Old law tenement
2407 ADAM C POWELL BLVD
MANHATTAN · BIN 1060082
💬 Discuss this project
1910Year Built
5Stories
C4Building Class
R7-2Zoning
10,470 sfGross Floor Area
10Units
Rent Stabilized23 Open Violations ▸
Old law tenement · Owner of record: NYC HOUSING AUTHORITY · 2,733 sf lot · 3.83 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction41p · 1 filing · 20 docs
Floor 5Under Construction38p · 1 filing · 20 docs
Floor 4Under Construction35p · 1 filing · 20 docs
Floor 3Under Construction39p · 1 filing · 20 docs
Floor 2Under Construction35p · 1 filing · 20 docs
Floor 1Under Construction37p · 1 filing · 20 docs
CellarUnder Construction42p · 1 filing · 20 docs
1 job · most recent 08/05/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/05/2026Signed-offMONADNOCK GEN'L CONT INCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PUY-AH24NL 24,500 BTU · Condensing Unit ×1
1 job · most recent 08/05/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/05/2026Permit IssuedBELL CONST SERV INCGas, Storm, Water/Sanitary
2 jobs · most recent 01/06/2025
General Wiring
FiledStatusContractorScope
01/06/2025Permit IssuedGOTHAM TECHNICAL SERVICESGeneral Wiring
10/02/2024CompleteTOP SHELF ELECTRIC CORP—
1 job · most recent 10/02/2024
Sidewalk Shed
FiledStatusContractorScope
10/02/2024Signed-offSPRING SCAFFOLDING LLCSidewalk Shed
1 job · most recent 11/17/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
11/17/2025Permit IssuedPREMIER CONSTRUCTION INCSuspended Scaffold (SC)
Building Lifecycle
All (96)Filed (14)Permit Issued (16)Signed Off (3)Violation (21)Inspection (10)Objection (2)Special Inspection (30)
09/03/2026
Special inspection requirement — Maintenance information
Christopher Drutjons
09/03/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Drutjons
09/03/2026
Special inspection requirement — Heating Systems
Christopher Drutjons
09/03/2026
Special inspection requirement — Shutoff dampers
Christopher Drutjons
09/03/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
09/03/2026
Special inspection requirement — Energy Code Compliance Inspections
Christopher Drutjons
09/03/2026
Special inspection requirement — Final
Christopher Drutjons
09/03/2026
Special inspection requirement — Mechanical Systems
Christopher Drutjons
09/03/2026
Special inspection requirement — Post-installed Anchors
Christopher Drutjons
09/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/03/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Drutjons
09/03/2026
Special inspection requirement — Permanent certificate
Christopher Drutjons
09/01/2026
Violation issued (HPD, open)
C
09/01/2026
Violation issued (HPD, open)
C
09/01/2026
Violation issued (HPD, open)
C
09/01/2026
Violation issued (HPD, open)
B
08/21/2026
Permit issued — General Construction
M00883180-I1-GC
08/05/2026
Filed — Alteration
INTERIOR RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: REPLACEMENT OF EXISTING KITCHEN AND BATHROOM FXITURES ON EXISTING ROUGH-IN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00883180-P4
07/27/2026
Permit issued — Mechanical Systems
M00883180-S4-MS
07/27/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
07/27/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/27/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Drutjons
07/27/2026
Special inspection requirement — Final
Christopher Drutjons
07/27/2026
Special inspection requirement — Permanent certificate
Christopher Drutjons
07/27/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Drutjons
07/27/2026
Special inspection requirement — Energy Code Compliance Inspections
Christopher Drutjons
07/27/2026
Special inspection requirement — Post-installed Anchors
Christopher Drutjons
07/27/2026
Special inspection requirement — Mechanical Systems
Christopher Drutjons
07/27/2026
Special inspection requirement — Heating Systems
Christopher Drutjons
07/27/2026
Special inspection requirement — Maintenance information
Christopher Drutjons
07/27/2026
Special inspection requirement — Shutoff dampers
Christopher Drutjons
07/21/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. THE SIDEWALK SHED IS AT THE WEST ELEVATION IN FRONT OF THE BUILDING AT ADAM CLAYTON POWELL JR BLVD.
