← Back
Walk-up apt, over six families with stores
2401 2 AVENUE
MANHATTAN · BIN 1054643
💬 Discuss this project
1920Year Built
5Stories
C7Building Class
R9AZoning
7,524 sfGross Floor Area
17Units
Rent Stabilized32 Open Violations ▸
Walk-up apt, over six families with stores · Owner of record: 251 E 123RD ST REALTY, LLC · 2,257 sf lot · 3.33 FAR built · Flood zone X500
Locations of Work
Plumbing
Floor 522p · 1 filing · 6 docs
Floor 421p · 1 filing · 6 docs
Floor 321p · 1 filing · 6 docs
Floor 221p · 1 filing · 6 docs
Floor 121p · 1 filing · 6 docs
Cellar22p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
251 EAST 123 REALTY LLC703/22/2026
251 E 123RD ST REALTY, LLC903/22/2026
SKYWORX CONTRACTING403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSE A. SANTOS P.E.P.C209/19/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A MC PHEE & SONS INCElectrical103/21/2026
GARVEY, MICHAELElectrical103/21/2026
PUJOLS, PElectrical103/21/2026
VITE, GARYElectrical103/21/2026
DOVAL PLBG & HTG CORPPlumbing107/08/2026
Building Lifecycle
All (71)Filed (2)Permit Issued (1)Violation (60)Inspection (6)Special Inspection (2)
04/29/2026
Violation issued (HPD, open)
A
11/17/2025
Violation issued (HPD, closed)
I
05/04/2024
Violation issued (HPD, closed)
B
05/04/2024
Violation issued (HPD, closed)
B
12/12/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/01/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/29/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/26/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/20/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/29/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/21/2023
Special inspection requirement — Tenant Protection Plan Compliance
09/19/2023
Filed — Alteration
PROPOSE TO CAP & REMOVE THE EXISTING GAS METERS AT RESIDENTIAL APARTMENTS AND INSTALL NEW GAS METERS IN THE CELLAR. NEW GAS PIPING THROUGHOUT, AS PER PLANS SUBMITTED HEREWITH.
M00886847-P1
09/19/2023
Special inspection requirement — Tenant Protection Plan Compliance
09/18/2023
Permit issued — Plumbing
M00886847-I1-PL
09/11/2023
Violation issued (ECB, closed)
Construction
06/15/2023
Filed — Alteration
PROPOSE TO CAP & REMOVE THE EXISTING GAS METERS AT RESIDENTIAL APARTMENTS AND INSTALL NEW GAS METERS IN THE CELLAR. NEW GAS PIPING THROUGHOUT, AS PER PLANS SUBMITTED HEREWITH.
M00886847-I1
03/15/2023
Violation issued (HPD, closed)
A
11/03/2022
Violation issued (HPD, closed)
I
02/15/2022
Violation issued (HPD, closed)
A
06/24/2020
Violation issued (HPD, open)
B
06/24/2020
Violation issued (HPD, open)
B
06/24/2020
Violation issued (HPD, open)
B
06/24/2020
Violation issued (HPD, open)
B
12/21/2019
Violation issued (HPD, closed)
C
12/21/2019
Violation issued (HPD, open)
B
12/21/2019
Violation issued (HPD, open)
B
12/21/2019
Violation issued (HPD, open)
A
12/21/2019
Violation issued (HPD, open)
A
12/21/2019
Violation issued (HPD, open)
B
10/25/2019
Violation issued (HPD, closed)
I
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/08/2016
Violation issued (HPD, open)
A
02/08/2016
Violation issued (HPD, closed)
C
02/08/2016
Violation issued (HPD, open)
B
02/08/2016
Violation issued (HPD, open)
B
02/08/2016
Violation issued (HPD, open)
B
06/14/2015
Violation issued (HPD, open)
B
06/14/2015
Violation issued (HPD, closed)
C
06/14/2015
Violation issued (HPD, open)
B
06/14/2015
Violation issued (HPD, open)
B
06/14/2015
Violation issued (HPD, open)
B
06/01/2015
Violation issued (HPD, open)
A
06/01/2015
Violation issued (HPD, open)
A
06/01/2015
Violation issued (HPD, open)
A
06/01/2015
Violation issued (HPD, open)
A
11/14/2014
Violation issued (HPD, open)
B
11/14/2014
Violation issued (HPD, open)
B
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/2007
Violation issued (HPD, closed)
A
02/10/2007
Violation issued (HPD, closed)
B
02/10/2007
Violation issued (HPD, closed)
B
02/10/2007
Violation issued (HPD, closed)
A
02/10/2007
Violation issued (HPD, closed)
B
02/10/2007
Violation issued (HPD, closed)
A
02/10/2007
Violation issued (HPD, closed)
A
02/10/2007
Violation issued (HPD, closed)
A
02/10/2007
Violation issued (HPD, closed)
A
02/10/2007
Violation issued (HPD, closed)
C
02/10/2007
Violation issued (HPD, closed)
C
02/10/2007
Violation issued (HPD, closed)
C
Latest 60 of 71 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedDOVAL PLBG & HTG CORP09/18/2023
BISPLISSUEDBLUEWATER PLBG& HTG INC01/25/2018
BISMHISSUEDRC3 ELECTRIC, LLC01/12/2018
BISMHISSUEDRC3 ELECTRIC, LLC09/18/2017
