,000 BTU · Vrf Outdoor ×10
02/24/2025Signed-offMONADNOCK GEN'L CONT INCAir Conditioning Systems
Cooling
Lg ARUM121BTE5 135,000 BTU · Vrf Outdoor ×52
ARUM144BTE 162,000 BTU · Vrf Outdoor ×4
ARUM096BTE 108,000 BTU · Vrf Outdoor ×2
ARUM168BTE 189,000 BTU · Vrf Outdoor ×2
ARUN048GSS4 54,000 BTU · Vrf Outdoor ×2
Greenheck ERVe-45-30H 185,130 BTU · Condensing Unit ×4
ERV-45-15H 149,629 BTU · Condensing Unit ×2
2 projects · most recent 08/20/2026
Sprinkler System
FiledStatusContractorScope
08/20/2026Signed-offAAA TOTAL PLUMBING INCSprinkler System
02/18/2026Signed-offG.N.T. MECHANICAL LLC79 heads
2 projects · most recent 08/20/2026
Water/Sanitary
FiledStatusContractorScope
08/20/2026Signed-offAAA TOTAL PLUMBING, INCWater/Sanitary
02/18/2026Signed-offG.N.T. MECHANICAL LLCWater/Sanitary
12 projects · most recent 02/20/2026
General Wiring Lighting
FiledStatusContractorScope
02/20/2026CompleteFIVE BOROUGH ELECTRIC INCGeneral Wiring
12/23/2025Permit IssuedLIMITLESS ELECT RESOURCES—
11/24/2025CompleteRGF ELECTRIC CORPGeneral Wiring
09/03/2025CompleteRGF ELECTRIC CORPGeneral Wiring
08/08/2025Permit IssuedACCURATE ELEC'L CORP.General Wiring
04/09/2025Permit IssuedRELIANT ELEC'L CONT'G INCGeneral Wiring, Lighting
08/20/2024CompleteELPO ELECTRICAL CONTG INCGeneral Wiring
02/02/2024Permit IssuedRAINBOW ELECTRIC CO., INC—
12/08/2023CompleteRELIANT ELEC'L CONT'G INCGeneral Wiring
01/12/2023CompleteRELIANT ELEC'L CONT'G INC—
12/19/2022CompleteRELIANT ELEC'L CONT'G INC—
10/04/2022CompleteDIFALZO ELECTRIC NY, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 49
DateTypeResultReport
02/09/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/16/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/14/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/14/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/23/2025Pass-Final General Construction Non-Directive 14PassView ↗
12/19/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/09/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/25/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/24/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/20/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/08/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/18/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/29/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/27/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/26/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/25/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/28/2025Fail-Final General Construction Non-Directive 14FailView ↗
02/07/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/05/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/05/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
Latest 25 of 49.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/18/2026Sprinkler SystemsHoward Baderspecial
08/18/2026Energy Code Compliance InspectionsIan Muellerprogress
08/18/2026HVAC-R and service water piping design and insulationIan Muellerenergy_progress
08/18/2026Maintenance informationIan Muellerenergy_progress
08/18/2026HVAC-R and service water heating equipmentIan Muellerenergy_progress
08/18/2026HVAC-R and service water heating system controlsIan Muellerenergy_progress
08/18/2026Fire-Resistant Penetrations and JointsHoward Baderspecial
08/18/2026Post-installed AnchorsHoward Baderspecial
02/25/2026HVAC-R and service water piping design and insulationChristopher Drutjonsenergy_progress
02/25/2026HVAC-R and service water heating equipmentChristopher Drutjonsenergy_progress
02/25/2026FinalChristopher Drutjonsprogress
02/25/2026HVAC-R and service water heating system controlsChristopher Drutjonsenergy_progress
02/25/2026Maintenance informationChristopher Drutjonsenergy_progress
02/25/2026Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
02/25/2026Mechanical SystemsChristopher Drutjonsspecial
02/25/2026Energy Code Compliance InspectionsChristopher Drutjonsprogress
02/25/2026Shutoff dampersChristopher Drutjonsenergy_progress
02/17/2026HVAC-R and service water heating system controlsChristopher Drutjonsenergy_progress
02/17/2026Energy Code Compliance InspectionsChristopher Drutjonsprogress
02/17/2026Mechanical SystemsChristopher Drutjonsspecial
02/17/2026Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
02/17/2026Shutoff dampersChristopher Drutjonsenergy_progress
02/17/2026Maintenance informationChristopher Drutjonsenergy_progress
02/17/2026HVAC-R and service water heating equipmentChristopher Drutjonsenergy_progress
02/17/2026HVAC-R and service water piping design and insulationChristopher Drutjonsenergy_progress
Latest 25 of 150.
