← Back
Old law tenement
2401 ADAM C POWELL BLVD
MANHATTAN · BIN 1060058
💬 Discuss this project
1910Year Built
5Stories
C4Building Class
R7-2Zoning
14,815 sfGross Floor Area
14Units
Rent Stabilized2 Open Violations ▸
Old law tenement · Owner of record: PACT RENAISSANCE COLLABORATIVE LLC · 3,150 sf lot · 4.7 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof3p · 2 filings · 20 docs
Floor 141p · 2 filings · 20 docs
Cellar5p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KAJ NY CONSTRUCTION407/08/2026
OWNERS REP407/08/2026
MONROE CONSTRUCTION203/21/2026
NYCHA203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SLM ARCHITECTURE, P.C.304/02/2025
DAGHER ENGINEERING PLLC1612/13/2024
PAUL PERDEK, PROF. ENG. PLLC203/27/2022
SYED ENGINEERING, P.C.108/02/2021
ARQUITECTURA VARELA207/30/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.3803/21/2026
AE DESIGN SOLUTION403/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DUAL FUEL PLUBING & HTINGPlumbing407/08/2026
DUAL FUEL COMPANY LLCGeneral Contractor407/08/2026
MONROE CONSTRUCTION INCGeneral Contractor303/21/2026
PYRAMID ETC COMPANIES, LLGeneral Contractor207/08/2026
A & E PLUMBING CORPPlumbing207/08/2026
JEMCO ELECT. CONTRS INCElectrical203/22/2026
KAJ NY CONSTRUCTION INCGeneral Contractor107/08/2026
TRIBORO ELEC'L CONTR'G COElectrical103/22/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor107/08/2026
ITKIN ELECTRIC CORP.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M. HAMDI GUNAL, PE, P.C.30001402/28/2025
BUTTERFIELD & O'CONNOR4189107/22/2021
Building Lifecycle
All (127)Filed (24)Permit Issued (13)Signed Off (8)Violation (40)Inspection (12)Special Inspection (30)
08/06/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/29/2026
Violation issued (HPD, open)
A
04/16/2026
Violation issued (HPD, closed)
B
04/16/2026
Violation issued (HPD, closed)
C
01/27/2026
Violation issued (HPD, closed)
C
12/15/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
11/24/2025
Violation issued (HPD, closed)
B
11/24/2025
Violation issued (HPD, closed)
A
11/17/2025
Violation issued (HPD, closed)
I
06/19/2025
Violation issued (HPD, closed)
B
04/02/2025
Filed — Alteration CO
M01014834-P2
04/01/2025
Special inspection requirement — Tenant Protection Plan Compliance
04/01/2025
Special inspection requirement — Energy Code Compliance Inspections
Mehmet Gunal
04/01/2025
Special inspection requirement — Air barrier - visual inspection
Mehmet Gunal
04/01/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Mehmet Gunal
04/01/2025
Special inspection requirement — Lighting in dwelling units
Mehmet Gunal
04/01/2025
Special inspection requirement — Interior lighting power
Mehmet Gunal
03/27/2025
Signed off — Alteration
Plumbing work being filed in conjunction with Alteration 2 application number 140941426 for interior renovation throughout. Replace plumbing fixtures on existing roughing. NO change to use, egress or occupancy.
M00526660-I1
03/26/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/28/2025
Filed — Alteration CO
M01014834-P1
02/12/2025
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00567772-I1
01/15/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
01/06/2025
Permit issued — General Construction
M01014834-I1-GC
12/13/2024
Filed — Alteration
Plumbing work being filed in conjunction with Alteration 2 application number 140941426 for interior renovation throughout. Replace plumbing fixtures on existing roughing. NO change to use, egress or occupancy.
