← Back
BuildNYC
Walk-up apt, over six families with stores
2401 2ND AVENUE
MANHATTAN · BIN 1054643
💬 Discuss this project
1920Year Built
5Stories
C7Building Class
R9AZoning
7,524 sfGross Floor Area
17Units
Rent Stabilized32 Active Violations ▸
Walk-up apt, over six families with stores · Owner of record: 251 E 123rd St Realty · 2,257 sf lot · 3.33 FAR built · Flood zone X500
Locations of Work
Plumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof251 East 123 Realty LLC1p · 1 filing · 6 docs
Floor 5251 East 123 Realty LLC21p · 1 filing · 6 docs
Floor 4251 East 123 Realty LLC20p · 1 filing · 6 docs
Floor 3251 East 123 Realty LLC20p · 1 filing · 6 docs
Floor 2251 East 123 Realty LLC20p · 1 filing · 6 docs
Floor 1251 East 123 Realty LLC20p · 1 filing · 6 docs
Cellar251 East 123 Realty LLC21p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
251 E 123 St Realty1503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Jose A. Santos P.E.P.C209/19/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Poseidon Expediting & Consulting SE403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Quality Electrical CoElectrical103/21/2026
Doval Plumbing & HeatingPlumbing107/08/2026
Building Lifecycle
All (69)Filed (2)Permit Issued (1)Violation (60)Inspection (4)Special Inspection (2)
04/29/2026
Violation issued (HPD, open)
A
11/17/2025
Violation issued (HPD, closed)
I
05/04/2024
Violation issued (HPD, closed)
B
05/04/2024
Violation issued (HPD, closed)
B
12/12/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/01/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/29/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/29/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/21/2023
Special inspection requirement — Tenant Protection Plan Compliance
09/19/2023
Filed — Alteration
PROPOSE TO CAP & REMOVE THE EXISTING GAS METERS AT RESIDENTIAL APARTMENTS AND INSTALL NEW GAS METERS IN THE CELLAR. NEW GAS PIPING THROUGHOUT, AS PER PLANS SUBMITTED HEREWITH.
M00886847-P1
09/19/2023
Special inspection requirement — Tenant Protection Plan Compliance
09/18/2023
Permit issued — Plumbing
M00886847-I1-PL
09/11/2023
Violation issued (ECB, closed)
Construction
06/15/2023
Filed — Alteration
PROPOSE TO CAP & REMOVE THE EXISTING GAS METERS AT RESIDENTIAL APARTMENTS AND INSTALL NEW GAS METERS IN THE CELLAR. NEW GAS PIPING THROUGHOUT, AS PER PLANS SUBMITTED HEREWITH.
M00886847-I1
03/15/2023
Violation issued (HPD, closed)
A
11/03/2022
Violation issued (HPD, closed)
I
02/15/2022
Violation issued (HPD, closed)
A
06/24/2020
Violation issued (HPD, open)
B
06/24/2020
Violation issued (HPD, open)
B
06/24/2020
Violation issued (HPD, open)
B
06/24/2020
Violation issued (HPD, open)
B
12/21/2019
Violation issued (HPD, closed)
C
12/21/2019
Violation issued (HPD, open)
B
12/21/2019
Violation issued (HPD, open)
B
12/21/2019
Violation issued (HPD, open)
A
12/21/2019
Violation issued (HPD, open)
A
12/21/2019
Violation issued (HPD, open)
B
10/25/2019
Violation issued (HPD, closed)
I
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/08/2016
Violation issued (HPD, open)
A
02/08/2016
Violation issued (HPD, closed)
C
02/08/2016
Violation issued (HPD, open)
B
02/08/2016
Violation issued (HPD, open)
B
02/08/2016
Violation issued (HPD, open)
B
06/14/2015
Violation issued (HPD, open)
B
06/14/2015
Violation issued (HPD, closed)
C
06/14/2015
Violation issued (HPD, open)
B
06/14/2015
Violation issued (HPD, open)
B
06/14/2015
Violation issued (HPD, open)
B
06/01/2015
Violation issued (HPD, open)
A
06/01/2015
Violation issued (HPD, open)
A
06/01/2015
Violation issued (HPD, open)
A
06/01/2015
Violation issued (HPD, open)
A
11/14/2014
Violation issued (HPD, open)
B
11/14/2014
Violation issued (HPD, open)
B
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/2007
Violation issued (HPD, closed)
A
02/10/2007
Violation issued (HPD, closed)
B
02/10/2007
Violation issued (HPD, closed)
B
02/10/2007
Violation issued (HPD, closed)
A
02/10/2007
Violation issued (HPD, closed)
B
02/10/2007
Violation issued (HPD, closed)
A
02/10/2007
Violation issued (HPD, closed)
A
02/10/2007
Violation issued (HPD, closed)
A
02/10/2007
Violation issued (HPD, closed)
A
02/10/2007
Violation issued (HPD, closed)
C
02/10/2007
Violation issued (HPD, closed)
C
02/10/2007
Violation issued (HPD, closed)
C
10/01/2002
Violation issued (HPD, closed)
B
10/01/2002
Violation issued (HPD, closed)
C
Latest 60 of 69 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedDoval Plumbing & Heating09/18/2023
