← Back
BuildNYC
Elevator apt, fireproof with stores
Third at Bankside
2401 3RD AVENUE · Mott Haven-Port Morris · BIN 2129132
💬 Discuss this project
2019Year Built
25Stories
D6Building Class
M1-3/R8Zoning
448,890 sfGross Floor Area
373Units
LL97 CoveredRent Stabilized26 Active Violations ▸
Elevator apt, fireproof with stores · Owner of record: BOP 2401 Third Avenue Owner · 67,000 sf lot · 6.7 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofBop 2401 Third Avenue LLC37p · 4 filings · 20 docs
Floor 2Bop 2401 Third Avenue LLC3p · 1 filing · 20 docs
Floor 1Brookfield Properties7p · 2 filings · 12 docs
CellarStorage room and sign exit light1 filing · 5 docs
Site & exteriorBop 2401 Third Avenue LLC16p · 4 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BOP 2401 Third Avenue5003/22/2026
Brookfield Properties1707/08/2026
2401 3rd Ave Associates Properties1703/21/2026
BOP 2401 3rd Ave603/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/05/2018$39.6M—— → —— not available
01/20/2015$26.0M—2401 3RD AVENUE, L.L.C. → 2401 3RD AVE ASSOCIATES PROPERTY LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Leaf Architecture210/17/2023
Urban Integrations106/28/2023
Lombardo Professional Engineering401/17/2023
Ospino Engineering103/10/2022
Ventrop Engineering Consulting Group408/26/2021
Paul Perdek, Prof. Engineering206/04/2021
AKRF204/23/2021
Asif Jamil, RA111/10/2020
Mostafa107/17/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DVA Advisors803/21/2026
Evangelista203/21/2026
A1 Expediting Service403/21/2026
Lombardo Building Consultants403/21/2026
Corona403/21/2026
Rigid Structural Design103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Skyline Scaffolding GroupScaffold1507/08/2026
Vik XS ServicesScaffold407/08/2026
R. Acevedo General ContractingGeneral Contractor407/08/2026
G.N.T. MechanicalPlumbing407/08/2026
DoriaScaffold307/08/2026
Olympic Plumbing & Heating ServicePlumbing107/08/2026
Trincity ElectricElectrical103/22/2026
Hudson Meridian ConstructionGeneral Contractor107/08/2026
Ariel ServicesPlumbing107/08/2026
Marathon MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Atlas ATC Engineering8011210/17/2023
Leo Y Lee Associates2481401/17/2023
Langan Engineering, Env, Surveyin1265105/12/2022
Atlantic Engineeringlabor1381408/26/2021
Asif Jamil R.A7506111/10/2020
Building Lifecycle
All (146)Filed (21)Permit Issued (26)Signed Off (8)Violation (60)Inspection (3)Objection (10)Special Inspection (18)
07/15/2026
Permit issued — Suspended Scaffold
X01414645-I1-SC
07/14/2026
Objection resolved — Addressed
06/26/2026
Permit issued — Suspended Scaffold
X01414650-I1-SC
06/26/2026
Objection raised — Other
06/09/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT.
X01414650-I1
06/09/2026
Filed — Alteration
INSTALLATION OF INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS.
X01414645-I1
05/11/2026
Violation issued (HPD, open)
A
04/20/2026
Violation issued (HPD, open)
C
03/27/2026
Violation issued (HPD, open)
A
03/27/2026
Violation issued (HPD, open)
B
03/27/2026
Violation issued (HPD, open)
B
03/27/2026
Violation issued (HPD, open)
A
03/27/2026
Violation issued (HPD, open)
B
03/27/2026
Violation issued (HPD, open)
B
03/27/2026
Violation issued (HPD, open)
B
02/06/2026
Violation issued (HPD, open)
A
02/06/2026
Violation issued (HPD, closed)
C
02/06/2026
Violation issued (HPD, open)
C
01/30/2026
Violation issued (ECB, open)
Elevators
01/20/2026
Violation issued (HPD, open)
B
01/20/2026
Violation issued (HPD, open)
B
01/20/2026
Violation issued (HPD, open)
B
10/18/2025
Violation issued (HPD, open)
B
10/18/2025
Violation issued (HPD, closed)
C
10/18/2025
Violation issued (HPD, open)
B
10/18/2025
Violation issued (HPD, open)
B
08/11/2025
Violation issued (HPD, closed)
I
08/07/2025
Violation issued (HPD, open)
B
08/07/2025
Violation issued (HPD, open)
B
08/07/2025
Violation issued (HPD, open)
A
08/05/2025
Violation issued (HPD, closed)
C
08/05/2025
Violation issued (HPD, closed)
C
08/05/2025
Violation issued (HPD, open)
B
02/14/2025
Permit issued — General Construction
X00895869-I1-GC
10/24/2024
Violation issued (ECB, closed)
Construction
09/20/2024
Signed off — Alteration
Installation of scaffold on 22nd fl terrace as per plans filed herewith. No change in use, egress or occupancy.
