← Back
Training school
2400 LINDEN BOULEVARD
BROOKLYN · BIN 3098799
💬 Discuss this project
1964Year Built
2Stories
W4Building Class
M1-1Zoning
21,890 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Training school · Owner of record: HELP/PSI SERVICES CORP. · 23,600 sf lot · 0.93 FAR built · Flood zone X500
Locations of Work
StructuralMechanicalPlumbingFire Protection
Roof6p · 3 filings · 20 docs
Floor 29p · 3 filings · 20 docs
Floor 18p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PILKU CONSTRUCTION SERVC.103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DOWNTOWN ENGINEERS308/06/2026
ADS ENGINEERS1604/30/2026
W. ALLEN ENGINEERING PLLC212/19/2025
AAXD210/09/2025
YSRAEL A. SEINUK, PC305/01/2025
ASB ENGINEERING, P.C.307/23/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BRICOLAGE DESIGNS103/21/2026
WEST AZE403/21/2026
EXPEDIENT CONSULTING4203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
3-G SERVICES LIMITEDGeneral Contractor806/02/2026
ADRIANO PLUMBING & HEATINGFire Protection307/08/2026
NY SIGN ART INCGeneral Contractor207/08/2026
ADRIANO PLMBG & HTG CORPPlumbing206/28/2026
ADRIANO PLUMBING HEATINPlumbing203/22/2026
VAND MECHANICAL INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOWNTOWN ENGINEERS9711308/06/2026
EP INSPECTIONS AND COMMIS70791804/30/2026
PSI AGENCY INC.254305/01/2025
Building Lifecycle
All (181)Filed (29)Permit Issued (15)Signed Off (9)Violation (10)Inspection (8)Objection (80)Special Inspection (30)
08/06/2026
Filed — Alteration
MODIFICATION TO 2ND FLOOR MECHANICAL SYSTEM WITH INSTALLATION OF SPLIT SYSTEM ON THE ROOF. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01313324-P3
07/21/2026
Signed off — Alteration
MODIFICATION OF PLUMBING FIXTURES FOR INTERIOR BUILD OUT . NO CHANGE IN USE EGRESS OR OCCUPANCY.
B01088025-I1
07/09/2026
Filed — Alteration
MODIFICATION TO 2ND FLOOR MECHANICAL SYSTEM WITH INSTALLATION OF SPLIT SYSTEM ON THE ROOF. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01313324-P2
07/08/2026
Special inspection requirement — Post-installed Anchors
Raimundo Ramos
07/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Raimundo Ramos
07/08/2026
Special inspection requirement — Shutoff dampers
Raimundo Ramos
07/08/2026
Special inspection requirement — Energy Code Compliance Inspections
Raimundo Ramos
07/08/2026
Special inspection requirement — Final
Raimundo Ramos
07/08/2026
Special inspection requirement — Mechanical Systems
Raimundo Ramos
07/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
Raimundo Ramos
07/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Raimundo Ramos
07/08/2026
Special inspection requirement — Maintenance information
Raimundo Ramos
07/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
Raimundo Ramos
06/22/2026
Special inspection requirement — Post-installed Anchors
MOLLY GLENN
06/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOLLY GLENN
06/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MOLLY GLENN
06/22/2026
Special inspection requirement — Energy Code Compliance Inspections
MOLLY GLENN
06/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
MOLLY GLENN
06/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
MOLLY GLENN
06/22/2026
Special inspection requirement — Maintenance information
MOLLY GLENN
06/17/2026
Signed off — Alteration
REPLACEMENT OF (1) BOILER. NO CHANGE TO USE EGRESS OR OCCUPANCY.
B01087827-S2
06/17/2026
Signed off — Alteration
REPLACEMENT OF (1) BOILER. NO CHANGE TO USE EGRESS OR OCCUPANCY.
B01087827-I1
06/17/2026
Signed off — Alteration
REPLACEMENT OF (1) BOILER. NO CHANGE TO USE EGRESS OR OCCUPANCY.
B01087827-S1
05/29/2026
Objection resolved — Addressed
05/19/2026
Permit issued — Mechanical Systems
B01313324-I1-MS
05/18/2026
Objection raised — Admin
04/30/2026
Filed — Alteration
MODIFICATION OF PLUMBING FIXTURES FOR INTERIOR BUILD OUT . NO CHANGE IN USE EGRESS OR OCCUPANCY.
