← Back
Old law tenement
2409 ADAM C POWELL BLVD
MANHATTAN · Harlem (North) · BIN 1060081
💬 Discuss this project
1910Year Built
5Stories
C4Building Class
R7-2Zoning
10,470 sfGross Floor Area
10Units
Rent Stabilized6 Open Violations ▸
Old law tenement · Owner of record: NYC HOUSING AUTHORITY · 2,733 sf lot · 3.83 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction57p · 1 filing · 20 docs
Floor 5Under Construction54p · 1 filing · 20 docs
Floor 4Under Construction52p · 1 filing · 20 docs
Floor 3Under Construction54p · 1 filing · 20 docs
Floor 2Under Construction52p · 1 filing · 20 docs
Floor 1Under Construction54p · 1 filing · 20 docs
CellarUnder Construction58p · 1 filing · 20 docs
Site & exteriorUnder Construction29p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK CITY HOUSING AUTHORITY2408/25/2026
NYC Housing Authority203/22/2026
SAM CITY MASTER TENANT LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EMTG CONSULTANTS INC908/05/2026
WELLWORTH CONSULTING LLC110/02/2024
GACE DPC203/25/2024
SLM ARCHITECTURE, P.C.103/21/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.2003/21/2026
UNITED SAFETY CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DUAL FUEL PLUBING & HTINGPlumbing707/08/2026
SPRING SCAFFOLDING LLCGeneral Contractor407/08/2026
DUAL FUEL COMPANY LLCGeneral Contractor407/08/2026
MONADNOCK GEN'L CONT INCGeneral Contractor308/25/2026
M&G PLUMBING AND HEATINGPlumbing207/08/2026
PREMIER CONSTRUCTION INCGeneral Contractor206/28/2026
BELL CONSTRUCTION SVCSGeneral Contractor107/08/2026
MARK REYESElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MILROSE CONSULTANTS LLC20031208/05/2026
Building Lifecycle
All (99)Filed (14)Permit Issued (20)Signed Off (3)Violation (20)Inspection (6)Objection (6)Special Inspection (30)
08/24/2026
Permit issued — General Construction
M00883173-I1-GC
08/21/2026
Violation issued (HPD, open)
A
08/21/2026
Violation issued (HPD, open)
A
08/21/2026
Violation issued (HPD, open)
A
08/21/2026
Violation issued (HPD, open)
A
08/21/2026
Violation issued (HPD, open)
A
08/21/2026
Violation issued (HPD, open)
A
08/05/2026
Filed — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INSTALLATION OF NEW SANITARY, STORM, DOMESTIC WATER, SANITARY VENT AND GAS PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00883173-P4
07/27/2026
Special inspection requirement — Permanent certificate
Christopher Drutjons
07/27/2026
Special inspection requirement — Heating Systems
Christopher Drutjons
07/27/2026
Special inspection requirement — Final
Christopher Drutjons
07/27/2026
Special inspection requirement — Post-installed Anchors
Christopher Drutjons
07/27/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Drutjons
07/27/2026
Special inspection requirement — Maintenance information
Christopher Drutjons
07/27/2026
Special inspection requirement — Mechanical Systems
Christopher Drutjons
07/27/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
07/27/2026
Special inspection requirement — Shutoff dampers
Christopher Drutjons
07/27/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Drutjons
07/27/2026
Special inspection requirement — Energy Code Compliance Inspections
Christopher Drutjons
07/27/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/21/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. THE SIDEWALK SHED IS AT THE WEST ELEVATION IN FRONT OF THE BUILDING ADAM CLAYTON POWELL JR BLVD ELEVATION.
