← Back
Elevator apt, semi-fireproof with stores
Saint Nicholas (NYCHA)
2406 8 AVENUE · BIN 1081508
💬 Discuss this project
1953Year Built
14Stories
D7Building Class
R7-2Zoning
809,377 sfGross Floor Area
878Units
LL97 Covered16 Open Violations 11 unresolved · 5 paperwork only ▸FISP: No Report Filed
Elevator apt, semi-fireproof with stores · Owner of record: NYC HOUSING AUTHORITY · 332,987 sf lot · 2.43 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Roof4p · 1 filing · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 112p · 2 filings · 20 docs
CellarUnder Construction78p · 5 filings · 20 docs
Sub-CellarUnder Construction1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA4809/15/2026
N Y C HOUSING AUTHORITY803/22/2026
NEW YORK CITY HOUSING AUTHORITY1803/22/2026
NYCHA 99103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.1003/21/2026
HOWARD I SHAPIRO ASSOCIATES203/21/2026
JOEL PHAGOO P.E. PLLC403/21/2026
LGML GROUP103/21/2026
SHENOY ENGINEERING, P.C.203/21/2026
JOEL PHAGOO P E403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
METROPOLITAN CONSTRUCTION CORP.General Contractor903/21/2026
WDF INCGeneral Contractor408/06/2026
SKYWORX CONTRACTING INCGeneral Contractor307/08/2026
WHEELER, RElectrical103/21/2026
JONATHAN LANDAUElectrical103/21/2026
TALICO CONTRACTING INCGeneral Contractor107/08/2026
WDF INCFire Protection107/08/2026
ROBERT KOENIGElectrical103/21/2026
THOMPSON, NElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC ENGINEERING49831005/13/2026
BAZINI ENGINEERING, P.C.1808110/06/2025
Building Lifecycle
All (118)Filed (29)Permit Issued (13)Signed Off (5)Facade (FISP) (10)Violation (22)Inspection (1)Objection (8)Special Inspection (30)
09/04/2026
Filed — Alteration
Provide water supply connection to temporary boiler feed unit, including water meter and secondary backflow preventer on the make-up water line.
M01453305-S2
09/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
09/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/01/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/01/2026
Special inspection requirement — Post-installed Anchors
08/05/2026
Permit issued — Structural
M01271842-I1-ST
08/04/2026
Signed off — Alteration
M01263857-I1
08/04/2026
Objection resolved — Resolved
06/24/2026
Permit issued — Construction Fence
M01418865-I1-FN
06/18/2026
Filed — Alteration
Proposed: installation of temporary chain link fence. No change of use, egress or occupancy.
M01418865-I1
06/01/2026
Objection raised — Other
05/29/2026
Filed — Alteration
INTERIOR AND EXTERIOR RENOVATION OF EXISTING MULTIFAMILY BUILDING, INCLUDING RENOVATION OF INTERIOR UNITS AND CORRIDORS, AND FILLING IN FLOOR AT PORTION OF DOUBLE HEIGHT BOILER ROOM TO CREATE NEW LAUNDRY ROOM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01110791-Z3
05/29/2026
Filed — Alteration
INTERIOR AND EXTERIOR RENOVATION OF EXISTING MULTIFAMILY BUILDING, INCLUDING RENOVATION OF INTERIOR UNITS AND CORRIDORS, AND FILLING IN FLOOR AT PORTION OF DOUBLE HEIGHT BOILER ROOM TO CREATE NEW LAUNDRY ROOM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01110791-Z4
05/20/2026
Permit issued — Structural
M01398373-I1-ST
05/15/2026
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
05/15/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEXIS SCHLESSINGERMAN
05/15/2026
Special inspection requirement — Concrete - Cast-In-Place
ALEXIS SCHLESSINGERMAN
05/15/2026
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
05/15/2026
Special inspection requirement — Post-installed Anchors
ALEXIS SCHLESSINGERMAN
05/14/2026
Permit issued — Boiler Equipment
M01263857-I1-BE
05/13/2026
Filed — Alteration
EMERGENCY CONCRETE REPAIRS TO THE INTERIOR OF AN EXISTING BUILDING IN THE CELLAR, PIPE ACCESS SPACE, COAL BUNKER, PUMP ROOM AND BOILER ROOM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01271842-P2
05/12/2026
Permit issued — Sprinklers
M01350195-S3-EW-SP
05/12/2026
Permit issued — Mechanical Systems
M01350195-S2-MS
05/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/12/2026
Special inspection requirement — Post-installed Anchors
ALEXIS SCHLESSINGERMAN
05/12/2026
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
05/12/2026
Special inspection requirement — Concrete - Cast-In-Place
ALEXIS SCHLESSINGERMAN
05/12/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEXIS SCHLESSINGERMAN
05/08/2026
Filed — Alteration
BLDG#1: Installation of concrete jacket at column 159 at sub cellar and associated shoring as per plans filed herewith.