M01119227-I1
07/09/2026
Inspection — Pass-Final Construction Permit Withdrawal
Pass
View inspection ↗
06/26/2026
Permit issued — General Construction
M00883180-I1-GC
06/22/2026
Permit issued — General Construction
M00883180-S2-GC
06/01/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
06/01/2026
Special inspection requirement — Post-installed Anchors
Christopher Drutjons
06/01/2026
Special inspection requirement — Maintenance information
Christopher Drutjons
06/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
06/01/2026
Special inspection requirement — Tenant Protection Plan Compliance
Christopher Drutjons
06/01/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Drutjons
05/28/2026
Permit issued — Sidewalk Shed
M01119227-I1-SH
05/26/2026
Filed — Alteration
INTERIOR RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: REPLACEMENT OF EXISTING KITCHEN AND BATHROOM FXITURES ON EXISTING ROUGH-IN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00883180-P3
05/18/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/12/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/11/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/07/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/07/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/05/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
04/29/2026
Violation issued (HPD, closed)
A
04/24/2026
Filed — Alteration
INTERIOR RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: REPLACEMENT OF EXISTING KITCHEN AND BATHROOM FXITURES ON EXISTING ROUGH-IN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00883180-P2
04/15/2026
Permit issued — Plumbing
M00883180-S5-PL
03/31/2026
Signed off — Alteration
INTERIOR RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: REPLACEMENT OF EXISTING KITCHEN AND BATHROOM FXITURES ON EXISTING ROUGH-IN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00883180-S6
03/31/2026
Signed off — Alteration
INTERIOR RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: REPLACEMENT OF EXISTING KITCHEN AND BATHROOM FXITURES ON EXISTING ROUGH-IN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00883180-S7
03/02/2026
Permit issued — Sidewalk Shed
M01119227-I1-SH
01/21/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
12/01/2025
Permit issued — Suspended Scaffold
M01319839-I1-SC
11/23/2025
Objection resolved — Addressed
11/21/2025
Objection raised — Admin
11/17/2025
Filed — Alteration
INSTALL HOIST IN ORDER TO PERFORM EXTERIOR FACADE REPAIRS. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION.
M01319839-I1
Latest 60 of 96 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK CITY HOUSING AUTHORITY2108/22/2026
SAM CITY COLLABORATIVE LLC703/22/2026
NYC HOUSING AUTHORITY103/22/2026
NEW YORK CITY HSNG AUTHY103/22/2026
HOUSING AUTH.103/22/2026
NYCHA103/21/2026
SAM CITY MASTER TENANT LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SLM ARCHITECTURE, P.C.1208/05/2026
WELLWORTH CONSULTING LLC110/02/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.1803/21/2026
UNITED SAFETY CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CEGF & G PLUMBING CORPPlumbing407/08/2026
SPRING SCAFFOLDING LLCGeneral Contractor407/08/2026
MONADNOCK GEN'L CONT INCGeneral Contractor308/22/2026
M&G PLUMBING AND HEATINGPlumbing207/08/2026
PREMIER CONSTRUCTION INCGeneral Contractor206/28/2026
BELL CONSTRUCTION SVCSGeneral Contractor107/28/2026
MARK REYESElectrical103/21/2026
JOSEPH SORTINOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MILROSE CONSULTANTS LLC20031308/05/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMONADNOCK GEN'L CONT INC08/21/2026
DOB NOWMechanical SystemsPermit IssuedBELL CONSTRUCTION SVCS07/27/2026
DOB NOWGeneral ConstructionSigned-offMONADNOCK GEN'L CONT INC06/26/2026
DOB NOWGeneral ConstructionSigned-offPREMIER CONSTRUCTION INC06/22/2026
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC05/28/2026
DOB NOWPlumbingPermit IssuedCEGF & G PLUMBING CORP04/15/2026
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC03/02/2026
DOB NOWSuspended ScaffoldPermit IssuedPREMIER CONSTRUCTION INC12/01/2025
DOB NOWPlumbingPermit IssuedM&G PLUMBING AND HEATING10/31/2025
