← Back
Other miscellaneous
240 LORRAINE STREET
💬 Discuss this project
1950Year Built
1Stories
Z9Building Class
M1-1Zoning
1,500 sfGross Floor Area
1Units
2 Open Violations ▸FDNY Report ↗
Other miscellaneous · Owner of record: 570 SMITH ST RLTY CORP · 20,000 sf lot · 0.08 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
570 SMITH ST RLTY CORP503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STRACAR ENGINEERING, P.C.411/03/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
STRACAR ENGINEERING P C803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CARMINE'S MECHANICAL INCPlumbing307/08/2026
YATZIV CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519110/19/2023
Building Lifecycle
All (26)Filed (4)Permit Issued (4)Signed Off (1)Violation (6)Inspection (5)Special Inspection (6)
03/24/2026
Permit issued — Plumbing
B00961190-I1-PL
12/23/2025
Violation issued (ECB, open)
Construction
11/24/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/03/2025
Filed — Alteration
New water and gas service with RPZ and Atmospheric Hot Water Heating Tank and relevant piping
B00961190-P1
10/31/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/20/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/22/2025
Permit issued — Plumbing
B00961190-I1-PL
04/14/2025
Violation issued (ECB, open)
Construction
08/07/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/05/2024
Filed — Alteration
B01087124-I1
06/07/2024
Violation issued (ECB, closed)
Zoning
06/07/2024
Violation issued (ECB, closed)
Construction
06/07/2024
Violation issued (ECB, closed)
Construction
04/05/2024
Signed off — Alteration
INSTALL NEW EQUIPMENT (2 CEMENT STORAGE SILOS, (1) BATCHER AND CONVEYER IN EXISTING LUMBER YARD AND BUILDING MATERIALS STORAGE (C OF O 181390)
B00939100-I1
02/22/2024
Permit issued — General Construction
B00939100-I1-GC-CX
12/20/2023
Inspection — Certified Gas-Gas-Piping-Underground
Certified
View inspection ↗
12/08/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/21/2023
Permit issued — Plumbing
B00961190-I1-PL
11/10/2023
Filed — Alteration
New water and gas service with RPZ and Atmospheric Hot Water Heating Tank and relevant piping
B00961190-I1
10/19/2023
Filed — Alteration
INSTALL NEW EQUIPMENT (2 CEMENT STORAGE SILOS, (1) BATCHER AND CONVEYER IN EXISTING LUMBER YARD AND BUILDING MATERIALS STORAGE (C OF O 181390)
B00939100-I1
10/11/2023
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
10/11/2023
Special inspection requirement — Structural Steel - Details
Younes Abouyaala
10/11/2023
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
10/11/2023
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Younes Abouyaala
09/25/2023
Special inspection requirement — Final
NAVEEN KUMAR
09/25/2023
Special inspection requirement — Footing and Foundation
Younes Abouyaala
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCARMINE'S MECHANICAL INC03/24/2026
DOB NOWPlumbingSigned-offCARMINE'S MECHANICAL INC04/22/2025
DOB NOWGeneral ConstructionSigned-offYATZIV CORP02/22/2024
DOB NOWPlumbingSigned-offCARMINE'S MECHANICAL INC11/21/2023
BIS—RE-ISSUEDEXPERT CONTR. INC10/31/1991
BISEQISSUEDEXPERT CONTR. INC10/31/1991
1 project · most recent 11/03/2025
Gas Water/Sanitary
FiledStatusContractorScope
11/03/2025Signed-offCARMINE'S MECHANICAL INCGas, Water/Sanitary
1 project · most recent 10/30/2024
FiledStatusContractorScope
10/30/2024Permit IssuedKOPP ELECTRIC CORP1 meters, 1 new_meters
1 project · most recent 10/19/2023
Steel
FiledStatusContractorScope
10/19/2023Signed-offYATZIV CORPSteel
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
11/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/31/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/20/2023Certified Gas-Gas-Piping-UndergroundCertifiedView ↗
12/08/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
10/11/2023Concrete - Cast-In-PlaceYounes Abouyaalaspecial
10/11/2023Structural Steel - DetailsYounes Abouyaalaspecial
10/11/2023Subgrade InspectionsYounes Abouyaalaspecial
10/11/2023Subsurface Conditions – Fill Placement & In-Place DensityYounes Abouyaalaspecial
09/25/2023FinalNAVEEN KUMARprogress
09/25/2023Footing and FoundationYounes Abouyaalaprogress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/26/2026B00939100-I1Request digital key ↗
08/24/2026B01087124-I1Request digital key ↗
08/20/2026B00961190-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/24/2026B01087124-I1Open ↗
08/20/2026B00961190-I1Open ↗
08/13/2026B00939100-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/25/2026B00939100-I1Open ↗
08/25/2026B00939100-I1Open ↗
08/25/2026B00939100-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026B00939100-I1Open ↗
08/25/2026B00939100-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/20/2026B00961190-I1Open ↗
08/13/2026B00961190-P1Open ↗
08/13/2026B00939100-I1Open ↗
▸Other Documents1
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00939100-I1Open ↗