M01398373-I1
05/07/2026
Special inspection requirement — Post-installed Anchors
ALEXIS SCHLESSINGERMAN
05/07/2026
Special inspection requirement — Fire-Resistance Rated Construction
ALEXIS SCHLESSINGERMAN
05/07/2026
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
05/07/2026
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
05/07/2026
Special inspection requirement — Masonry
ALEXIS SCHLESSINGERMAN
05/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
05/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
05/06/2026
Special inspection requirement — Final
James Scheld
05/06/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEXIS SCHLESSINGERMAN
05/04/2026
Special inspection requirement — Sprinkler Systems
ALEXIS SCHLESSINGERMAN
05/04/2026
Special inspection requirement — Post-installed Anchors
ALEXIS SCHLESSINGERMAN
05/04/2026
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
05/04/2026
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
05/04/2026
Special inspection requirement — Post-installed Anchors
ALEXIS SCHLESSINGERMAN
05/04/2026
Special inspection requirement — Mechanical Systems
ALEXIS SCHLESSINGERMAN
05/04/2026
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
05/01/2026
Filed — Alteration
Remove and rebuilt interior masonry walls in cellar, Remove and rebuilt partition walls and floor tiles in existing first floor apartments A1, A2. no change in use, egress or occupancy.
M01350195-P3
04/22/2026
Filed — Alteration
Remove and rebuilt interior masonry walls in cellar, Remove and rebuilt partition walls and floor tiles in existing first floor apartments A1, A2. no change in use, egress or occupancy.
M01350195-P2
04/22/2026
Filed — Alteration
Remove and rebuilt interior masonry walls in cellar, Remove and rebuilt partition walls and floor tiles in existing first floor apartments A1, A2. no change in use, egress or occupancy.
M01350195-P1
04/06/2026
Objection raised — Other
03/27/2026
Filed — Alteration
INTERIOR AND EXTERIOR RENOVATION OF EXISTING MULTIFAMILY BUILDING, INCLUDING RENOVATION OF INTERIOR UNITS AND CORRIDORS, AND FILLING IN FLOOR AT PORTION OF DOUBLE HEIGHT BOILER ROOM TO CREATE NEW LAUNDRY ROOM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01110791-S8
03/27/2026
Filed — Alteration
INTERIOR AND EXTERIOR RENOVATION OF EXISTING MULTIFAMILY BUILDING, INCLUDING RENOVATION OF INTERIOR UNITS AND CORRIDORS, AND FILLING IN FLOOR AT PORTION OF DOUBLE HEIGHT BOILER ROOM TO CREATE NEW LAUNDRY ROOM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01110791-S9
03/27/2026
Filed — Alteration
INTERIOR AND EXTERIOR RENOVATION OF EXISTING MULTIFAMILY BUILDING, INCLUDING RENOVATION OF INTERIOR UNITS AND CORRIDORS, AND FILLING IN FLOOR AT PORTION OF DOUBLE HEIGHT BOILER ROOM TO CREATE NEW LAUNDRY ROOM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01110791-Z2
03/27/2026
Filed — Alteration
INTERIOR AND EXTERIOR RENOVATION OF EXISTING MULTIFAMILY BUILDING, INCLUDING RENOVATION OF INTERIOR UNITS AND CORRIDORS, AND FILLING IN FLOOR AT PORTION OF DOUBLE HEIGHT BOILER ROOM TO CREATE NEW LAUNDRY ROOM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01110791-S2
03/27/2026
Filed — Alteration
INTERIOR AND EXTERIOR RENOVATION OF EXISTING MULTIFAMILY BUILDING, INCLUDING RENOVATION OF INTERIOR UNITS AND CORRIDORS, AND FILLING IN FLOOR AT PORTION OF DOUBLE HEIGHT BOILER ROOM TO CREATE NEW LAUNDRY ROOM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01110791-Z1
03/24/2026
Objection raised — Energy
03/03/2026
Objection resolved — Addressed
03/01/2026
Objection raised — Admin
02/24/2026
Filed — Alteration
BUILDING #1: INSTALLATION OF TEMPORARY SHORING FOR COLUMN REPAIRS AS PER PLANS.