▾Documents — 406 on file (BIS + DOB NOW)
▸Plans & Drawings67
▸DOB NOWPlans/Sketch46
08/29/2026B00721241-I1Request digital key ↗
08/28/2026B08044338-I1Request digital key ↗
08/28/2026B08045849-I1Request digital key ↗
Showing 3 of 46 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems8
08/22/2026B00316490-I1Request digital key ↗
08/22/2026B00316490-A1Request digital key ↗
08/22/2026B00316490-P9Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
08/22/2026B00316507-P2Request digital key ↗
08/22/2026B00316507-P1Request digital key ↗
08/22/2026B00316507-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Standpipe4
09/02/2026B00352255-I1Request digital key ↗
08/27/2026B00316509-P1Request digital key ↗
08/27/2026B00316509-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
08/27/2026B00316509-I1Request digital key ↗
08/27/2026B00316509-P2Request digital key ↗
08/15/2026B00316509-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/02/2026B00316516-I1Request digital key ↗
▸Applications & Permits42
▸BISPLAN / WORK APPROVAL APPLICATION30
01/22/2026321588885Open ↗
11/28/2025321588885Open ↗
11/25/2025321588885Open ↗
Showing 3 of 30 on file for this type
▸BISWORK PERMIT APPLICATION6
12/10/2024321588885Open ↗
08/08/2023321588885Open ↗
07/09/2022321588885Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION4
04/22/2022321588885Open ↗
04/22/2022321588885Open ↗
03/21/2022340733479Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
06/24/2020340733479Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/14/2023321588885Open ↗
▸Zoning, Tax Lot & Property Records11
▸BISZONING DIAGRAM4
02/12/2025321588885Open ↗
01/30/2023321588885Open ↗
01/25/2023321588885Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWRestrictive Declaration/Easement 13
08/13/2026B01250703-I1Open ↗
08/13/2026B01250142-I1Open ↗
08/13/2026B01250864-I1Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
02/28/2024321588885Open ↗
▸BISFLOOD ZONE DESIGN CERTIFICATION1
04/22/2022321588885Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
04/22/2022321588885Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
04/22/2022321588885Open ↗
▸Seals & Professional Certifications150
▸DOB NOWDPL-1: Design Professional Seal & Signature64
09/02/2026B00316516-I1Open ↗
08/29/2026B00721241-I1Open ↗
08/28/2026B08008994-P2Open ↗
Showing 3 of 64 on file for this type
▸DOB NOWProgress Inspector Seal & Signature46
09/24/2026B01158880-I1Open ↗
09/24/2026B01158880-I1Open ↗
09/23/2026B01250703-I1Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature35
09/24/2026B01158880-I1Open ↗
09/23/2026B01250703-I1Open ↗
09/01/2026B01310354-P1Open ↗
Showing 3 of 35 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
05/20/2022321588885Open ↗
05/20/2022321588885Open ↗
05/20/2022321588885Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
06/24/2020340733479Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/24/2020340733479Open ↗
▸Trade Schedules & Equipment3
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
12/07/2023321588885Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
11/14/2025321588885Open ↗
▸BISSCHEDULE B - PLUMBING1
01/22/2026321588885Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
04/22/2022321588885Open ↗
06/24/2020340733479Open ↗
▸BISBPP: STREET TREES SITE PLAN1
03/21/2022340733479Open ↗
▸Environmental & Asbestos46
▸DOB NOWOER: Notice to Proceed28
08/22/2026B01158880-S1Open ↗
08/18/2026B01310354-S2Open ↗