BISFPISSUEDMASTER FIRE SYSTEMS, INC04/05/2017
BISPLISSUEDDOVAL PLBG & HTG CORP03/07/2017
BISOTISSUEDZARZOSA GENERAL CONSTRUCT02/22/2017
BISOTISSUEDRC3 ELECTRIC, LLC01/22/2016
BISOTISSUEDRC3 ELECTRIC, LLC08/26/2015
BISEQISSUEDSKYWORX CONTRACTING INC07/16/2015
BISEQISSUEDSKYWORX CONTRACTING INC07/02/2015
BISPLISSUEDCAPE PLUMBING INC03/26/2013
BIS—ISSUEDNORTH SHORE NEON SIGN CO INC04/24/1995
BIS—ISSUEDNORTH SHORE NEON SIGN CO04/18/1995
1 project · most recent 09/19/2023
Gas
FiledStatusContractorScope
09/19/2023Permit IssuedA&G GEN'L CONTRACTOR CORPGas
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
12/12/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/01/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/29/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/26/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/20/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/29/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
09/21/2023Tenant Protection Plan Compliance—special
09/19/2023Tenant Protection Plan Compliance—special
▾Documents — 112 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/29/2026M00886847-P1Request digital key ↗
08/29/2026M00886847-I1Request digital key ↗
▸Applications & Permits24
▸BISPLAN / WORK APPROVAL APPLICATION12
07/08/2021120130143Open ↗
07/02/2019122384277Open ↗
06/20/2019122384277Open ↗
Showing 3 of 12 on file for this type
▸BISWORK PERMIT APPLICATION12
01/26/2018122384277Open ↗
01/16/2018122384277Open ↗
09/19/2017122384277Open ↗
Showing 3 of 12 on file for this type
▸Seals & Professional Certifications23
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
10/24/2019122384277Open ↗
05/08/2019122384277Open ↗
04/26/2019122384277Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
02/09/2017123013844Open ↗
07/01/2015140369483Open ↗
06/30/2015140369376Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
07/01/2015140369483Open ↗
06/30/2015140369376Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
02/09/2017123013844Open ↗
03/29/2013121572486Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
07/01/2015140369483Open ↗
06/30/2015140369376Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/29/2026M00886847-P1Open ↗
08/29/2026M00886847-I1Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
02/09/2017123013844Open ↗
05/06/2015122384277Open ↗
▸BISSCHEDULE B - PLUMBING2
03/29/2013121572486Open ↗
08/07/2009120130143Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
08/28/2017122384277Open ↗
▸Environmental & Asbestos8
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
02/09/2017123013844Open ↗
05/06/2015122384295Open ↗
03/29/2013121572486Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/29/2026M00886847-P1Open ↗
08/29/2026M00886847-I1Open ↗
▸BISASBESTOS: EXEMPTION (ASB4)1
05/06/2015122384277Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/07/2009120130143Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
10/24/2019122384277Open ↗
05/08/2019122384277Open ↗
04/26/2019122384277Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
10/24/2019122384277Open ↗
06/02/2016122384295Open ↗
03/14/2016122384295Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
07/01/2015140369483Open ↗
06/30/2015140369376Open ↗
▸Approvals, Objections & Sign-offs10
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
10/24/2019122384277Open ↗
08/01/2017123048193Open ↗
06/02/2016122384295Open ↗
Showing 3 of 4 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION2
08/28/2017122384277Open ↗
08/24/2017122384277Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
03/29/2013121572486Open ↗
08/07/2009120130143Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
07/16/2015140369376Open ↗
▸BISFA LETTER OF DEFECT : FD-FALD1
02/22/2017122384277Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT10
10/24/2019122384277Open ↗
08/28/2017122384277Open ↗
08/01/2017123048193Open ↗
Showing 3 of 10 on file for this type
▸Filing & Intake Forms15
▸BISADDITIONAL INFORMATION5
08/02/2019122384277Open ↗
10/12/2017122384277Open ↗
09/18/2017122384277Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET5
02/09/2017123013844Open ↗
05/06/2015122384295Open ↗
05/06/2015122384277Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM3
10/24/2019122384277Open ↗
05/08/2019122384277Open ↗
04/26/2019122384277Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
07/01/2015140369483Open ↗
06/30/2015140369376Open ↗
▸Other Documents1
▸BISFIRE SUPP ANSUL APPROVL: FD-FSS1
08/01/2017123048193Open ↗