Elevator cooperative
2400 JOHNSON AVENUE
BRONX · BIN 2083244
💬 Discuss this project
1969Year Built
13Stories
D4Building Class
R6Zoning
142,000 sfGross Floor Area
130Units
LL97 CoveredRent Stabilized7 Open Violations ▸FISP: SWARMP
Elevator cooperative · Owner of record: 2400 JOHNSON AVENUE OWNERS INC · 62,550 sf lot · 2.27 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingGeneral
Roof8p · 4 filings · 20 docs
Floor 813p · 1 filing · 7 docs
Floor 7
Floor 6
Floor 5
Floor 4
Floor 34p · 2 filings · 9 docs
Floor 2
Floor 1
Sub-Cellar1p · 1 filing · 11 docs
Sub-Basement9p · 1 filing · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AKAM ASSOCIATES1407/08/2026
AMERICAN TOWER1507/08/2026
AVARGA CONSTRUCTION607/08/2026
2400 JOHNSON AVE OWNERS5403/22/2026
PRESIDENTIAL PROPERTIES203/22/2026
OWNER OF 2400 JOHNSON AVE103/22/2026
PRESIDENTIAL PROPERTY SER103/22/2026
VERIZON WIRELESS103/21/2026
GOODMAN MANAGEMENT603/21/2026
PRESID PROPERTY SERVICES103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CCM CONSULTING GROUP, INC.703/21/2026
JUST ARCHITECTURE403/21/2026
GIG EXPEDITING203/21/2026
LOMBARDO BUILDING CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KMM TELECOMMUNICATIONSGeneral Contractor407/08/2026
RUGOVA GROUP LLCPlumbing407/08/2026
AVARGA CONSTRUCTION CORPGeneral Contractor307/08/2026
ZAMIN CONSTRUCTION CORPGeneral Contractor303/21/2026
HUDSON PLMBING & MCH, LLCPlumbing207/08/2026
LIVOTI ENTERPRISE LLCGeneral Contractor207/08/2026
M. GANNESElectrical103/21/2026
ALEXANDER EUGENEElectrical103/21/2026
FRANQUIZ, DAVIDElectrical103/21/2026
RC3 ELECTRIC, LLCGeneral Contractor107/08/2026
CROCITTO, JR., WILLIAMElectrical103/21/2026
JOSEPH ADAMOElectrical103/21/2026
HIGH QUALITY ELEC.OF NYCElectrical103/22/2026
MAGALLANES, ROBERTOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMARACON TESTING & INSPEC5842703/18/2025
NY RESTORATION TECHNOLOGY6187302/10/2025
HANSEN ENGINEERING PC8174203/22/2022
Building Lifecycle
All (149)Filed (18)Permit Issued (12)Signed Off (2)Facade (FISP) (12)Violation (60)Inspection (8)Objection (8)Special Inspection (29)
12/08/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/08/2025
Violation issued (HPD, open)
B
10/08/2025
Violation issued (HPD, open)
B
10/08/2025
Violation issued (HPD, open)
A
09/26/2025
Signed off — Alteration
X00631167-I1
05/02/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
03/25/2025
Special inspection requirement — Mechanical Systems
CONNIE PISANI
03/25/2025
Special inspection requirement — Final
Scott Chasse
03/18/2025
Filed — Alteration
Verizon - Replacement of existing gas piping as needed per plans. No change to occupancy, use or egress.
X00631248-P2
03/18/2025
Filed — Alteration
X00631167-P1
03/18/2025
Filed — Alteration
Verizon - Replacement of antennas & RRH units on the roof. Removal of cabinets in the existing equipment shelter and reinforcement of existing generator dunnage on the roof. All work is in compliance with TPPN 5/98. No change in use, egress or occupancy.
X00599257-P1
03/13/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/25/2025
Violation issued (HPD, open)
B
02/25/2025
Violation issued (HPD, open)
C
02/19/2025
Special inspection requirement — Final
Hamidreza Saghari
02/19/2025
Special inspection requirement — Interior lighting power
Hamidreza Saghari
02/19/2025
Special inspection requirement — Energy Code Compliance Inspections
Hamidreza Saghari
02/19/2025
Special inspection requirement — Fire-Resistance Rated Construction
Hamidreza Saghari
02/19/2025
Special inspection requirement — Tenant Protection Plan Compliance
02/14/2025
Objection resolved — Addressed
02/14/2025
Objection resolved — Addressed
02/12/2025
Objection raised — Other
02/12/2025
Objection raised — Other
02/10/2025
Filed — Alteration
Interior renovation at the swimming pool area, as per plans filed herewith. No changes in use, egress, or occupancy.