B01088025-P7
04/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOLLY GLENN
04/30/2026
Special inspection requirement — Post-installed Anchors
MOLLY GLENN
04/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
MOLLY GLENN
04/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
MOLLY GLENN
04/30/2026
Special inspection requirement — Maintenance information
MOLLY GLENN
04/30/2026
Special inspection requirement — Energy Code Compliance Inspections
MOLLY GLENN
04/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MOLLY GLENN
03/30/2026
Objection resolved — Addressed
03/25/2026
Signed off — Alteration
MODIFICATION TO EXISTING SPRINKLER SYSTEM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01087986-I1
03/18/2026
Objection raised — Scope
03/05/2026
Filed — Alteration
MODIFICATION OF PLUMBING FIXTURES FOR INTERIOR BUILD OUT . NO CHANGE IN USE EGRESS OR OCCUPANCY.
B01088025-P4
03/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MOLLY GLENN
03/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
MOLLY GLENN
03/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
MOLLY GLENN
03/05/2026
Special inspection requirement — Energy Code Compliance Inspections
MOLLY GLENN
03/05/2026
Special inspection requirement — Maintenance information
MOLLY GLENN
03/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOLLY GLENN
02/11/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/04/2026
Filed — Alteration
MODIFICATION OF PLUMBING FIXTURES FOR INTERIOR BUILD OUT . NO CHANGE IN USE EGRESS OR OCCUPANCY.
B01088025-P3
02/02/2026
Signed off — Alteration
NON ILLUMINATED NON ADVERTISING ACCESSORY BUSINESS AWNING ON WALL. tHE AWNING IS BEYOND 200 FT OF PARK OR ARTERIAL HIGHWAY.
B01298744-I1
02/02/2026
Signed off — Alteration
NON ILLUMINATED NON ADVERTISING ACCESSORY BUSINESS AWNING ON WALL. THE AWNING IS BEYOND 200 FT OF PARK OR ARTERIAL HIGHWAY.
B01300210-I1
01/30/2026
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
01/29/2026
Objection resolved — Addressed
01/21/2026
Permit issued — Plumbing
B01088025-I1-PL
01/20/2026
Filed — Alteration
REPLACEMENT OF (1) BOILER. NO CHANGE TO USE EGRESS OR OCCUPANCY.
B01087827-P8
01/20/2026
Filed — Alteration
REPLACEMENT OF (1) BOILER. NO CHANGE TO USE EGRESS OR OCCUPANCY.
B01087827-P7
01/09/2026
Objection resolved — Addressed
01/09/2026
Objection resolved — Addressed
12/23/2025
Signed off — Alteration
FOUNDATION FILED FOR NEW ELEVATOR PIT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01087882-S1
12/23/2025
Signed off — Alteration
FOUNDATION FILED FOR NEW ELEVATOR PIT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01087882-I1
12/19/2025
Filed — Alteration
MODIFICATION TO EXISTING SPRINKLER SYSTEM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01087986-P2
12/18/2025
Filed — Alteration
REPLACEMENT OF (1) BOILER. NO CHANGE TO USE EGRESS OR OCCUPANCY.
B01087827-P5
12/18/2025
Filed — Alteration
REPLACEMENT OF (1) BOILER. NO CHANGE TO USE EGRESS OR OCCUPANCY.