X00425395-I1
09/19/2024
Signed off — Alteration
X00695478-I1
09/19/2024
Permit issued — Supported Scaffold
X00425395-I1-SF
09/16/2024
Violation issued (HPD, open)
C
06/27/2024
Violation issued (HPD, open)
B
06/14/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/29/2024
Signed off — Alteration
APPLICATION FOR THE INSTALLATION OF SUSPENDED SCAFFOLD AT ROOF FILED HEREIN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY,
X00750391-I1
04/29/2024
Permit issued — Protection and Mechanical Methods
X00750391-I1-PM
04/20/2024
Violation issued (HPD, open)
C
04/20/2024
Violation issued (HPD, open)
B
04/20/2024
Violation issued (HPD, closed)
B
04/18/2024
Violation issued (HPD, closed)
A
03/14/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/11/2024
Permit issued — Plumbing
X00895869-S1-PL
01/19/2024
Permit issued — General Construction
X00895869-I1-GC
12/27/2023
Permit issued — Earth Work
X00687811-I1-EA
11/06/2023
Signed off — Alteration
X00896892-I1
10/31/2023
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NB CONSTRUCTION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X00278900-I1
10/26/2023
Permit issued — General Construction
X00895869-I1-GC
10/17/2023
Filed — Alteration
General construction work to include new interior tenant layout to existing Community Facility.
X00895869-S1
10/10/2023
Filed — Alteration
General construction work to include new interior tenant layout to existing Community Facility.
X00895869-I1
10/05/2023
Special inspection requirement — Tenant Protection Plan Compliance
GIORGI KHARDZEISHVILI
09/25/2023
Violation issued (ECB, closed)
Construction
08/29/2023
Signed off — Alteration
Installation of boilers in conjunction with new building application # 220151939.
X00452294-I1
06/30/2023
Special inspection requirement — Lighting controls
GIORGI KHARDZEISHVILI
Latest 60 of 146 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedOsmani NYC07/15/2026
DOB NOWSuspended ScaffoldPermit IssuedOsmani NYC06/26/2026
DOB NOWGeneral ConstructionPermit IssuedR. Acevedo General Contracting02/14/2025
DOB NOWSupported ScaffoldSigned-offVik XS Services09/19/2024
DOB NOWProtection and Mechanical MethodsSigned-offDoria04/29/2024
DOB NOWPlumbingSigned-offMarathon Mechanical03/11/2024
DOB NOWGeneral ConstructionPermit IssuedR. Acevedo General Contracting01/19/2024
DOB NOWEarth WorkPermit IssuedUltimate Safety Associates12/27/2023
DOB NOWGeneral ConstructionPermit IssuedR. Acevedo General Contracting10/26/2023
DOB NOWSupported ScaffoldSigned-offSkyline Scaffolding Group06/29/2023
DOB NOWSidewalk ShedSigned-offSkyline Scaffolding Group05/04/2023
DOB NOWProtection and Mechanical MethodsSigned-offDoria06/04/2022
DOB NOWSidewalk ShedSigned-offSkyline Scaffolding Group05/05/2022
DOB NOWProtection and Mechanical MethodsSigned-offVik XS Services03/16/2022
DOB NOWBoiler EquipmentSigned-offDG Mechanical Heating07/06/2021
DOB NOWSidewalk ShedSigned-offSkyline Scaffolding Group05/10/2021
DOB NOWSupported ScaffoldSigned-offVik XS Services04/25/2021
DOB NOWSidewalk ShedSigned-offSkyline Scaffolding Group12/17/2020
DOB NOWSupported ScaffoldSigned-offVik XS Services11/13/2020
DOB NOWPlumbingSigned-offG.N.T. Mechanical07/31/2020
DOB NOWPlumbingSigned-offG.N.T. Mechanical06/17/2020
DOB NOWSidewalk ShedSigned-offSkyline Scaffolding Group05/14/2020
DOB NOWPlumbingSigned-offOlympic Plumbing & Heating Service05/13/2020
DOB NOWPlumbingSigned-offG.N.T. Mechanical04/02/2020
DOB NOWSidewalk ShedSigned-offSkyline Scaffolding Group02/20/2020
DOB NOWPlumbingSigned-offG.N.T. Mechanical07/24/2019
BISOTISSUEDHudson Meridian Construction05/17/2024
BIS—ISSUEDHudson Meridian Construction09/20/2023
BISEQISSUEDHudson Meridian Construction05/22/2023
BIS—ISSUEDHudson Meridian Construction04/11/2023
BISPLISSUEDG.N.T. Mechanical01/23/2023
BISSPISSUEDG.N.T. Mechanical01/23/2023
BISEQISSUEDSkyline Scaffolding Group01/06/2023
BIS—ISSUEDHudson Meridian Construction12/22/2022
BISEQISSUEDHudson Meridian Construction05/27/2022
BIS—ISSUEDHudson Meridian Construction05/27/2022
BISSPISSUEDG.N.T. Mechanical02/22/2022
BISPLISSUEDG.N.T. Mechanical02/22/2022
BISEQISSUEDVik XS Services01/21/2022
BISEQISSUEDVik XS Services01/21/2022
+ 36 more permits on file