M01360451-I1
02/20/2026
Filed — Alteration
Remove and rebuilt interior masonry walls in cellar, Remove and rebuilt partition walls and floor tiles in existing first floor apartments A1, A2. no change in use, egress or occupancy.
M01350195-I1
02/20/2026
Filed — Alteration
Remove and rebuilt interior masonry walls in cellar, Remove and rebuilt partition walls and floor tiles in existing first floor apartments A1, A2. no change in use, egress or occupancy.
M01350195-S2
Latest 60 of 118 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedWDF INC08/05/2026
DOB NOWConstruction FencePermit IssuedWDF INC06/24/2026
DOB NOWStructuralPermit IssuedWDF INC05/20/2026
DOB NOWBoiler EquipmentSigned-offSTUART N SCHWARTZ05/14/2026
DOB NOWSprinklersPermit IssuedWDF INC05/12/2026
DOB NOWMechanical SystemsPermit IssuedWDF INC05/12/2026
DOB NOWBoiler EquipmentSigned-offSTUART N SCHWARTZ10/16/2025
DOB NOWConstruction FenceSigned-offMETROPOLITAN CONSTRUCTION09/05/2018
DOB NOWSidewalk ShedSigned-offSKYWORX CONTRACTING INC07/31/2018
DOB NOWSupported ScaffoldSigned-offMETROPOLITAN CONSTRUCTION06/13/2018
DOB NOWSidewalk ShedSigned-offSKYWORX CONTRACTING INC05/10/2018
DOB NOWConstruction FenceSigned-offMETROPOLITAN CONSTRUCTION03/27/2018
DOB NOWSidewalk ShedSigned-offTALICO CONTRACTING INC03/27/2018
BISOTISSUEDMETROPOLITAN CONSTRUCTION CORP.07/03/2020
BISOTISSUEDMETROPOLITAN CONSTRUCTION CORP.05/11/2019
BISOTISSUEDMETROPOLITAN CONSTRUCTION CORP.06/25/2018
BISEQISSUEDZORIA HOUSING, LLC09/02/2014
BISOTISSUEDZORIA HOUSING, LLC08/21/2014
BISEQISSUEDVIKRANT CONTRACTING & BUILDER08/11/2014
BISEQISSUEDZORIA HOUSING, LLC08/02/2014
BISCCISSUEDD&B COUSINS CONSTRUCTION06/25/2013
BISEQISSUEDTISHMAN CONSTRUCTION CORP09/28/2012
BISPLISSUEDPHASE 1 GROUP INC04/25/2012
BISOTISSUEDTISHMAN CONSTRUCTION CORP04/13/2012
BISEQISSUEDTISHMAN CONSTRUCTION CORP03/08/2012
BIS—ISSUEDNYCHA11/21/2011
BISPLISSUEDDUAL FUEL PLUBING & HTING04/24/2007
BISOTISSUEDNAP CONSTRUCTION01/03/2001
BISPLISSUEDCAPE PLUMBING INC01/02/2001
BISPLISSUEDOLYMPIA MECHANICAL10/22/1999
BISPLISSUEDBYPASS MECHANICAL CORP05/03/1995
BISBLISSUEDR MARC PIPING INC05/02/1995
BISOTRE-ISSUEDR.MARIFC PIPING INC05/01/1995
1 project · most recent 05/29/2026
Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/29/2026——Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Heat / Cool
Ephoca AWP10N3H2 10,860 BTU · Heat Pump Outdoor ×436
AWP10R3H2 8,400 BTU · Heat Pump Outdoor ×9
Heating
Lg ARUM456BTE5 487,000 BTU · Vrf Outdoor ×2
ARUM504BTE5 506,000 BTU · Vrf Outdoor ×1
Ephoca FLOOR MOUNTED 7,500 BTU · Heat Pump Outdoor ×2
Ventilation
Lunos E260SHORT 35 CFM · Erv ×28
E260 20 CFM · Erv ×2
2 projects · most recent 05/29/2026
Sprinkler System
FiledStatusContractorScope
05/29/2026——19 heads
05/01/2026Permit IssuedWDF INCSprinkler System
2 projects · most recent 09/04/2026
Water/Sanitary Gas Plumbing-Sprinkler Storm