M00526660-P3
12/01/2024
Violation issued (HPD, closed)
C
12/01/2024
Violation issued (HPD, closed)
C
11/21/2024
Violation issued (HPD, closed)
C
11/20/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
10/17/2024
Permit issued — Plumbing
M00526660-I1-PL
09/17/2024
Filed — Alteration
Plumbing work being filed in conjunction with Alteration 2 application number 140941426 for interior renovation throughout. Replace plumbing fixtures on existing roughing. NO change to use, egress or occupancy.
M00526660-P2
03/11/2024
Filed — Alteration CO
M01014834-I1
03/01/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
01/31/2024
Signed off — Alteration
M00519243-I1
01/31/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/23/2024
Filed — Alteration
Plumbing work being filed in conjunction with Alteration 2 application number 140941426 for interior renovation throughout. Replace plumbing fixtures on existing roughing. NO change to use, egress or occupancy.
M00526660-P1
01/18/2024
Violation issued (HPD, closed)
C
01/03/2024
Violation issued (HPD, closed)
B
01/03/2024
Violation issued (HPD, closed)
C
11/27/2023
Permit issued — Mechanical Systems
M00519243-I1-MS
11/21/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
11/08/2023
Permit issued — Plumbing
M00526660-I1-PL
08/02/2023
Signed off — Alteration
Plumbing work as per plans filed..
M00324008-I1
07/26/2023
Signed off — Alteration
boiler work as per plan
M00376113-I1
07/17/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/17/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mehmet Gunal
07/07/2023
Special inspection requirement — HVAC and service water heating system controls
Mehmet Gunal
07/07/2023
Special inspection requirement — HVAC and service water heating equipment
Mehmet Gunal
07/07/2023
Special inspection requirement — Maintenance information
Mehmet Gunal
07/07/2023
Special inspection requirement — Heating Systems
Mehmet Gunal
07/06/2023
Filed — Alteration
boiler work as per plan
M00376113-P3
06/08/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
05/24/2023
Filed — Alteration
boiler work as per plan
M00376113-P2
05/23/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00629808-I1
05/01/2023
Permit issued — Boiler Equipment
M00376113-I1-BE
05/01/2023
Special inspection requirement — Maintenance information
Mehmet Gunal
05/01/2023
Special inspection requirement — HVAC and service water heating equipment
Mehmet Gunal
05/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mehmet Gunal
05/01/2023
Special inspection requirement — HVAC and service water heating system controls
Mehmet Gunal
05/01/2023
Special inspection requirement — Heating Systems
Mehmet Gunal
Latest 60 of 127 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedPYRAMID ETC COMPANIES, LL01/06/2025
DOB NOWPlumbingSigned-offA & E PLUMBING CORP10/17/2024
DOB NOWMechanical SystemsSigned-offPYRAMID ETC COMPANIES, LL11/27/2023
DOB NOWPlumbingSigned-offA & E PLUMBING CORP11/08/2023
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLUBING & HTING05/01/2023
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING11/22/2022
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLUBING & HTING02/16/2022
DOB NOWMechanical SystemsSigned-offDUAL FUEL COMPANY LLC11/16/2021
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC11/15/2021
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING10/25/2021
DOB NOWMechanical SystemsSigned-offDUAL FUEL COMPANY LLC08/13/2021
DOB NOWGeneral ConstructionSigned-offMONROE CONSTRUCTION INC08/10/2021
DOB NOWSidewalk ShedSigned-offKAJ NY CONSTRUCTION INC08/02/2021
BISOTISSUEDMONADNOCK CONSTRUCTION IN11/07/2023