BISPLISSUEDBluewater Plumbing & Heating01/25/2018
BISMHISSUEDRC3 Electric01/12/2018
BISMHISSUEDRC3 Electric09/18/2017
BISFPISSUEDMaster Fire Systems04/05/2017
BISPLISSUEDDoval Plumbing & Heating03/07/2017
BISOTISSUEDZarzosa General Construction02/22/2017
BISOTISSUEDRC3 Electric01/22/2016
BISOTISSUEDRC3 Electric08/26/2015
BISEQISSUEDSkyworx Contracting07/16/2015
BISEQISSUEDSkyworx Contracting07/02/2015
BISPLISSUEDCape Plumbing03/26/2013
BIS—ISSUEDNorth Shore Neon Sign Co04/24/1995
BIS—ISSUEDNorth Shore Neon Sign Co04/18/1995
1 project · most recent 09/19/2023
Gas
FiledStatusContractorScope
09/19/2023Permit IssuedA&G General ContractorGas
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/12/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/01/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/29/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/29/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
09/21/2023Tenant Protection Plan Compliance—special
09/19/2023Tenant Protection Plan Compliance—special
▾Documents — 112 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/29/2026M00886847-P1Request digital key ↗
08/29/2026M00886847-I1Request digital key ↗
▸Applications & Permits24
▸BISPLAN / WORK APPROVAL APPLICATION12
07/08/2021120130143Open ↗
07/02/2019122384277Open ↗
06/20/2019122384277Open ↗
Showing 3 of 12 on file for this type
▸BISWORK PERMIT APPLICATION12
01/26/2018122384277Open ↗
01/16/2018122384277Open ↗
09/19/2017122384277Open ↗
Showing 3 of 12 on file for this type
▸Seals & Professional Certifications23
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
10/24/2019122384277Open ↗
05/08/2019122384277Open ↗
04/26/2019122384277Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
02/09/2017123013844Open ↗
07/01/2015140369483Open ↗
06/30/2015140369376Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
07/01/2015140369483Open ↗
06/30/2015140369376Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
02/09/2017123013844Open ↗
03/29/2013121572486Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
07/01/2015140369483Open ↗
06/30/2015140369376Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/29/2026M00886847-P1Open ↗
08/29/2026M00886847-I1Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
02/09/2017123013844Open ↗
05/06/2015122384277Open ↗
▸BISSCHEDULE B - PLUMBING2
03/29/2013121572486Open ↗
08/07/2009120130143Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
08/28/2017122384277Open ↗
▸Environmental & Asbestos8
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
02/09/2017123013844Open ↗
05/06/2015122384295Open ↗
03/29/2013121572486Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/29/2026M00886847-P1Open ↗
08/29/2026M00886847-I1Open ↗
▸BISASBESTOS: EXEMPTION (ASB4)1
05/06/2015122384277Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/07/2009120130143Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
10/24/2019122384277Open ↗
05/08/2019122384277Open ↗
04/26/2019122384277Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
10/24/2019122384277Open ↗
06/02/2016122384295Open ↗
03/14/2016122384295Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
07/01/2015140369483Open ↗
06/30/2015140369376Open ↗
▸Approvals, Objections & Sign-offs10
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
10/24/2019122384277Open ↗
08/01/2017123048193Open ↗
06/02/2016122384295Open ↗
Showing 3 of 4 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION2
08/28/2017122384277Open ↗
08/24/2017122384277Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
03/29/2013121572486Open ↗
08/07/2009120130143Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
07/16/2015140369376Open ↗
▸BISFA LETTER OF DEFECT : FD-FALD1
02/22/2017122384277Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT10
10/24/2019122384277Open ↗
08/28/2017122384277Open ↗
08/01/2017123048193Open ↗
Showing 3 of 10 on file for this type
▸Filing & Intake Forms15
▸BISADDITIONAL INFORMATION5
08/02/2019122384277Open ↗
10/12/2017122384277Open ↗
09/18/2017122384277Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET5
02/09/2017123013844Open ↗
05/06/2015122384295Open ↗
05/06/2015122384277Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM3
10/24/2019122384277Open ↗
05/08/2019122384277Open ↗
04/26/2019122384277Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
07/01/2015140369483Open ↗
06/30/2015140369376Open ↗
▸Other Documents1
▸BISFIRE SUPP ANSUL APPROVL: FD-FSS1
08/01/2017123048193Open ↗