FiledStatusContractorScope
09/04/2026——Water/Sanitary
05/29/2026——Gas, Plumbing-Sprinkler, Storm, Water/Sanitary
13 projects · most recent 05/15/2026
General Wiring
FiledStatusContractorScope
05/15/2026Permit IssuedRNH ELECTRIC COMPANY INC—
05/12/2026CompleteGALAXY ELECTRIC CORP—
04/28/2026CompleteCAPUTEK ELEC'L SERVICES,—
02/17/2026Permit IssuedPOLARIS ELEC'L CONST CORPGeneral Wiring
01/28/2026Permit IssuedGILSTON ELEC'L CONTNG LLCGeneral Wiring
09/12/2025Permit IssuedS. J. ELECTRIC INC.General Wiring
05/25/2023CompleteTRI-STATE ELECL & MECHL IGeneral Wiring
11/10/2020CompleteWEBSITE ELECTRIC CORP.—
07/29/2020Permit IssuedN.Y.C. HOUSING AUTHORITYGeneral Wiring
08/21/2019Permit IssuedEIA ELECTRIC, INCGeneral Wiring
05/14/2018CompleteLINTECH ELECTRIC, INC.—
05/08/2018CompleteLINTECH ELECTRIC, INC.—
03/21/2018CompleteQ.Y. ELECTRIC, INC—
4 projects · most recent 05/29/2026
Masonry Concrete
FiledStatusContractorScope
05/29/2026——Masonry
05/13/2026Permit IssuedWDF INCConcrete
05/08/2026Permit IssuedWDF INC1 scope_items
02/24/2026——1 scope_items
1 project · most recent 06/18/2026
Fence
FiledStatusContractorScope
06/18/2026Permit IssuedWDF INCFence
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
03/10/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 103
DateRequirementInspectorRole
09/04/2026HVAC-R and service water piping design and insulation—energy_progress
09/01/2026Post-installed Anchors—special
09/01/2026Fire-Resistant Penetrations and Joints—special
09/01/2026Tenant Protection Plan Compliance—special
05/15/2026Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
05/15/2026Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
05/15/2026Concrete - Cast-In-PlaceALEXIS SCHLESSINGERMANspecial
05/15/2026FinalALEXIS SCHLESSINGERMANprogress
05/15/2026Structural Stability – Alterations of existing buildingsALEXIS SCHLESSINGERMANspecial
05/12/2026FinalALEXIS SCHLESSINGERMANprogress
05/12/2026Structural Stability – Alterations of existing buildingsALEXIS SCHLESSINGERMANspecial
05/12/2026Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
05/12/2026Concrete - Cast-In-PlaceALEXIS SCHLESSINGERMANspecial
05/12/2026Tenant Protection Plan Compliance—special
05/07/2026Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
05/07/2026Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
05/07/2026MasonryALEXIS SCHLESSINGERMANspecial
05/07/2026Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
05/07/2026FinalALEXIS SCHLESSINGERMANprogress
05/07/2026Fire-Resistance Rated ConstructionALEXIS SCHLESSINGERMANprogress
05/06/2026FinalJames Scheldprogress
05/06/2026Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
05/06/2026Structural Stability – Alterations of existing buildingsALEXIS SCHLESSINGERMANspecial
05/04/2026Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
05/04/2026Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
Latest 25 of 103.