BISOTISSUEDMONADNOCK CONSTRUCTION IN11/17/2022
BISOTISSUEDPYRAMID ETC COMPANIES, LL06/29/2022
BISOTISSUEDPYRAMID ETC COMPANIES, LL01/03/2022
BISOTISSUEDMONADNOCK CONSTRUCTION IN12/24/2021
BISPLISSUEDDUAL FUEL PLUBING & HTING03/27/2006
14 projects · most recent 08/06/2026
General Wiring Boiler Controls
FiledStatusContractorScope
08/06/2026Permit IssuedHIGH BEAM ELECTRIC CORP.General Wiring
10/09/2024CompleteANGLER ELECTRICGeneral Wiring
02/04/2023CompleteITKIN ELECTRIC CORP.Boiler Controls
01/21/2022CompleteTRIBORO ELEC'L CONTR'G CO13 meters, 5 new_meters
08/03/2021CompleteRICHARD NEU—
11/19/2019Permit IssuedH.I. KAYE ELECTRICAL INC.General Wiring
07/06/2018CancelledJEMCO ELECT. CONTRS INCGeneral Wiring
07/06/2018CancelledJEMCO ELECT. CONTRS INCGeneral Wiring
07/06/2018CancelledJEMCO ELECT. CONTRS INCGeneral Wiring
07/06/2018CancelledJEMCO ELECT. CONTRS INCGeneral Wiring
07/06/2018CancelledJEMCO ELECT. CONTRS INCGeneral Wiring
07/06/2018CancelledJEMCO ELECT. CONTRS INCGeneral Wiring
07/06/2018CancelledJEMCO ELECT. CONTRS INCGeneral Wiring
07/06/2018CancelledJEMCO ELECT. CONTRS INCGeneral Wiring
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
08/06/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/15/2025Fail-Final CND-Occupancy InspectionFailView ↗
03/26/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/15/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
11/20/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/01/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
01/31/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/21/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/17/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/17/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/08/2023Pass-Final Boiler Equipment InspectionPassView ↗
12/28/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 60
DateRequirementInspectorRole
04/01/2025Tenant Protection Plan Compliance—special
04/01/2025Energy Code Compliance InspectionsMehmet Gunalprogress
04/01/2025Air barrier - visual inspectionMehmet Gunalenergy_progress
04/01/2025Fenestration and door U-factor and product ratingsMehmet Gunalenergy_progress
04/01/2025Lighting in dwelling unitsMehmet Gunalenergy_progress
04/01/2025Interior lighting powerMehmet Gunalenergy_progress
07/07/2023Fire-Resistant Penetrations and JointsMehmet Gunalspecial
07/07/2023HVAC and service water heating system controls Mehmet Gunalenergy_progress
07/07/2023HVAC and service water heating equipment Mehmet Gunalenergy_progress
07/07/2023Maintenance informationMehmet Gunalenergy_progress
07/07/2023Heating SystemsMehmet Gunalspecial
05/01/2023Maintenance informationMehmet Gunalenergy_progress
05/01/2023HVAC and service water heating equipment Mehmet Gunalenergy_progress
05/01/2023Fire-Resistant Penetrations and JointsMehmet Gunalspecial
05/01/2023HVAC and service water heating system controls Mehmet Gunalenergy_progress
05/01/2023Heating SystemsMehmet Gunalspecial
01/20/2023HVAC and service water heating equipment Mehmet Gunalenergy_progress
01/20/2023Fire-Resistant Penetrations and JointsMehmet Gunalspecial
01/20/2023Energy Code Compliance InspectionsMehmet Gunalprogress
01/20/2023HVAC insulation and sealing Mehmet Gunalenergy_progress
01/20/2023Maintenance informationMehmet Gunalenergy_progress
01/20/2023HVAC and service water heating system controls Mehmet Gunalenergy_progress
01/05/2023HVAC insulation and sealing Mehmet Gunalenergy_progress
01/05/2023Energy Code Compliance InspectionsMehmet Gunalprogress
01/05/2023Fire-Resistant Penetrations and JointsMehmet Gunalspecial
Latest 25 of 60.