1 project · most recent 10/17/2023
Water/Sanitary
FiledStatusContractorScope
10/17/2023Signed-offRite Plumbing & Heating IWater/Sanitary
12 projects · most recent 02/26/2026
General Wiring
FiledStatusContractorScope
02/26/2026CompleteDeltex Electrical Cont. I—
05/02/2025CompleteLouis CorreaGeneral Wiring
05/23/2023CancelledTop Shelf ElectricGeneral Wiring
05/23/2023Permit IssuedTop Shelf ElectricGeneral Wiring
04/21/2023CompleteTop Shelf Electric3 meters, 3 new_meters
07/14/2022CompleteTrincity ElectricGeneral Wiring
03/28/2022CompleteTop Shelf ElectricGeneral Wiring
12/03/2020CancelledTop Shelf Electric—
07/13/2020Permit IssuedTop Shelf ElectricGeneral Wiring
06/22/2020CancelledTop Shelf ElectricGeneral Wiring
05/14/2020CompleteJam Electrical—
12/10/2019CompleteTop Shelf Electric—
2 projects · most recent 06/09/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
06/09/2026Permit IssuedOsmani NYC—
06/09/2026Permit IssuedOsmani NYCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/14/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/14/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/24/2021Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
10/05/2023Tenant Protection Plan ComplianceGIORGI KHARDZEISHVILIspecial
06/30/2023Lighting controlsGIORGI KHARDZEISHVILIenergy_progress
06/30/2023Interior lighting powerGIORGI KHARDZEISHVILIenergy_progress
06/29/2023Fire-Resistant Penetrations and JointsGIORGI KHARDZEISHVILIspecial
06/26/2023FinalGIORGI KHARDZEISHVILIprogress
01/20/2023Post-installed AnchorsLeo Leespecial
01/17/2023Post-installed AnchorsLeo Leespecial
09/15/2022Post-installed AnchorsLeo Leespecial
06/14/2022Post-installed AnchorsLeo Leespecial
09/16/2021Maintenance informationChristopher O'Malleyenergy_progress
09/16/2021HVAC-R and service water heating system controlsChristopher O'Malleyenergy_progress
09/16/2021HVAC-R and service water heating equipmentChristopher O'Malleyenergy_progress
09/16/2021Heating SystemsChristopher O'Malleyspecial
07/29/2021Maintenance informationChristopher O'Malleyenergy_progress
07/29/2021HVAC-R and service water heating system controlsChristopher O'Malleyenergy_progress
07/29/2021HVAC-R and service water heating equipmentChristopher O'Malleyenergy_progress
07/29/2021Heating SystemsChristopher O'Malleyspecial
11/09/2020Post-installed Anchorsasif jamilspecial
▾Documents — 894 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch11
08/24/2026X00695478-I1Request digital key ↗
08/23/2026X00750391-P1Request digital key ↗
08/23/2026X00750391-P3Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment4
08/15/2026X00452294-I1Request digital key ↗
08/15/2026X00452294-P1Request digital key ↗
08/15/2026X00452294-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
08/26/2026X00194182-I1Request digital key ↗
08/25/2026X00346630-I1Request digital key ↗
08/15/2026X00346630-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
08/25/2026X00278900-I1Request digital key ↗
08/15/2026X00278900-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/25/2026X00425395-I1Request digital key ↗
▸Applications & Permits201
▸BISPLAN / WORK APPROVAL APPLICATION141
09/06/2024240296933Open ↗
08/20/2024240296933Open ↗
08/20/2024240296933Open ↗
Showing 3 of 141 on file for this type
▸BISWORK PERMIT APPLICATION44
05/17/2024240310668Open ↗
09/22/2023220151939Open ↗
04/12/2023220151939Open ↗
Showing 3 of 44 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION7
11/01/2022220151939Open ↗
Showing 1 of 7 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation4
09/08/2023240124557Open ↗
Showing 1 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWState DEC Permit1
08/13/2026X00194182-I1Open ↗
▸Zoning, Tax Lot & Property Records17
▸BISADDRESS: NEW HOUSE NUMBER APPROVED8
01/08/2024220151939Open ↗
Showing 1 of 8 on file for this type
▸BISZONING DIAGRAM4
04/08/2024220151939Open ↗
Showing 1 of 4 on file for this type
▸BISFLOOD ZONE DESIGN CERTIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFLOOD ZONE COMPLIANCE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications102
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION25
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/26/2026X00194182-I1Open ↗
