1950Year Built
2Stories
A1Building Class
R2AZoning
1,440 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,000 sf lot · 0.36 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR103/19/2025
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281103/19/2025
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
05/08/2025
Permit issued — Solar
Q01194798-I1-SL
03/19/2025
Filed — Alteration
Installation of solar panels, rooftop, railed, grid-tied, 16 modules, 6.56 KW
Q01194798-I1
03/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
03/13/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
03/13/2025
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
03/13/2025
Special inspection requirement — Final
Mina Makar
03/13/2025
Special inspection requirement — Air barrier - visual inspection
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR05/08/2025
1 job · most recent 03/14/2025
FiledStatusContractorScope
03/14/2025CompleteISLAND ELECTRIC CORP—
1 job · most recent 03/19/2025
FiledStatusContractorScope
03/19/2025Signed-offMOMENTUM SOLAR16 panels, 6.56 kw, 281 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
03/13/2025Fire-Resistant Penetrations and JointsMina Makarspecial
03/13/2025Structural Stability – Alterations of existing buildingsMina Makarspecial
03/13/2025Energy Code Compliance InspectionsMina Makarprogress
03/13/2025FinalMina Makarprogress
03/13/2025Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026Q01194798-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026Q01194798-I1Open ↗
08/23/2026Q01194798-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q01194798-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026Q01194798-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01194798-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01194798-I1Open ↗