Two stories - detached, small or mid-size
241-06 WELLER AVENUE
QUEENS · Rosedale · BIN 4288099
💬 Discuss this project
1930Year Built
2.5Stories
A1Building Class
R3AZoning
1,672 sfGross Floor Area
1Units
3 Active Violations ▸FDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: 241-06 Weller Ave · 4,000 sf lot · 0.42 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 1 filing · 20 docs
Floor 2Under Construction9p · 1 filing · 20 docs
Floor 1Under Construction9p · 1 filing · 20 docs
CellarUnder Construction11p · 1 filing · 20 docs
Site & exteriorUnder Construction13p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Prime Realty Services704/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/21/2023$465K—Private party → 241-06 WELLER AVE LLC$278/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bayside Associates411/24/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Yafe MeodGeneral Contractor104/09/2026
Yafe MeodScaffold104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SD Testing & Inspection S7010103/06/2024
Building Lifecycle
11/17/2026
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
Q01013099-I1-GC
07/09/2026
No en drawing approved from DOB provided on the job site at the time of inspection., maintain/display required documents; contact via email:…
ECB violation · open
03/12/2026
Project information panel/sidewalk shed parapet panel/construction sign not provided or not in compliance with section. Observed workers grading…
ECB violation · open
03/12/2026
Work does not conform to approved construction documents and/or approved amendments. Observed workers grading with soil inside new foundation walls…
ECB violation · open
01/06/2026
Permit issued — Construction Fence
Q01013099-S4-FN
51 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedYafe Meod01/06/2026
DOB NOWGeneral ConstructionPermit IssuedYafe Meod11/17/2025
1 project · most recent 11/24/2025
Sprinkler System
FiledStatusContractorScope
11/24/2025——Sprinkler System
1 project · most recent 11/24/2025
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
11/24/2025——Gas, Plumbing-Sprinkler, Water/Sanitary
1 project · most recent 11/24/2025
Concrete Masonry Wood
FiledStatusContractorScope
11/24/2025Permit IssuedYafe MeodConcrete, Masonry, Wood
1 project · most recent 11/24/2025
Fence
FiledStatusContractorScope
11/24/2025Permit IssuedYafe MeodFence
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
08/21/2025Subgrade InspectionsXIUCHENG LIspecial
08/21/2025Structural Stability – Alterations of existing buildingsXIUCHENG LIspecial
08/21/2025Concrete - Cast-In-PlaceXIUCHENG LIspecial
08/21/2025Chimneys and ventsXIUCHENG LIspecial
08/21/2025MasonryXIUCHENG LIspecial
08/21/2025Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
08/21/2025Wood – Seismic ResistanceXIUCHENG LIspecial
08/21/2025Energy Code Compliance InspectionsXIUCHENG LIprogress
08/21/2025Fire-Resistance Rated ConstructionXIUCHENG LIprogress
08/21/2025Insulation placement and R valuesXIUCHENG LIenergy_progress
08/21/2025Electric vehicle service equipment requirementsXIUCHENG LIenergy_progress
08/21/2025Fenestration areasXIUCHENG LIenergy_progress
08/21/2025Interior lighting powerXIUCHENG LIenergy_progress
08/21/2025Air barrier — testing XIUCHENG LIenergy_progress
08/21/2025Fenestration air leakageXIUCHENG LIenergy_progress
08/21/2025Air barrier - visual inspectionXIUCHENG LIenergy_progress
08/21/2025Maintenance informationXIUCHENG LIenergy_progress
08/21/2025MeteringXIUCHENG LIenergy_progress
08/21/2025Permanent certificateXIUCHENG LIenergy_progress
08/21/2025Fenestration and door U-factor and product ratingsXIUCHENG LIenergy_progress
11/25/2024Fire-Resistant Penetrations and Joints—special
11/25/2024High Temperature Hot Water Piping (Welding)—special
11/25/2024High-Pressure Fuel-Gas Piping (Welding)—special
11/25/2024Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical Components—special
11/25/2024Sprinkler Systems—special
Latest 25 of 30.
35 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account