DOB NOWGeneral ConstructionSigned-offPREMIER CONSTRUCTION INC06/18/2025
DOB NOWPlumbingPermit IssuedBELL CONST SERV INC03/17/2025
DOB NOWBoiler EquipmentSigned-offBELL CONST SERV INC02/19/2025
DOB NOWBoiler EquipmentSigned-offBELL CONST SERV INC02/19/2025
DOB NOWGeneral ConstructionSigned-offMONADNOCK GEN'L CONT INC01/09/2025
DOB NOWPlumbingPermit IssuedM&G PLUMBING AND HEATING10/25/2024
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC10/03/2024
BISBLISSUEDCRESCENT CONTRACTING08/21/2002
BISPLISSUEDCRESCENT CONTRACTING08/21/2002
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
07/09/2026Pass-Final Construction Permit WithdrawalPassView ↗
05/18/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/12/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/11/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/07/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/07/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/05/2026Fail-Final CND-Occupancy InspectionFailView ↗
01/21/2026Pass-Final Boiler Equipment InspectionPassView ↗
11/06/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/16/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 84
DateRequirementInspectorRole
09/03/2026Maintenance informationChristopher Drutjonsenergy_progress
09/03/2026Shutoff dampersChristopher Drutjonsenergy_progress
09/03/2026HVAC-R and service water piping design and insulationChristopher Drutjonsenergy_progress
09/03/2026HVAC-R and service water heating system controlsChristopher Drutjonsenergy_progress
09/03/2026HVAC-R and service water heating equipmentChristopher Drutjonsenergy_progress
09/03/2026Energy Code Compliance InspectionsChristopher Drutjonsprogress
09/03/2026Mechanical SystemsChristopher Drutjonsspecial
09/03/2026Post-installed AnchorsChristopher Drutjonsspecial
09/03/2026FinalChristopher Drutjonsprogress
09/03/2026Tenant Protection Plan Compliance—special
09/03/2026Heating SystemsChristopher Drutjonsspecial
09/03/2026Permanent certificateChristopher Drutjonsenergy_progress
07/27/2026Shutoff dampersChristopher Drutjonsenergy_progress
07/27/2026Maintenance informationChristopher Drutjonsenergy_progress
07/27/2026HVAC-R and service water heating system controlsChristopher Drutjonsenergy_progress
07/27/2026FinalChristopher Drutjonsprogress
07/27/2026Heating SystemsChristopher Drutjonsspecial
07/27/2026Tenant Protection Plan Compliance—special
07/27/2026HVAC-R and service water piping design and insulationChristopher Drutjonsenergy_progress
07/27/2026HVAC-R and service water heating equipmentChristopher Drutjonsenergy_progress
07/27/2026Post-installed AnchorsChristopher Drutjonsspecial
07/27/2026Energy Code Compliance InspectionsChristopher Drutjonsprogress
07/27/2026Mechanical SystemsChristopher Drutjonsspecial
07/27/2026Permanent certificateChristopher Drutjonsenergy_progress
06/01/2026Post-installed AnchorsChristopher Drutjonsspecial
Latest 25 of 84.
▾Documents — 80 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/26/2026M01119227-I1Request digital key ↗
08/20/2026M01319839-I1Request digital key ↗
08/17/2026M00883180-P3Request digital key ↗
Showing 3 of 14 on file for this type
▸Seals & Professional Certifications40
▸DOB NOWProgress Inspector Seal & Signature14
09/23/2026M00883180-S4Open ↗
09/23/2026M00883180-S4Open ↗
08/29/2026M00883180-S2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/23/2026M00883180-S4Open ↗
08/29/2026M00883180-S2Open ↗
08/26/2026M00883180-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/26/2026M01119227-I1Open ↗
08/17/2026M00883180-P2Open ↗
08/17/2026M00883180-P1Open ↗
Showing 3 of 13 on file for this type
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/17/2026M00883180-P2Open ↗
08/17/2026M00883180-P1Open ↗
08/17/2026M00883180-S6Open ↗
Showing 3 of 12 on file for this type
▸Approvals, Objections & Sign-offs12
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter12
08/17/2026M00883180-P3Open ↗
08/17/2026M00883180-P2Open ↗
08/17/2026M00883180-S6Open ↗
Showing 3 of 12 on file for this type
▸Other Documents2
▸DOB NOWCalculations1
08/13/2026M01319839-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01319839-I1Open ↗