X01109349-P2
02/10/2025
Filed — Alteration
Interior renovation at the swimming pool area, as per plans filed herewith. No changes in use, egress, or occupancy.
X01109349-P1
02/04/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/31/2025
Special inspection requirement — Fire-Resistance Rated Construction
Hamidreza Saghari
01/31/2025
Special inspection requirement — Energy Code Compliance Inspections
Hamidreza Saghari
01/31/2025
Special inspection requirement — Final
Hamidreza Saghari
01/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hamidreza Saghari
01/31/2025
Special inspection requirement — Interior lighting power
Hamidreza Saghari
01/31/2025
Special inspection requirement — Tenant Protection Plan Compliance
01/31/2025
Special inspection requirement — Tenant Protection Plan Compliance
01/07/2025
Permit issued — Plumbing
X01109349-S1-PL
12/20/2024
Permit issued — General Construction
X01105570-I1-GC
12/20/2024
Permit issued — General Construction
X01109349-I1-GC
12/10/2024
Special inspection requirement — Final
Scott Chasse
12/10/2024
Special inspection requirement — Mechanical Systems
CONNIE PISANI
12/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CONNIE PISANI
11/26/2024
Special inspection requirement — Energy Code Compliance Inspections
Hamidreza Saghari
11/26/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Hamidreza Saghari
11/19/2024
Permit issued — General Construction
X01105846-I1-GC
11/18/2024
Special inspection requirement — Final
Mostafa Osman
11/14/2024
Filed — Alteration
Interior renovation to combine existing apartments 8G & 8H on the 8th floor.
X01105846-P2
11/14/2024
Special inspection requirement — Final
Mostafa Osman
11/08/2024
Filed — Alteration
Interior renovation at the swimming pool area, as per plans filed herewith. No changes in use, egress, or occupancy.
X01109349-I1
11/08/2024
Filed — Alteration
Interior renovation at the swimming pool area, as per plans filed herewith. No changes in use, egress, or occupancy.
X01109349-S1
11/06/2024
Filed — Alteration
X01105570-I1
09/16/2024
Special inspection requirement — Insulation placement and R values
Hamidreza Saghari
09/16/2024
Special inspection requirement — Air barrier - visual inspection
Hamidreza Saghari
09/13/2024
Filed — Alteration
Interior renovation to combine existing apartments 8G & 8H on the 8th floor.
X01105846-I1
09/10/2024
Special inspection requirement — Tenant Protection Plan Compliance
Hamidreza Saghari
09/10/2024
Special inspection requirement — Final
Hamidreza Saghari
07/02/2024
Permit issued — Plumbing
X00631248-I1-PL
06/14/2024
Violation issued (HPD, open)
B
06/14/2024
Violation issued (HPD, open)
A
06/14/2024
Violation issued (HPD, closed)
B
05/14/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
04/22/2024
Filed — Alteration
Verizon - Replacement of existing gas piping as needed per plans. No change to occupancy, use or egress.
X00631248-P1
04/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CONNIE PISANI
Latest 60 of 149 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offRUGOVA GROUP LLC01/07/2025
DOB NOWGeneral ConstructionPermit IssuedAVARGA CONSTRUCTION CORP12/20/2024
DOB NOWGeneral ConstructionPermit IssuedAVARGA CONSTRUCTION CORP12/20/2024
DOB NOWGeneral ConstructionPermit IssuedZAMIN CONSTRUCTION CORP11/19/2024
DOB NOWPlumbingSigned-offHUDSON PLMBING & MCH, LLC07/02/2024
DOB NOWPlumbingSigned-offHUDSON PLMBING & MCH, LLC07/14/2023
DOB NOWMechanical SystemsSigned-offRC3 ELECTRIC, LLC06/27/2023
DOB NOWAntennaPermit IssuedKMM TELECOMMUNICATIONS01/19/2023
DOB NOWAntennaPermit IssuedKMM TELECOMMUNICATIONS11/03/2022
DOB NOWSidewalk ShedSigned-offAVARGA CONSTRUCTION CORP09/27/2022
DOB NOWMechanical SystemsSigned-offLIVOTI ENTERPRISE LLC07/23/2022
DOB NOWAntennaPermit IssuedLIVOTI ENTERPRISE LLC07/23/2022
BISPLISSUEDBRANCH PLUMBING LLC09/10/2018
BISOTISSUEDPREMIER SOURCE CONSTRUCT05/10/2018
BISPLISSUEDTHE PLBG & HTG SPECIALIST04/10/2018
