← Back
One story retail building
2403 WESTCHESTER AVENUE
BRONX · Westchester Square · BIN 2041713
💬 Discuss this project
1926Year Built
1Stories
K1Building Class
R6Zoning
1,673 sfGross Floor Area
1Units
One story retail building · 3,750 sf lot · 0.45 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Roof2p · 1 filing · 18 docs
Floor 13p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KORMAN DESIGN & BUILD212/15/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KENNY LEE ARCHITECT203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L&L CONSTRUCTION DEVELOPGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BIG APPLE GROUP NY A RMA9168112/15/2021
KORMAN DESIGN & BUILD2055212/15/2021
Building Lifecycle
All (28)Filed (2)Permit Issued (1)Special Inspection (25)
06/16/2023
Permit issued — Mechanical Systems
X00502001-I1-GC-CX
12/15/2021
Filed — Alteration
X00520696-I1
05/26/2021
Filed — Alteration
REAR EXTENSION OF 854 SQFT OF EXISTING RETAIL 1587.8 SQFT WORK INCLUDE CONC. FOUNDATION. CONC. BLOCK WALL AND ROOF STRUCTURAL. ALSO HANDICAP TOILET BEING PROPOSED WITH MECH. WORK FOR HEATING & COOLING.
X00502001-I1
05/12/2021
Special inspection requirement — Fenestration air leakage
DAVID UH
05/12/2021
Special inspection requirement — Maintenance information
DAVID UH
05/12/2021
Special inspection requirement — Lighting controls
DAVID UH
05/12/2021
Special inspection requirement — Concrete - Cast-In-Place
DAVID UH
05/12/2021
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
DAVID UH
05/12/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
DAVID UH
05/12/2021
Special inspection requirement — Heating Systems
DAVID UH
05/12/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
DAVID UH
05/12/2021
Special inspection requirement — Structural Cold-Formed Steel
DAVID UH
05/12/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
DAVID UH
05/12/2021
Special inspection requirement — Structural Steel - High Strength Bolting
DAVID UH
05/12/2021
Special inspection requirement — Structural Steel - Welding
DAVID UH
05/12/2021
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Soorjbally Harilall
05/12/2021
Special inspection requirement — Interior lighting power
DAVID UH
05/12/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
DAVID UH
05/12/2021
Special inspection requirement — HVAC-R and service water heating equipment
DAVID UH
05/12/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
DAVID UH
05/12/2021
Special inspection requirement — Air barrier - visual inspection
DAVID UH
05/12/2021
Special inspection requirement — Fenestration areas
DAVID UH
05/12/2021
Special inspection requirement — Insulation placement and R values
DAVID UH
05/12/2021
Special inspection requirement — HVAC-R and service water heating system controls
DAVID UH
05/03/2021
Special inspection requirement — Masonry
DAVID UH
04/12/2021
Special inspection requirement — Final
DAVID UH
04/12/2021
Special inspection requirement — Mechanical Systems
DAVID UH
04/12/2021
Special inspection requirement — Footing and Foundation
DAVID UH
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedL&L CONSTRUCTION DEVELOP06/16/2023
1 project · most recent 05/26/2021
Air Conditioning Systems Refrigeration Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/26/2021Permit IssuedL&L CONSTRUCTION DEVELOPAir Conditioning Systems, Refrigeration Systems, Ventilation Systems
Cooling
Thermal Zone TZGE-460JL100C 60,000 BTU ×2
Refrigeration
Bohn ×1
Witt ×1
1 project · most recent 05/26/2021
Concrete Masonry
FiledStatusContractorScope
05/26/2021Permit IssuedL&L CONSTRUCTION DEVELOPConcrete, Masonry
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
05/12/2021Fenestration air leakageDAVID UHenergy_progress
05/12/2021Maintenance informationDAVID UHenergy_progress
05/12/2021Lighting controlsDAVID UHenergy_progress
05/12/2021Concrete - Cast-In-PlaceDAVID UHspecial
05/12/2021Excavations - Sheeting, Shoring, and BracingDAVID UHspecial
05/12/2021Fire-Resistant Penetrations and JointsDAVID UHspecial
05/12/2021Heating SystemsDAVID UHspecial
05/12/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationDAVID UHspecial
05/12/2021Structural Cold-Formed SteelDAVID UHspecial
05/12/2021Structural Stability – Alterations of existing buildingsDAVID UHspecial
05/12/2021Structural Steel - High Strength BoltingDAVID UHspecial
05/12/2021Structural Steel - WeldingDAVID UHspecial
05/12/2021Subsurface Investigations (Borings/Test Pits)Soorjbally Harilallspecial
05/12/2021Interior lighting powerDAVID UHenergy_progress
05/12/2021Fenestration and door U-factor and product ratingsDAVID UHenergy_progress
05/12/2021HVAC-R and service water heating equipmentDAVID UHenergy_progress
05/12/2021HVAC-R and service water piping design and insulationDAVID UHenergy_progress
05/12/2021Air barrier - visual inspectionDAVID UHenergy_progress
05/12/2021Fenestration areasDAVID UHenergy_progress
05/12/2021Insulation placement and R valuesDAVID UHenergy_progress
05/12/2021HVAC-R and service water heating system controlsDAVID UHenergy_progress
05/03/2021MasonryDAVID UHspecial
04/12/2021FinalDAVID UHprogress
04/12/2021Mechanical SystemsDAVID UHspecial
04/12/2021Footing and FoundationDAVID UHprogress
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/25/2026X00502001-I1Request digital key ↗
08/24/2026X00520696-I1Request digital key ↗
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION4
09/01/2022240309876Open ↗
08/26/2022240309876Open ↗
07/15/2022240309876Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
08/25/2022240309876Open ↗
10/15/2021240309876Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026X00502001-I1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWSpecial Inspector Seal & Signature3
08/26/2026X00502001-I1Open ↗
08/26/2026X00502001-I1Open ↗
08/26/2026X00502001-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026X00502001-I1Open ↗
08/26/2026X00502001-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/25/2026X00502001-I1Open ↗
08/24/2026X00520696-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/15/2021240309876Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/15/2021240309876Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026X00502001-I1Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
08/25/2022240309876Open ↗
10/15/2021240309876Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/25/2026X00502001-I1Open ↗
08/24/2026X00520696-I1Open ↗
▸Inspections & Test Reports5
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026X00502001-I1Open ↗
08/13/2026X00520696-I1Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026X00520696-I1Open ↗
08/13/2026X00502001-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026X00502001-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION2
08/25/2022240309876Open ↗
08/25/2022240309876Open ↗
▸Cost, Insurance & Ownership2
▸DOB NOWCertificate of Insurance1
08/13/2026X00502001-I1Open ↗
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026X00502001-I1Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION2
09/28/2022240309876Open ↗
08/25/2022240309876Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
10/15/2021240309876Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/07/2021240309876Open ↗
▸Other Documents4
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
08/25/2022240309876Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026X00502001-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026X00502001-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026X00502001-I1Open ↗