▾Documents — 212 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch15
09/03/2026M00519243-I1Request digital key ↗
09/03/2026M00563428-I1Request digital key ↗
09/03/2026M00549949-P1Request digital key ↗
Showing 3 of 15 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/01/2026M00324008-P2Request digital key ↗
09/01/2026M00324008-P3Request digital key ↗
09/01/2026M00324008-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment4
08/30/2026M00376113-P3Request digital key ↗
08/30/2026M00376113-I1Request digital key ↗
08/30/2026M00376113-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00371625-I1Request digital key ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
06/05/2024104371546Open ↗
09/03/2020140948107Open ↗
08/20/2020140941426Open ↗
▸BISWORK PERMIT APPLICATION2
01/03/2022140948107Open ↗
12/24/2021140941426Open ↗
▸Seals & Professional Certifications84
▸DOB NOWProgress Inspector Seal & Signature41
09/26/2026M00371625-I1Open ↗
09/26/2026M00371625-I1Open ↗
09/26/2026M00371625-I1Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature23
09/04/2026M00371625-I1Open ↗
09/03/2026M00563428-I1Open ↗
09/03/2026M00549949-P1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/26/2026M00371625-I1Open ↗
09/26/2026M00371625-I1Open ↗
09/23/2026M00376113-I1Open ↗
Showing 3 of 14 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
09/03/2020140948107Open ↗
08/20/2020140941426Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
09/03/2020140948107Open ↗
08/20/2020140941426Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/03/2020140948107Open ↗
08/20/2020140941426Open ↗
▸Safety & Tenant Protection13
▸DOB NOWTenant Protection Plan8
09/04/2026M00371625-I1Open ↗
09/01/2026M00324008-P1Open ↗
09/01/2026M00324008-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWStreet Tree Checklist3
08/24/2026M01014834-P2Open ↗
08/24/2026M01014834-P1Open ↗
08/24/2026M01014834-I1Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES2
09/03/2020140948107Open ↗
08/20/2020140941426Open ↗
▸Environmental & Asbestos22
▸DOB NOWDEP ACP-5: Asbestos Assessment Report20
09/04/2026M00371625-I1Open ↗
09/03/2026M00549949-P1Open ↗
09/03/2026M00549949-I1Open ↗
Showing 3 of 20 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
09/03/2020140948107Open ↗
08/20/2020140941426Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
02/01/2024140941426Open ↗
01/23/2024140941426Open ↗
01/03/2022140948107Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
09/03/2020140948107Open ↗
08/20/2020140941426Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
01/23/2024140941426Open ↗
03/30/2023140948107Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/30/2023140948107Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
03/30/2023140948107Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00376113-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00519243-I1Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY6
02/01/2024140941426Open ↗
01/23/2024140941426Open ↗
01/03/2022140948107Open ↗
Showing 3 of 6 on file for this type
▸BISMASONRY1
03/30/2023140948107Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
03/30/2023140948107Open ↗
▸Approvals, Objections & Sign-offs31
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter25
09/04/2026M00371625-I1Open ↗
09/03/2026M00563428-I1Open ↗
09/03/2026M00549949-I1Open ↗
Showing 3 of 25 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
02/01/2024140941426Open ↗
03/31/2023140948107Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)2
09/03/2020140948107Open ↗
08/20/2020140941426Open ↗
▸BISFINAL1
03/30/2023140948107Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)1
08/13/2026M00567772-I1Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT2
09/03/2020140948107Open ↗
08/20/2020140941426Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW32
01/23/2024140941426Open ↗
03/30/2023140948107Open ↗
▸Filing & Intake Forms4
▸BISEFILING JOB APPLICATION COVER SHEET2
09/03/2020140948107Open ↗
08/20/2020140941426Open ↗
▸BISADDITIONAL INFORMATION2
10/14/2020140941426Open ↗
09/10/2020140941426Open ↗
▸Other Documents3
▸BISFEE EXEMPTION DOCUMENTATION2
09/03/2020140948107Open ↗
08/20/2020140941426Open ↗
▸BISLOCAL LAW - SUPPORTING DOCUMENTATION1
09/03/2020140948107Open ↗