BISOTISSUEDPREMIER SOURCE CONSTRUCT10/30/2017
BISOTISSUEDAMP COMMUNICATIONS LLC12/09/2016
BISOTISSUEDAMP COMMUNICATIONS LLC11/10/2015
BISOTISSUEDDUAL FUEL COMPANY LLC09/11/2015
BISPLISSUEDCC CONTROLLED PLBG CO INC05/07/2015
BISOTISSUEDSQUAN CONSTRUCTION SERVIC02/27/2015
BISOTISSUEDMILLENIUM RESTORATION CORP01/12/2015
BISOTISSUEDSQUAN CONSTRUCTION SERVIC03/11/2014
BISOTISSUEDMILLENIUM RESTORATION CORP01/10/2014
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM12/26/2013
BISPLISSUEDPOLGANO PLUMBING INC12/19/2013
BISOTISSUEDNEW VISIONS KITCHEN &*12/13/2013
BISPLISSUEDCC CONTROLLED PLBG CO INC09/06/2013
BISFSISSUEDC C CONTROLLED COMBUSTION09/06/2013
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM06/27/2013
BISOTISSUEDMILLENIUM RESTORATION CORP06/20/2013
BISPLISSUEDALAN E. ROSENBERG, INC.09/14/2012
BISOTISSUEDAUGUST CONSTRUCTION GROUP08/31/2012
BISPLISSUEDALAN E. ROSENBERG, INC.05/09/2012
BISOTISSUEDAUGUST CONSTRUCTION GROUP04/17/2012
BISFSISSUEDC C CONTROLLED COMBUSTION03/28/2007
BISEQISSUEDL & Z RESTORATION CORP01/25/2007
BISFBISSUEDC C CONTROLLED COMBUSTION08/14/2006
BISOTISSUEDL & Z RESTORATION CORP10/17/2005
BISEQISSUEDL & Z RESTORATION CORP10/17/2005
+ 20 more permits on file
3 projects · most recent 03/18/2025
Gas Water/Sanitary
FiledStatusContractorScope
03/18/2025Signed-offHUDSON PLMBING & MCH, LLCGas
02/10/2025Signed-offRUGOVA GROUP LLCWater/Sanitary
03/22/2022——Gas, Water/Sanitary
8 projects · most recent 04/17/2025
General Wiring
FiledStatusContractorScope
04/17/2025Permit IssuedHIGH QUALITY ELEC.OF NYCGeneral Wiring
01/09/2025CompleteKET ELECTRIC LLCGeneral Wiring
12/05/2024Permit IssuedPRIME LIGHT ELEC'L CONSTRGeneral Wiring
10/03/2023CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
10/04/2022CompleteTOP SHELF ELECTRIC CORP—
10/06/2021Permit IssuedC.FALCO ELETL CONT CORPGeneral Wiring
05/15/2020CompleteJAM ELECTRICAL CORP—
06/21/2018Permit IssuedWIZARD ELEC'L CONSTR LLC—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
12/08/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/02/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/13/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/04/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/14/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/07/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/14/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/27/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
03/25/2025Mechanical SystemsCONNIE PISANIspecial
03/25/2025FinalScott Chasseprogress
02/19/2025FinalHamidreza Saghariprogress
02/19/2025Interior lighting powerHamidreza Sagharienergy_progress
02/19/2025Energy Code Compliance InspectionsHamidreza Saghariprogress
02/19/2025Fire-Resistance Rated ConstructionHamidreza Saghariprogress
02/19/2025Tenant Protection Plan Compliance—special
01/31/2025Fire-Resistance Rated ConstructionHamidreza Saghariprogress
01/31/2025Energy Code Compliance InspectionsHamidreza Saghariprogress
01/31/2025FinalHamidreza Saghariprogress
01/31/2025Fire-Resistant Penetrations and JointsHamidreza Sagharispecial
01/31/2025Interior lighting powerHamidreza Sagharienergy_progress
01/31/2025Tenant Protection Plan Compliance—special
01/31/2025Tenant Protection Plan Compliance—special
12/10/2024FinalScott Chasseprogress
12/10/2024Mechanical SystemsCONNIE PISANIspecial
12/10/2024Fire-Resistant Penetrations and JointsCONNIE PISANIspecial
11/26/2024Energy Code Compliance InspectionsHamidreza Saghariprogress
11/26/2024Structural Stability – Alterations of existing buildingsHamidreza Sagharispecial
11/18/2024FinalMostafa Osmanprogress
11/14/2024FinalMostafa Osmanprogress
09/16/2024Insulation placement and R valuesHamidreza Sagharienergy_progress
09/16/2024Air barrier - visual inspectionHamidreza Sagharienergy_progress
09/10/2024Tenant Protection Plan ComplianceHamidreza Sagharispecial
09/10/2024FinalHamidreza Saghariprogress
Latest 25 of 29.