M01119242-I1
06/22/2026
Permit issued — General Construction
M00883173-S2-GC
05/28/2026
Permit issued — Sidewalk Shed
M01119242-I1-SH
05/26/2026
Filed — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INSTALLATION OF NEW SANITARY, STORM, DOMESTIC WATER, SANITARY VENT AND GAS PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00883173-P3
05/13/2026
Permit issued — Mechanical Systems
M00883173-S4-MS
05/13/2026
Special inspection requirement — Post-installed Anchors
Christopher Drutjons
05/13/2026
Special inspection requirement — Maintenance information
Christopher Drutjons
05/13/2026
Special inspection requirement — Energy Code Compliance Inspections
Christopher Drutjons
05/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
05/13/2026
Special inspection requirement — Permanent certificate
Christopher Drutjons
05/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Drutjons
05/13/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Drutjons
05/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
04/29/2026
Violation issued (HPD, closed)
A
04/07/2026
Signed off — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INSTALLATION OF NEW SANITARY, STORM, DOMESTIC WATER, SANITARY VENT AND GAS PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00883173-S6
04/07/2026
Signed off — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INSTALLATION OF NEW SANITARY, STORM, DOMESTIC WATER, SANITARY VENT AND GAS PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00883173-S7
03/30/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/23/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/19/2026
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
03/02/2026
Permit issued — Sidewalk Shed
M01119242-I1-SH
01/16/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/05/2025
Permit issued — Mechanical Systems
M00883173-S4-MS
12/02/2025
Filed — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INSTALLATION OF NEW SANITARY, STORM, DOMESTIC WATER, SANITARY VENT AND GAS PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00883173-P2
11/26/2025
Permit issued — Suspended Scaffold
M01320230-I1-SC
11/23/2025
Objection resolved — Addressed
11/21/2025
Objection raised — Admin
11/18/2025
Special inspection requirement — Permanent certificate
Christopher Drutjons
11/18/2025
Special inspection requirement — Post-installed Anchors
Christopher Drutjons
11/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Drutjons
11/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
11/18/2025
Special inspection requirement — Maintenance information
Christopher Drutjons
11/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Drutjons
11/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
11/18/2025
Special inspection requirement — Energy Code Compliance Inspections
Christopher Drutjons
11/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
11/17/2025
Filed — Alteration
INSTALL HOIST IN ORDER TO PERFORM EXTERIOR FACADE REPAIRS. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION.
M01320230-I1
11/17/2025
Permit issued — Plumbing
M00883173-S5-PL
11/17/2025
Permit issued — Boiler Equipment
M00883173-S6-BE
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMONADNOCK GEN'L CONT INC08/24/2026
DOB NOWGeneral ConstructionSigned-offPREMIER CONSTRUCTION INC06/22/2026
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC05/28/2026
DOB NOWMechanical SystemsPermit IssuedBELL CONSTRUCTION SVCS05/13/2026
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC03/02/2026
DOB NOWMechanical SystemsPermit IssuedDUAL FUEL COMPANY LLC12/05/2025
DOB NOWSuspended ScaffoldPermit IssuedPREMIER CONSTRUCTION INC11/26/2025
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING11/17/2025
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLUBING & HTING11/17/2025
DOB NOWPlumbingPermit IssuedM&G PLUMBING AND HEATING10/31/2025
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC10/01/2025
DOB NOWGeneral ConstructionPermit IssuedMONADNOCK GEN'L CONT INC09/09/2025
DOB NOWGeneral ConstructionSigned-offPREMIER CONSTRUCTION INC06/20/2025
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLUBING & HTING04/01/2025
DOB NOWMechanical SystemsPermit IssuedDUAL FUEL COMPANY LLC12/17/2024
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLUBING & HTING11/26/2024
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING11/26/2024
DOB NOWPlumbingPermit IssuedM&G PLUMBING AND HEATING10/28/2024
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC10/03/2024
DOB NOWGeneral ConstructionPermit IssuedMONADNOCK GEN'L CONT INC10/02/2024