08/15/2026B01310354-I1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWOER: Notice of Satisfaction15
08/22/2026B00316490-I1Open ↗
08/22/2026B01158880-S1Open ↗
08/18/2026B01310354-S2Open ↗
Showing 3 of 15 on file for this type
▸BISOER-NNO FOR TCO1
01/17/2025321588885Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
12/14/2023321588885Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
06/17/2022321588885Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
04/22/2022321588885Open ↗
04/22/2022321588885Open ↗
▸BISFENESTRATION AREAS1
10/10/2023321588885Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/07/2023321588885Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
10/10/2023321588885Open ↗
▸BISELECTRIC MOTORS1
12/07/2023321588885Open ↗
▸BISLIGHTING CONTROLS1
12/07/2023321588885Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
05/20/2022321588885Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
12/07/2023321588885Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
12/06/2023321588885Open ↗
▸BISEXTERIOR LIGHTING POWER1
12/07/2023321588885Open ↗
▸BISFENESTRATION AIR LEAKAGE1
10/10/2023321588885Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
12/07/2023321588885Open ↗
▸BISINTERIOR LIGHTING POWER1
12/07/2023321588885Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX4
08/29/2023321588885Open ↗
08/16/2022321588885Open ↗
06/17/2022321588885Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
12/22/2023321588885Open ↗
05/20/2022321588885Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY2
04/22/2022321588885Open ↗
04/22/2022321588885Open ↗
▸BISSOIL REPORT1
04/22/2022321588885Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
04/22/2022321588885Open ↗
▸Approvals, Objections & Sign-offs21
▸BISSCHEDULE A - OCCUPANCY / USE15
11/25/2025321588885Open ↗
11/18/2025321588885Open ↗
09/10/2025321588885Open ↗
Showing 3 of 15 on file for this type
▸BISNYS DEC TIDAL WETLANDS APPROVAL2
04/22/2022321588885Open ↗
06/24/2020340733479Open ↗
▸BISSUPERSEDING LETTER2
12/10/2024321588885Open ↗
08/08/2023321588885Open ↗
▸BISBSA/CPC APPROVAL1
04/22/2022321588885Open ↗
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL1
12/04/2020321588885Open ↗
▸Cost, Insurance & Ownership3
▸BISPROJECT-SPECIFIC GL INSURANCE3
12/10/2024321588885Open ↗
08/08/2023321588885Open ↗
05/20/2022321588885Open ↗
▸Filing & Intake Forms19
▸BISADDITIONAL INFORMATION14
12/05/2025321588885Open ↗
10/30/2025321588885Open ↗
07/02/2025321588885Open ↗
Showing 3 of 14 on file for this type
▸BISBOROUGH INTAKE FORM2
08/08/2023321588885Open ↗
05/20/2022321588885Open ↗
▸BISEFILING COVER SHEET2
02/28/2020321588885Open ↗
02/25/2020321588885Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/24/2020340733479Open ↗
▸Other Documents13
▸BISBPP - SUPPORTING DOCUMENTATION2
02/25/2025340733479Open ↗
02/25/2025340733479Open ↗
▸BISNYS DEC TIDAL WETLANDS MAP2
04/22/2022321588885Open ↗
03/21/2022340733479Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
05/20/2022321588885Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
03/21/2022340733479Open ↗
▸BISVESTIBULES1
10/10/2023321588885Open ↗
▸BISMAINTENANCE INFORMATION1
12/07/2023321588885Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
12/07/2023321588885Open ↗
▸BISTCO - Supporting Documents1
02/28/2024321588885Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
05/02/2023321588885Open ↗
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)1
12/12/2023321588885Open ↗
▸BISSHUTOFF DAMPERS1
12/07/2023321588885Open ↗