DOB04/29/2021FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
DOB08/02/2020FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
DOB05/02/2020FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
DOB05/03/2019FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
DOB01/26/2018VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
DOB01/03/2017VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
DOB06/10/2015VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST
DOB03/31/2014VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
DOB06/04/2009WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENT AND/OR APPROV- ED AMENDMENT. ALL WORK COMPLETED UNDER JOB #301982362. APPROVED PLANS INDICATE PARKING SPACES TO BE 10FT CONSTR CPMPLETED 9FT 2". PARKING SPACE CREATED IN FRONT OF EGRESS STAIRS. H/C SPACE NOT AS PER PLANS REMEDY: CONFORM TO APPROVED DOCUMENTS OR AMENDMENTS
ECB12/05/2024FAILURE TO SUBMIT THE REQUIRED PARKING STRUCTURE INITIAL OBSERVATION REPORT FOR AN EXISTING PARKING STRUCTURE OR A PERIODIC INSPECTION OF A PARKING STRUCTURE(PIPS) REPORT DOCUMENTING THE CONDITIONS OF PSID#B000Nothing owed — awaiting certificate of correction
ECB05/05/2008FAILURE TO CARRY CHIMNEY UP TO REQUIRED HEIGHT NOTE A NEW 6 STY BLDG HAS ERECTED IN BETWEEN 2 2 STY BLDGS EACH LESS THAN 10 FROM THE NEW BLDG THE CHIMNEYS OF BOTH EXISTING BLDGS ARE REQUIRED BY THE ADMIN CODENothing owed — awaiting certificate of correction