← Back
Cape Cod
241-20 83 AVENUE
QUEENS · BIN 4165813
💬 Discuss this project
1950Year Built
1.5Stories
A0Building Class
R2AZoning
984 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Cape Cod · Owner of record: 445 UNITED, LLC · 4,000 sf lot · 0.25 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
445 UNITED, LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/07/2025$710K—— → —$722/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MCHENERY TESTING LAB403/25/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AFCON CONSTRUCTION INCGeneral Contractor304/09/2026
PLUMB-IT MECHANICAL INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUTTERFIELD & O'CONNOR4189303/25/2026
Building Lifecycle
All (43)Filed (4)Permit Issued (5)Signed Off (3)Violation (2)Inspection (5)Objection (14)Special Inspection (10)
04/21/2026
Signed off — Alteration
HEREWITH FILING TO INSTALL BATHROOM VENT & 2 MINI-SPLIT AC UNITS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY
Q01216294-S2
04/20/2026
Signed off — Alteration
HEREWITH FILING TO INSTALL BATHROOM VENT & 2 MINI-SPLIT AC UNITS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY
Q01216294-I1
04/15/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/01/2026
Special inspection requirement — Mechanical Systems
BRIAN T. O'CONNOR
04/01/2026
Special inspection requirement — Final
TREVOR O. FLOWERS
04/01/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
TREVOR O. FLOWERS
04/01/2026
Special inspection requirement — HVAC-R and service water heating equipment
TREVOR O. FLOWERS
04/01/2026
Special inspection requirement — HVAC-R and service water heating system controls
TREVOR O. FLOWERS
03/26/2026
Signed off — Alteration
HEREWITH FILING TO INSTALL BATHROOM VENT & 2 MINI-SPLIT AC UNITS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY
Q01216294-S1
03/25/2026
Filed — Alteration
HEREWITH FILING TO INSTALL BATHROOM VENT & 2 MINI-SPLIT AC UNITS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY
Q01216294-P1
03/19/2026
Special inspection requirement — HVAC-R and service water heating equipment
TREVOR O. FLOWERS
03/19/2026
Special inspection requirement — HVAC-R and service water heating system controls
TREVOR O. FLOWERS
03/19/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
TREVOR O. FLOWERS
03/19/2026
Special inspection requirement — Mechanical Systems
BRIAN T. O'CONNOR
03/19/2026
Special inspection requirement — Final
TREVOR O. FLOWERS
03/09/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/08/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/03/2026
Permit issued — Plumbing
Q01216294-S1-PL
10/02/2025
Permit issued — Structural
Q01216294-I1-GC
10/02/2025
Permit issued — General Construction
Q01216294-I1-ST
10/02/2025
Permit issued — Plumbing
Q01216294-S1-PL
10/02/2025
Permit issued — Mechanical Systems
Q01216294-S2-MS
08/11/2025
Objection resolved — Addressed
08/11/2025
Objection resolved — Addressed
08/11/2025
Objection resolved — Addressed
08/11/2025
Objection resolved — Addressed
07/30/2025
Objection raised — Mechanical
07/30/2025
Objection raised — Other
07/30/2025
Objection raised — Other
07/30/2025
Objection raised — Cost
07/25/2025
Filed — Alteration
HEREWITH FILING TO INSTALL BATHROOM VENT & 2 MINI-SPLIT AC UNITS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY
Q01216294-S2
07/25/2025
Filed — Alteration
HEREWITH FILING TO INSTALL BATHROOM VENT & 2 MINI-SPLIT AC UNITS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY
Q01216294-S1
06/17/2025
Objection resolved — Addressed
06/13/2025
Objection raised — Admin
05/22/2025
Objection resolved — Addressed
05/22/2025
Objection resolved — Addressed
05/16/2025
Objection raised — Cost
05/16/2025
Objection raised — Admin
05/02/2025
Filed — Alteration
HEREWITH FILING TO INSTALL BATHROOM VENT & 2 MINI-SPLIT AC UNITS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY
Q01216294-I1
04/03/2025
Violation issued (ECB, closed)
Construction
03/01/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJVR PLBG AND HEATING INC02/03/2026
DOB NOWStructuralSigned-offAFCON CONSTRUCTION10/02/2025
DOB NOWGeneral ConstructionSigned-offAFCON CONSTRUCTION10/02/2025
DOB NOWPlumbingSigned-offJVR PLBG AND HEATING INC10/02/2025
DOB NOWMechanical SystemsSigned-offAFCON CONSTRUCTION10/02/2025
1 project · most recent 03/25/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/25/2026Signed-offAFCON CONSTRUCTION INCAir Conditioning Systems, Ventilation Systems
Cooling
Gree LIV09HP230V1R32AH 91,000 BTU · Fan Coil Indoor ×8
MUL18HP230V1E32AO 180,000 BTU · Condensing Unit ×4
Ventilation
Panasonic FV-0511VF1 110 CFM · Exhaust Fan ×2
1 project · most recent 08/27/2025
General Wiring
FiledStatusContractorScope
08/27/2025CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
04/15/2026Pass-Final General Construction Non-Directive 14PassView ↗
03/09/2026Fail-Final General Construction Non-Directive 14FailView ↗
03/08/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/06/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/06/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
04/01/2026Mechanical SystemsBRIAN T. O'CONNORspecial
04/01/2026FinalTREVOR O. FLOWERSprogress
04/01/2026HVAC-R and service water piping design and insulationTREVOR O. FLOWERSenergy_progress
04/01/2026HVAC-R and service water heating equipmentTREVOR O. FLOWERSenergy_progress
04/01/2026HVAC-R and service water heating system controlsTREVOR O. FLOWERSenergy_progress
03/19/2026HVAC-R and service water heating equipmentTREVOR O. FLOWERSenergy_progress
03/19/2026HVAC-R and service water heating system controlsTREVOR O. FLOWERSenergy_progress
03/19/2026HVAC-R and service water piping design and insulationTREVOR O. FLOWERSenergy_progress
03/19/2026Mechanical SystemsBRIAN T. O'CONNORspecial
03/19/2026FinalTREVOR O. FLOWERSprogress
▾Documents — 26 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/17/2026Q01216294-S1Request digital key ↗
08/17/2026Q01216294-I1Request digital key ↗
08/17/2026Q01216294-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01216294-I1Open ↗
▸Seals & Professional Certifications14
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026Q01216294-S2Open ↗
09/23/2026Q01216294-S2Open ↗
09/23/2026Q01216294-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/17/2026Q01216294-I1Open ↗
08/17/2026Q01216294-P1Open ↗
08/17/2026Q01216294-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026Q01216294-P1Open ↗
09/23/2026Q01216294-S2Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/17/2026Q01216294-I1Open ↗
08/17/2026Q01216294-P1Open ↗
08/17/2026Q01216294-S2Open ↗
Showing 3 of 4 on file for this type
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/13/2026Q01216294-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01216294-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026Q01216294-I1Open ↗