1 project · most recent 08/05/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/05/2026Permit IssuedMONADNOCK GEN'L CONT INCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PUY-AH24NL 24,500 BTU · Condensing Unit ×1
PUZ-HA24NHAI 24,000 BTU · Condensing Unit ×1
1 project · most recent 08/05/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/05/2026Signed-offDUAL FUEL PLUBING & HTINGGas, Storm, Water/Sanitary
4 projects · most recent 06/24/2026
Boiler Controls General Wiring
FiledStatusContractorScope
06/24/2026Permit IssuedZENA ELECTRIC INC—
12/12/2025CompleteSTX ELECTRICAL CORPBoiler Controls
01/06/2025Permit IssuedGOTHAM TECHNICAL SERVICESGeneral Wiring
10/02/2024CompleteTOP SHELF ELECTRIC CORP—
1 project · most recent 08/05/2026
Steel
FiledStatusContractorScope
08/05/2026Permit IssuedMONADNOCK GEN'L CONT INCSteel
1 project · most recent 10/02/2024
Sidewalk Shed
FiledStatusContractorScope
10/02/2024Signed-offSPRING SCAFFOLDING LLCSidewalk Shed
1 project · most recent 11/17/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
11/17/2025Permit IssuedPREMIER CONSTRUCTION INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/30/2026Pass-Final Boiler Equipment InspectionPassView ↗
03/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/19/2026No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
01/16/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/05/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/16/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 81
DateRequirementInspectorRole
07/27/2026Mechanical SystemsChristopher Drutjonsspecial
07/27/2026Heating SystemsChristopher Drutjonsspecial
07/27/2026Maintenance informationChristopher Drutjonsenergy_progress
07/27/2026HVAC-R and service water heating system controlsChristopher Drutjonsenergy_progress
07/27/2026HVAC-R and service water heating equipmentChristopher Drutjonsenergy_progress
07/27/2026Shutoff dampersChristopher Drutjonsenergy_progress
07/27/2026FinalChristopher Drutjonsprogress
07/27/2026Energy Code Compliance InspectionsChristopher Drutjonsprogress
07/27/2026Tenant Protection Plan Compliance—special
07/27/2026HVAC-R and service water piping design and insulationChristopher Drutjonsenergy_progress
07/27/2026Post-installed AnchorsChristopher Drutjonsspecial
07/27/2026Permanent certificateChristopher Drutjonsenergy_progress
05/13/2026Permanent certificateChristopher Drutjonsenergy_progress
05/13/2026Post-installed AnchorsChristopher Drutjonsspecial
05/13/2026HVAC-R and service water heating system controlsChristopher Drutjonsenergy_progress
05/13/2026HVAC-R and service water heating equipmentChristopher Drutjonsenergy_progress
05/13/2026Energy Code Compliance InspectionsChristopher Drutjonsprogress
05/13/2026Tenant Protection Plan Compliance—special
05/13/2026HVAC-R and service water piping design and insulationChristopher Drutjonsenergy_progress
05/13/2026Maintenance informationChristopher Drutjonsenergy_progress
05/13/2026Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
11/18/2025Tenant Protection Plan Compliance—special
11/18/2025Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
11/18/2025Permanent certificateChristopher Drutjonsenergy_progress
11/18/2025HVAC-R and service water heating system controlsChristopher Drutjonsenergy_progress
Latest 25 of 81.
▾Documents — 82 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/26/2026M00883173-P2Request digital key ↗
08/26/2026M00883173-P1Request digital key ↗
08/26/2026M00883173-S6Request digital key ↗
Showing 3 of 15 on file for this type
▸Seals & Professional Certifications39
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/26/2026M00883173-P2Open ↗
08/26/2026M00883173-P1Open ↗
08/26/2026M00883173-S7Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/23/2026M00883173-S6Open ↗
09/23/2026M00883173-S7Open ↗
09/01/2026M00883173-P4Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/23/2026M00883173-S6Open ↗
09/23/2026M00883173-S7Open ↗
09/06/2026M00883173-S3Open ↗
Showing 3 of 11 on file for this type
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/26/2026M00883173-P1Open ↗
08/26/2026M00883173-S7Open ↗
08/26/2026M00883173-S6Open ↗
Showing 3 of 13 on file for this type
▸Approvals, Objections & Sign-offs13
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter13
08/26/2026M00883173-P5Open ↗
08/26/2026M00883173-P4Open ↗
08/26/2026M00883173-P3Open ↗
Showing 3 of 13 on file for this type
▸Other Documents2
▸DOB NOWCalculations1
08/13/2026M01320230-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01320230-I1Open ↗