▾Documents — 319 on file (BIS + DOB NOW)
▸Plans & Drawings32
▸DOB NOWPlans/Sketch32
09/15/2026M01453305-I1Request digital key ↗
09/15/2026M01453305-S1Request digital key ↗
09/15/2026M01453305-S2Request digital key ↗
Showing 3 of 32 on file for this type
▸Applications & Permits38
▸BISPLAN / WORK APPROVAL APPLICATION23
04/04/2023120900356Open ↗
11/29/2022141007103Open ↗
11/29/2022123823844Open ↗
Showing 3 of 23 on file for this type
▸BISWORK PERMIT APPLICATION11
06/25/2018140557449Open ↗
08/29/2014140247588Open ↗
08/21/2014140191655Open ↗
Showing 3 of 11 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
07/02/2013120793061Open ↗
06/25/2013120793061Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
01/23/2012120900356Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
03/17/2023100954433Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026M01110791-I1Open ↗
▸Seals & Professional Certifications91
▸DOB NOWDPL-1: Design Professional Seal & Signature33
09/15/2026M01453305-S2Open ↗
09/15/2026M01453305-I1Open ↗
09/15/2026M01453305-S1Open ↗
Showing 3 of 33 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION16
07/01/2019123823844Open ↗
06/28/2016140191655Open ↗
01/07/2016140235109Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/01/2026M01350195-S2Open ↗
09/01/2026M01350195-S2Open ↗
08/31/2026M01350195-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/02/2026M00052204-I1Open ↗
09/01/2026M01350195-S2Open ↗
08/31/2026M01350195-P1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
03/07/2022141007103Open ↗
08/29/2014140247588Open ↗
08/08/2014140237875Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
08/29/2014140247588Open ↗
08/08/2014140237875Open ↗
08/01/2014140235109Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
08/29/2014140247588Open ↗
08/08/2014140237875Open ↗
08/01/2014140235109Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
03/07/2022141007103Open ↗
10/04/2016140557449Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
03/12/2012121003225Open ↗
07/28/2010120425085Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
03/12/2012121003225Open ↗
07/28/2010120425085Open ↗
▸Trade Schedules & Equipment4
▸BISSELF-CERT PLUMBING NOTICE2
12/13/2012120793070Open ↗
11/30/2012120793070Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/01/2019123823844Open ↗
▸BISSCHEDULE B - PLUMBING1
09/06/2011120793070Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes2
07/01/2019123823844Open ↗
09/12/2017140557449Open ↗
▸BISSTREET TREE CHECKLIST1
03/07/2022141007103Open ↗
▸Environmental & Asbestos21
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/21/2026M01271842-P2Open ↗
08/21/2026M01271842-I1Open ↗
08/21/2026M01263857-I1Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
06/28/2016140191655Open ↗
06/13/2014140191655Open ↗
▸BISASBESTOS-CERTIFICATION (DEP ACP5)2
09/06/2011120793061Open ↗
08/01/2014140235109Open ↗
▸BISDEP ASBESTOS PROJECT CONDITIONAL COMPLETION FORM1
06/25/2018140557449Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
01/12/2012120793070Open ↗
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU6213MN181
08/05/2020140557449Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
07/28/2010120425085Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/17/2026M01350195-I1Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
08/05/2020140557449Open ↗
04/14/2020140557449Open ↗
03/29/2018140557449Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
08/02/2019123823844Open ↗
06/28/2016140191655Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/13/2014140191655Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/05/2020140557449Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
08/08/2014140237875Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY8
03/22/2018140557449Open ↗
02/20/2018140557449Open ↗
09/12/2017140557449Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
10/04/2013120793070Open ↗
04/18/2012120793070Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
04/09/2012120793070Open ↗
▸Approvals, Objections & Sign-offs61
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter33
09/15/2026M01453305-I1Open ↗
09/15/2026M01453305-S1Open ↗
09/15/2026M01453305-S2Open ↗
Showing 3 of 33 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
03/24/2023121003225Open ↗
08/05/2020140557449Open ↗
06/28/2016140191655Open ↗
Showing 3 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
06/28/2016140191655Open ↗
01/07/2016140235109Open ↗
01/07/2016140247588Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)6
09/15/2026M01453305-S2Open ↗
09/15/2026M01453305-S1Open ↗
08/17/2026M01350195-P1Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
03/12/2012121003225Open ↗
11/28/2011120900356Open ↗
09/06/2011120793061Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
11/28/2011120900356Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT10
08/05/2020140557449Open ↗
07/02/2019123776770Open ↗
07/01/2019123823844Open ↗
Showing 3 of 10 on file for this type
▸Filing & Intake Forms22
▸BISEFILING COVER SHEET10
07/02/2019123776770Open ↗
07/02/2019123776770Open ↗
07/02/2019123776770Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION6
06/25/2018140557449Open ↗
03/22/2018140557449Open ↗
09/12/2017140557449Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
03/07/2022141007103Open ↗
10/04/2016140557449Open ↗
08/29/2014140247588Open ↗
Showing 3 of 6 on file for this type
▸Other Documents13
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
07/01/2019123823844Open ↗
04/09/2012120793070Open ↗
04/09/2012120793070Open ↗
Showing 3 of 5 on file for this type
▸BISPLOT DIAGRAM2
01/06/2015120900356Open ↗
10/31/2013120900356Open ↗
▸BISSupporting Document: Fee Exempt1
12/10/2015140235109Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
08/05/2020140557449Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll1
08/13/2026M01350195-S1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026M01110791-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026M01110791-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026M01110791-I1Open ↗