▾Documents — 277 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
08/24/2026X00680780-I1Request digital key ↗
08/24/2026X08009919-P1Request digital key ↗
08/24/2026X08009919-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸Applications & Permits39
▸BISWORK PERMIT APPLICATION20
10/29/2018220620237Open ↗
05/22/2018220620237Open ↗
04/13/2018220620237Open ↗
Showing 3 of 20 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION16
01/19/2018220453738Open ↗
10/19/2017220620237Open ↗
10/10/2017220620237Open ↗
Showing 3 of 16 on file for this type
▸BISAFTER-HOUR WORK PERMIT APPLICATION3
11/04/2013220282815Open ↗
11/04/2013220282815Open ↗
10/09/2013220282815Open ↗
▸Seals & Professional Certifications78
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION26
03/05/2018220453738Open ↗
02/21/2018220453738Open ↗
10/27/2017220620237Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/24/2026X00680780-I1Open ↗
08/24/2026X00680850-I1Open ↗
08/21/2026X00631248-P2Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/01/2026X00631167-I1Open ↗
08/30/2026X01109349-I1Open ↗
08/30/2026X01109349-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/07/2026X00631248-P1Open ↗
09/01/2026X00631167-I1Open ↗
08/31/2026X01109349-P1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
04/05/2016220329856Open ↗
09/11/2015220381192Open ↗
09/13/2013220329856Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
04/05/2016220329856Open ↗
09/11/2015220381192Open ↗
09/13/2013220329856Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
08/25/2012220222060Open ↗
04/18/2012220179740Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/27/2013240029223Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/27/2013240029223Open ↗
▸Trade Schedules & Equipment20
▸BISSELF-CERT PLUMBING NOTICE8
12/07/2015220329856Open ↗
12/01/2015220329856Open ↗
09/27/2014220346409Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING4
12/07/2013220346409Open ↗
09/13/2013220329856Open ↗
08/25/2012220222060Open ↗
Showing 3 of 4 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION4
12/07/2015220329856Open ↗
12/07/2015220329856Open ↗
12/07/2015220329856Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
10/10/2017220620237Open ↗
12/07/2015220489941Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
09/13/2013220329856Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
12/07/2015220329856Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
10/10/2017220620237Open ↗
▸Environmental & Asbestos27
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
08/24/2026X00680780-I1Open ↗
08/21/2026X00631248-P2Open ↗
08/21/2026X00631248-P1Open ↗
Showing 3 of 16 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
10/10/2017220620237Open ↗
12/15/2015220489941Open ↗
09/11/2015220381192Open ↗
Showing 3 of 9 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
04/18/2012220179740Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
09/13/2013220329856Open ↗
▸Energy Compliance27
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS18
02/21/2018220453738Open ↗
10/27/2017220620237Open ↗
10/10/2017220620237Open ↗
Showing 3 of 18 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
02/21/2018220453738Open ↗
02/04/2016220282815Open ↗
10/30/2015220381192Open ↗
Showing 3 of 7 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
06/27/2013240029223Open ↗
▸BISTECHNICAL REPORT: ENERGY1
04/18/2012220179740Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
06/27/2013240029223Open ↗
▸Approvals, Objections & Sign-offs23
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
03/05/2018220453738Open ↗
02/21/2018220453738Open ↗
04/26/2016220329856Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
04/07/2016220329856Open ↗
02/05/2016220282815Open ↗
10/30/2015220381192Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
08/25/2012220222060Open ↗
Showing 1 of 2 on file for this type
▸BISSUPERSEDING LETTER2
10/29/2018220620237Open ↗
12/22/2016220453738Open ↗
▸Cost, Insurance & Ownership24
▸BISCOST AFFIDAVIT23
02/21/2018220453738Open ↗
10/10/2017220620237Open ↗
04/26/2016220329856Open ↗
Showing 3 of 23 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
08/31/2012220222060Open ↗
▸Filing & Intake Forms19
▸BISEFILING COVER SHEET10
10/10/2017220620237Open ↗
12/07/2015220489941Open ↗
09/11/2015220381192Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION5
01/19/2018220453738Open ↗
04/05/2016220329856Open ↗
02/05/2016220453738Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM2
03/05/2018220453738Open ↗
02/21/2018220453738Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/27/2013240029223Open ↗
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026X00599257-P1Open ↗