B01087827-P6
Latest 60 of 181 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-off3-G SERVICES LIMITED05/19/2026
DOB NOWPlumbingSigned-offADRIANO PLMBG & HTG CORP01/21/2026
DOB NOWSprinklersSigned-offADRIANO PLUMBING & HEATIN12/17/2025
DOB NOWSprinklersSigned-offADRIANO PLUMBING & HEATIN12/05/2025
DOB NOWGeneral ConstructionSigned-offNY SIGN ART INC11/13/2025
DOB NOWGeneral ConstructionSigned-offNY SIGN ART INC11/13/2025
DOB NOWBoiler EquipmentSigned-offVAND MECHANICAL INC11/07/2025
DOB NOWMechanical SystemsSigned-off3-G SERVICES LIMITED10/24/2025
DOB NOWStructuralSigned-off3-G SERVICES LIMITED04/23/2025
DOB NOWBoiler EquipmentSigned-offVAND MECHANICAL INC04/17/2025
DOB NOWPlumbingSigned-offADRIANO PLMBG & HTG CORP12/30/2024
DOB NOWFoundationSigned-off3-G SERVICES LIMITED12/03/2024
DOB NOWMechanical SystemsSigned-off3-G SERVICES LIMITED11/19/2024
DOB NOWStructuralSigned-off3-G SERVICES LIMITED11/14/2024
DOB NOWSprinklersSigned-offADRIANO PLUMBING & HEATIN09/16/2024
BIS—ISSUED3-G SERVICES LIMITED07/02/2025
BIS—ISSUED3-G SERVICES LIMITED07/11/2024
BISOTISSUEDBROADCO CONSTRUCTION CORP05/04/2016
BISOTISSUEDBROADCO CONSTRUCTION CORP12/02/2015
BISEQISSUEDPILKU CONSTRUCTION SERVIC07/08/2015
BISEQISSUEDPILKU CONSTRUCTION SERVIC07/14/2014
2 projects · most recent 08/06/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/06/2026Signed-off3-G SERVICES LIMITEDHeating and Air Conditioning Systems
Heat / Cool
Lg ZRNU123SJSA 300 CFM · Vrf Indoor ×3
ZRNU243SKSA 537 CFM · Vrf Outdoor ×3
ZRNU363SRAA 883 CFM · Vrf Indoor ×2
ZRNU073SJSA 254 CFM · Vrf Indoor ×1
ZRNU093SJSA 275 CFM · Vrf Indoor ×1
ZRUM072BTE6 72,000 BTU · Vrf Outdoor ×1
ZRUM121BTE6 119,000 BTU · Vrf Outdoor ×1
CHV6-072URB 683,000 BTU · Heat Pump Outdoor ×2
Cooper & Hunter CHV-12WTU 365 CFM · Vrf Indoor ×6
CHV-24WTU 706 CFM · Vrf Indoor ×6
CHV-28WTU 824 CFM · Vrf Indoor ×4
CHV-07WTU 347 CFM · Vrf Indoor ×2
CHV-09WTU 347 CFM · Vrf Indoor ×2
CVH6-120URB 110,700 BTU · Vrf Outdoor ×2
01/20/2026Signed-off3-G SERVICES LIMITEDHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MSZ-GS09NA 1,185 CFM · Split System ×6
MSZ-GS18NA 510 CFM · Split System ×6
NTXSPF18A112A4 1,950 CFM · Condensing Unit ×3
NTXSPF18A112AA 1,950 CFM · Condensing Unit ×3
Trane YSJ072A3S0H0904D0A1A1 2,400 CFM · Rooftop Unit ×3
YSJ210A3S0L0204D0A1A1 6,000 CFM · Rooftop Unit ×3
1 project · most recent 04/30/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/30/2026Signed-offADRIANO PLMBG & HTG CORPGas, Storm, Water/Sanitary
3 projects · most recent 06/15/2026
General Wiring
FiledStatusContractorScope
06/15/2026CompletePOWER ELECTRIC CONTRACTINGeneral Wiring
05/27/2026CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
07/31/2024CompletePOWER ELECTRIC CONTRACTIN—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
02/11/2026Pass-Final Boiler Equipment InspectionPassView ↗
01/30/2026Pass-Final SP - Up to 3 Requested FloorsPassView ↗
12/05/2025Fail-Final SP - Up to 3 Requested FloorsFailView ↗
11/18/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/21/2025Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 105
DateRequirementInspectorRole
07/08/2026Energy Code Compliance InspectionsRaimundo Ramosprogress
07/08/2026Shutoff dampersRaimundo Ramosenergy_progress
07/08/2026HVAC-R and service water heating equipmentRaimundo Ramosenergy_progress
07/08/2026HVAC-R and service water heating system controlsRaimundo Ramosenergy_progress
07/08/2026Maintenance informationRaimundo Ramosenergy_progress
07/08/2026HVAC-R and service water piping design and insulationRaimundo Ramosenergy_progress
07/08/2026FinalRaimundo Ramosprogress
07/08/2026Fire-Resistant Penetrations and JointsRaimundo Ramosspecial
07/08/2026Mechanical SystemsRaimundo Ramosspecial
07/08/2026Post-installed AnchorsRaimundo Ramosspecial
06/22/2026HVAC-R and service water piping design and insulationMOLLY GLENNenergy_progress
06/22/2026Post-installed AnchorsMOLLY GLENNspecial
06/22/2026HVAC-R and service water heating equipmentMOLLY GLENNenergy_progress
06/22/2026Maintenance informationMOLLY GLENNenergy_progress
06/22/2026HVAC-R and service water heating system controlsMOLLY GLENNenergy_progress
06/22/2026Fire-Resistant Penetrations and JointsMOLLY GLENNspecial
06/22/2026Energy Code Compliance InspectionsMOLLY GLENNprogress
04/30/2026HVAC-R and service water heating equipmentMOLLY GLENNenergy_progress
