← Back
Two stories - detached, small or mid-size
241-11 132 ROAD
QUEENS · Rosedale · BIN 4279549
💬 Discuss this project
1950Year Built
2Stories
A1Building Class
R2Zoning
1,120 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,000 sf lot · 0.28 FAR built · Flood zone X
Locations of Work
Electrical
Roof1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ETRECTE LLC108/21/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J B I CONSTRUCTION GROUP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J.B.I. CONSTRUCTION GROUPGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ETRECTE LLC8116108/21/2024
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
03/13/2025
Signed off — Alteration
Q01097617-I1
08/23/2024
Permit issued — Solar
Q01097617-I1-SL
08/21/2024
Filed — Alteration
Q01097617-I1
08/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
08/16/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
08/16/2024
Special inspection requirement — Energy Code Compliance Inspections
VYACHESLAV NECHAYEV
08/16/2024
Special inspection requirement — Final
VYACHESLAV NECHAYEV
08/16/2024
Special inspection requirement — Air barrier - visual inspection
VYACHESLAV NECHAYEV
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offJ.B.I. CONSTRUCTION GROUP08/23/2024
1 project · most recent 08/20/2024
FiledStatusContractorScope
08/20/2024CompleteJSP ELECTL CNTNG CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/16/2024Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
08/16/2024Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
08/16/2024Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
08/16/2024FinalVYACHESLAV NECHAYEVprogress
08/16/2024Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026Q01097617-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/30/2026Q01097617-I1Open ↗
08/30/2026Q01097617-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/21/2026Q01097617-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/30/2026Q01097617-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/21/2026Q01097617-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01097617-I1Open ↗