← Back
BuildNYC
Old law tenement
2405 ADAM CLAYTON POWELL JR BOULEVARD
MANHATTAN · BIN 1060060
💬 Discuss this project
1910Year Built
5Stories
C4Building Class
R7-2Zoning
10,470 sfGross Floor Area
10Units
Rent Stabilized0 Active Violations
Old law tenement · Owner of record: Pact Renaissance Collaborative · 2,733 sf lot · 3.83 FAR built · Flood zone X
Locations of Work
MechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPlumbing renovation and construction18p · 3 filings · 20 docs
Floor 5Plumbing renovation and construction17p · 3 filings · 20 docs
Floor 4Plumbing renovation and construction17p · 3 filings · 20 docs
Floor 3Plumbing renovation and construction17p · 3 filings · 20 docs
Floor 2Plumbing renovation and construction17p · 3 filings · 20 docs
Floor 1Plumbing renovation and construction16p · 3 filings · 20 docs
CellarBoiler room demolition and construction22p · 4 filings · 20 docs
Site & exteriorTemporary sidewalk shed installation7p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Pact Renaissance Collaborative803/22/2026
New York City Housing Authority203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Dagher Engineering1501/06/2025
Paul Perdek, Professional Engineering203/27/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM Zoning3003/21/2026
AE Design Solution403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Dual Fuel CompanyGeneral Contractor407/08/2026
Dual Fuel Plumbing & HeatingPlumbing407/08/2026
A & E PlumbingPlumbing307/08/2026
H.I. Kaye ElectricalElectrical103/22/2026
Core Scaffold SystemsScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M. Hamdi Gunal, PE30001501/06/2025
Building Lifecycle
04/29/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
06/22/2025
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR…
HPD violation · closed
06/18/2025
Boiler inspection report filed
Initial · no defects · Accepted
03/20/2025
Signed off — Alteration
Plumbing work being filed in conjunction with Alteration 2 application number 140941462 for interior renovation throughout. Replace plumbing fixtures on existing roughing. NO change to use, egress or occupancy.
M00527949-I1
03/14/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
102 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offA & E Plumbing10/17/2024
DOB NOWPlumbingSigned-offA & E Plumbing11/08/2023
DOB NOWBoiler EquipmentSigned-offDual Fuel Plumbing & Heating01/25/2023
DOB NOWBoiler EquipmentSigned-offDual Fuel Plumbing & Heating02/22/2022
DOB NOWMechanical SystemsSigned-offDual Fuel Company11/17/2021
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems11/15/2021
DOB NOWPlumbingSigned-offDual Fuel Plumbing & Heating10/25/2021
DOB NOWMechanical SystemsSigned-offDual Fuel Company08/13/2021
BISOTISSUEDMonadnock Construction11/07/2023
BISOTISSUEDMonadnock Construction11/17/2022
BISOTISSUEDPyramid Etc Companies06/29/2022
BISOTISSUEDPyramid Etc Companies01/03/2022
BISOTISSUEDMonadnock Construction12/23/2021
BISPLISSUEDDual Fuel Plumbing & Heating03/27/2006
4 projects · most recent 02/04/2023
Boiler Controls General Wiring
FiledStatusContractorScope
02/04/2023CompleteItkin ElectricBoiler Controls
01/21/2022Permit IssuedTriboro Electrical Contracting Co—
07/31/2020Permit IssuedH.I. Kaye ElectricalGeneral Wiring
07/26/2019Permit IssuedH.I. Kaye Electrical—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
03/14/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/07/2025No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
01/13/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
11/20/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/31/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/18/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/29/2023Pass-Final Boiler Equipment InspectionPassView ↗
01/25/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/28/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 66
DateRequirementInspectorRole
01/08/2025Maintenance informationMehmet Gunalenergy_progress
01/08/2025Fire-Resistant Penetrations and JointsMehmet Gunalspecial
01/08/2025Energy Code Compliance InspectionsMehmet Gunalprogress
01/08/2025HVAC-R and service water heating equipmentMehmet Gunalenergy_progress
01/08/2025HVAC-R and service water heating system controlsMehmet Gunalenergy_progress
01/08/2025HVAC-R and service water piping design and insulationMehmet Gunalenergy_progress
01/06/2025Fire-Resistant Penetrations and JointsMehmet Gunalspecial
01/06/2025HVAC-R and service water piping design and insulationMehmet Gunalenergy_progress
01/06/2025HVAC-R and service water heating system controlsMehmet Gunalenergy_progress
01/06/2025Maintenance informationMehmet Gunalenergy_progress
01/06/2025HVAC-R and service water heating equipmentMehmet Gunalenergy_progress
01/06/2025Energy Code Compliance InspectionsMehmet Gunalprogress
09/18/2024Energy Code Compliance InspectionsMehmet Gunalprogress
09/18/2024Fire-Resistant Penetrations and JointsMehmet Gunalspecial
09/18/2024HVAC-R and service water heating system controlsMehmet Gunalenergy_progress
09/18/2024Maintenance informationMehmet Gunalenergy_progress
09/18/2024HVAC-R and service water piping design and insulationMehmet Gunalenergy_progress
09/18/2024HVAC-R and service water heating equipmentMehmet Gunalenergy_progress
01/24/2024Energy Code Compliance InspectionsMehmet Gunalprogress
01/24/2024Maintenance informationMehmet Gunalenergy_progress
01/24/2024HVAC-R and service water heating system controlsMehmet Gunalenergy_progress
01/24/2024HVAC-R and service water piping design and insulationMehmet Gunalenergy_progress
01/24/2024HVAC-R and service water heating equipmentMehmet Gunalenergy_progress
01/24/2024Fire-Resistant Penetrations and JointsMehmet Gunalspecial
04/02/2023HVAC and service water heating system controlsMehmet Gunalenergy_progress
Latest 25 of 66.
181 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account