04/30/2026HVAC-R and service water piping design and insulationMOLLY GLENNenergy_progress
04/30/2026Maintenance informationMOLLY GLENNenergy_progress
04/30/2026Fire-Resistant Penetrations and JointsMOLLY GLENNspecial
04/30/2026Post-installed AnchorsMOLLY GLENNspecial
04/30/2026Energy Code Compliance InspectionsMOLLY GLENNprogress
04/30/2026HVAC-R and service water heating system controlsMOLLY GLENNenergy_progress
03/05/2026HVAC-R and service water heating equipmentMOLLY GLENNenergy_progress
Latest 25 of 105.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Brightpointhealth | The Alpi | The AlphaschoolEducationFloor 1
Project B00351851 Alteration · Filing Withdrawn · 07/23/2020
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 206 on file (BIS + DOB NOW)
▸Plans & Drawings29
▸DOB NOWPlans/Sketch26
08/24/2026B01087882-I1Request digital key ↗
08/24/2026B01087882-P1Request digital key ↗
08/24/2026B01087882-S1Request digital key ↗
Showing 3 of 26 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00351855-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/02/2026B00351829-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00351851-I1Request digital key ↗
▸Applications & Permits16
▸BISPLAN / WORK APPROVAL APPLICATION10
07/21/2025322031680Open ↗
09/24/2024322031680Open ↗
07/11/2024322031680Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION5
07/11/2024322031680Open ↗
05/06/2016340326837Open ↗
11/23/2015340326837Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
02/03/2026322031680Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
01/27/2020322031680Open ↗
▸Seals & Professional Certifications92
▸DOB NOWProgress Inspector Seal & Signature37
09/28/2026B01088025-P3Open ↗
09/28/2026B01088025-P3Open ↗
09/28/2026B01088025-P3Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature29
08/24/2026B01087882-P1Open ↗
08/24/2026B01087882-I1Open ↗
08/24/2026B01087882-S1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/28/2026B01088025-P3Open ↗
09/23/2026B01087827-S1Open ↗
09/23/2026B01087827-S2Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
01/27/2020322031680Open ↗
11/02/2016340165038Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
11/23/2015340326837Open ↗
07/14/2014340165038Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
11/23/2015340326837Open ↗
07/14/2014340165038Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
11/23/2015340326837Open ↗
07/14/2014340165038Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
01/27/2020322031680Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form7
08/24/2026B01087882-S1Open ↗
08/24/2026B01087882-I1Open ↗
08/18/2026B01088025-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/20/2026B01313324-I1Open ↗
08/20/2026B01313324-P2Open ↗
08/20/2026B01313324-P3Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/27/2020322031680Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/27/2020322031680Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/23/2015340326837Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
07/14/2014340165038Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
02/04/2022322031680Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY4
02/04/2022322031680Open ↗
11/05/2021322031680Open ↗
11/23/2015340326837Open ↗
Showing 3 of 4 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
07/10/2024322031680Open ↗
▸Approvals, Objections & Sign-offs33
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter27
08/20/2026B01313324-P2Open ↗
08/20/2026B01313324-P3Open ↗
08/19/2026B01087986-I1Open ↗
Showing 3 of 27 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
07/21/2025322031680Open ↗
09/24/2024322031680Open ↗
02/05/2022322031680Open ↗
Showing 3 of 4 on file for this type
▸BISFINAL1
11/23/2015340326837Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/02/2016340165038Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
01/27/2020322031680Open ↗
11/23/2015340326837Open ↗
▸Filing & Intake Forms5
▸BISEFILING JOB APPLICATION COVER SHEET2
11/23/2015340326837Open ↗
07/14/2014340165038Open ↗
▸BISADDITIONAL INFORMATION2
09/26/2025322031680Open ↗
10/08/2024322031680Open ↗
▸BISEFILING COVER SHEET1
01/27/2020322031680Open ↗
▸Other Documents4
▸BISFEE EXEMPTION DOCUMENTATION1
07/14/2014340165038Open ↗
▸BISPLOT DIAGRAM1
01/27/2020322031680Open ↗
▸BISSupporting Document: Fee Exempt1
09/26/2025322031680Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
11/23/2015340326837Open ↗