08/25/2026X00346630-P1Open ↗
08/25/2026X00346630-I1Open ↗
Showing 3 of 19 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/23/2026X00452294-I1Open ↗
09/02/2026X00425395-I1Open ↗
09/01/2026X00750391-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026X00452294-I1Open ↗
09/23/2026X00452294-I1Open ↗
09/23/2026X00452294-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Trade Schedules & Equipment82
▸BISSCHEDULE B - PLUMBING26
08/24/2023220151939Open ↗
08/21/2023220151939Open ↗
08/17/2023220151939Open ↗
Showing 3 of 26 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT23
09/07/2022220151939Open ↗
09/07/2022220151939Open ↗
09/07/2022220151939Open ↗
Showing 3 of 23 on file for this type
▸BISEQUIPMENT USE PERMITS23
09/07/2022220151939Open ↗
09/07/2022220151939Open ↗
09/07/2022220151939Open ↗
Showing 3 of 23 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSTANDPIPE SYSTEMS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
10/14/2022220696931Open ↗
Showing 1 of 2 on file for this type
▸BISELECTRIC CUT-OFF1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
09/12/2023220151939Open ↗
▸Safety & Tenant Protection3
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Environmental & Asbestos42
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION12
09/12/2024220732642Open ↗
09/12/2024240295435Open ↗
09/12/2024240293142Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWOER: Notice to Proceed12
08/13/2026X00346630-I1Open ↗
08/13/2026X00895869-S1Open ↗
08/13/2026X00278900-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWOER: Notice of Satisfaction4
08/13/2026X00346630-I1Open ↗
08/13/2026X00452294-I1Open ↗
08/13/2026X00895869-I1Open ↗
Showing 3 of 4 on file for this type
▸BISOER NNO FOR TCO PHASE 31
03/29/2023220151939Open ↗
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISINTERIOR LIGHTING POWER1
09/12/2023220151939Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00452294-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00452294-I1Open ↗
▸Inspections & Test Reports86
▸BISTECHNICAL REPORT: RESPONSIBILITY69
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 69 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
09/12/2023220151939Open ↗
▸Approvals, Objections & Sign-offs82
▸BISSCHEDULE A - OCCUPANCY / USE34
04/01/2024220151939Open ↗
03/28/2024220151939Open ↗
10/11/2022220151939Open ↗
Showing 3 of 34 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST19
09/17/2024240295435Open ↗
09/17/2024240293142Open ↗
09/11/2024240296933Open ↗
Showing 3 of 19 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISSUPERSEDING LETTER11
04/12/2023220151939Open ↗
Showing 1 of 11 on file for this type
▸BISFINAL4
09/10/2024240296933Open ↗
05/17/2024240310668Open ↗
10/31/2023240269044Open ↗
Showing 3 of 4 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership23
▸BISPROJECT-SPECIFIC GL INSURANCE11
09/22/2023220151939Open ↗
04/12/2023220151939Open ↗
Showing 2 of 11 on file for this type
▸BISCOST AFFIDAVIT10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
09/10/2024240296933Open ↗
05/17/2024240310668Open ↗
▸Filing & Intake Forms116
▸BISADDITIONAL INFORMATION64
04/01/2024240124557Open ↗
09/08/2023240124557Open ↗
07/31/2023240310668Open ↗
Showing 3 of 64 on file for this type
▸BISBOROUGH INTAKE FORM20
09/07/2022220151939Open ↗
Showing 1 of 20 on file for this type
▸BISEFILING COVER SHEET17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents34
▸BISPLOT DIAGRAM8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION8
11/01/2022220151939Open ↗
Showing 1 of 8 on file for this type
▸BISTCO - Supporting Documents6
09/06/2023220151939Open ↗
02/21/2023220151939Open ↗
01/03/2023220151939Open ↗
Showing 3 of 6 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)2
11/01/2022220151939Open ↗
Showing 1 of 2 on file for this type
▸BISENVIRONMENTAL "E" DEP NOTICE TO PROCEED2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
03/22/2024240124557Open ↗
▸BISSHUTOFF DAMPERS1
09/12/2023220151939Open ↗
▸DOB NOWIRA Certification1
08/15/2026X01414645-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/16/2026X01414650-I1Open ↗
▸DOB NOWCalculations1
08/16/2026X01414650-I1Open ↗