← Back
Two family converted from one family
241-33 142 AVENUE
QUEENS · Rosedale · BIN 4288229
💬 Discuss this project
1945Year Built
2Stories
B3Building Class
R3XZoning
2,165 sfGross Floor Area
2Units
Two family converted from one family · 4,000 sf lot · 0.54 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingGeneral
Floor 27p · 1 filing · 20 docs
Floor 17p · 1 filing · 20 docs
Cellar9p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
135-223 STREET1807/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/20/2024$1.5M—— → —$675/sf building
05/13/2024$600K—— → —$277/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC106/27/2025
SION CONSULTING ENGINEERING PC602/03/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SION CONSULTING ENGINEERING1203/21/2026
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
B36 SERVICES INCGeneral Contractor507/08/2026
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
ALL PRO PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272106/27/2025
SION CONSULTING ENG. PC1108502/03/2025
Building Lifecycle
All (89)Filed (7)Permit Issued (5)Signed Off (3)Inspection (8)Objection (36)Special Inspection (30)
10/01/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01246253-I1
07/11/2025
Permit issued — Solar
Q01246253-I1-SL
06/27/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01246253-I1
06/24/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
06/24/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
06/24/2025
Special inspection requirement — Final
Walid Abdulla
06/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
06/24/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
05/12/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/10/2025
Signed off — Alteration
Q01058311-I1
03/10/2025
Signed off — Alteration CO
THIS APPLICATION IS FILED TO CONVERT EXISTING 1 FAMILY INTO 2 FAMILY AND HORIZONTAL AND VERTICAL EXTENSION
Q01051612-S1
02/03/2025
Filed — Alteration CO
THIS APPLICATION IS FILED TO CONVERT EXISTING 1 FAMILY INTO 2 FAMILY AND HORIZONTAL AND VERTICAL EXTENSION
Q01051612-P3
02/03/2025
Special inspection requirement — Electric vehicle service equipment requirements
sion hourizadeh
02/03/2025
Special inspection requirement — Energy Code Compliance Inspections
sion hourizadeh
02/03/2025
Special inspection requirement — Air barrier - visual inspection
sion hourizadeh
02/03/2025
Special inspection requirement — Insulation placement and R values
sion hourizadeh
02/03/2025
Special inspection requirement — Duct leakage testing, insulation and design
sion hourizadeh
02/03/2025
Special inspection requirement — Mechanical Systems
sion hourizadeh
02/03/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
SOORJBALLY HARILALL
02/03/2025
Special inspection requirement — Footing and Foundation
sion hourizadeh
02/03/2025
Special inspection requirement — Permanent certificate
sion hourizadeh
02/03/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
sion hourizadeh
02/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
sion hourizadeh
02/03/2025
Special inspection requirement — Fenestration air leakage
sion hourizadeh
02/03/2025
Special inspection requirement — Metering
sion hourizadeh
02/03/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
sion hourizadeh
02/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
sion hourizadeh
02/03/2025
Special inspection requirement — Maintenance information
sion hourizadeh
02/03/2025
Special inspection requirement — Protection of exposed foundation insulation
sion hourizadeh
02/03/2025
Special inspection requirement — Interior lighting power
sion hourizadeh
02/03/2025
Special inspection requirement — Heating Systems
sion hourizadeh
02/03/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
sion hourizadeh
02/03/2025
Special inspection requirement — Subgrade Inspections
sion hourizadeh
02/03/2025
Special inspection requirement — Final
sion hourizadeh
02/03/2025
Special inspection requirement — Fire-Resistance Rated Construction
sion hourizadeh
02/03/2025
Special inspection requirement — Structural Wood Frame
sion hourizadeh
02/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
sion hourizadeh
01/28/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/13/2025
Permit issued — General Construction
Q01051612-I1-MS
12/30/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/26/2024
Permit issued — Structural
Q01051612-I1-GC-CX
12/23/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
12/23/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/23/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/23/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/15/2024
Filed — Alteration CO
THIS APPLICATION IS FILED TO CONVERT EXISTING 1 FAMILY INTO 2 FAMILY AND HORIZONTAL AND VERTICAL EXTENSION
Q01051612-P2
10/28/2024
Filed — Alteration CO
THIS APPLICATION IS FILED TO CONVERT EXISTING 1 FAMILY INTO 2 FAMILY AND HORIZONTAL AND VERTICAL EXTENSION
Q01051612-P1
10/24/2024
Permit issued — Plumbing
Q01051612-S1-PL
09/12/2024
Objection resolved — Addressed
09/12/2024
Objection resolved — Addressed
09/12/2024
Objection resolved — Addressed
09/12/2024
Objection resolved — Addressed
09/12/2024
Objection resolved — Addressed
09/12/2024
Objection resolved — Addressed
09/11/2024
Objection raised — Inspections
09/11/2024
Objection raised — Inspections
09/11/2024
Objection raised — Admin
09/11/2024
Objection raised — Energy
09/11/2024
Objection raised — Admin
09/11/2024
Objection raised — Fire_Protection
Latest 60 of 89 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC07/11/2025
DOB NOWGeneral ConstructionSigned-offB36 SERVICES INC01/13/2025
DOB NOWStructuralPermit IssuedB36 SERVICES INC12/26/2024
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC10/24/2024
DOB NOWConstruction FenceSigned-offB36 SERVICES INC06/06/2024
1 project · most recent 02/03/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/03/2025Signed-offB36 SERVICES INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Goodman GM9S800403N 3 tons · Furnace ×3
Ventilation
Panasonic Model #FV-0811RQC1 150 CFM · Exhaust Fan ×18
1 project · most recent 02/03/2025
Storm Water/Sanitary
FiledStatusContractorScope
02/03/2025Signed-offALL PRO PLBG & HTG INCStorm, Water/Sanitary
2 projects · most recent 06/27/2025
General Wiring
FiledStatusContractorScope
06/27/2025CompleteSUNRUN SOLAR ELECTL CORP—
05/29/2024CompleteRONEY ELECTRIC INCGeneral Wiring
1 project · most recent 02/03/2025
Wood
FiledStatusContractorScope
02/03/2025Signed-offB36 SERVICES INCWood
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
05/12/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/28/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/30/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/23/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/23/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/23/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/23/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/16/2024Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 105
DateRequirementInspectorRole
06/24/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
06/24/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
06/24/2025FinalWalid Abdullaprogress
06/24/2025Energy Code Compliance InspectionsWalid Abdullaprogress
06/24/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
02/03/2025Structural Wood Framesion hourizadehprogress
02/03/2025Footing and Foundationsion hourizadehprogress
02/03/2025Fire-Resistance Rated Constructionsion hourizadehprogress
02/03/2025Finalsion hourizadehprogress
02/03/2025Energy Code Compliance Inspectionssion hourizadehprogress
02/03/2025Subsurface Investigations (Borings/Test Pits)SOORJBALLY HARILALLspecial
02/03/2025Subgrade Inspectionssion hourizadehspecial
02/03/2025Structural Stability – Alterations of existing buildingssion hourizadehspecial
02/03/2025Mechanical Systemssion hourizadehspecial
02/03/2025Heating Systemssion hourizadehspecial
02/03/2025Interior lighting powersion hourizadehenergy_progress
02/03/2025Air barrier — testing FAHAD FATEHenergy_progress
02/03/2025Fenestration and door U-factor and product ratingssion hourizadehenergy_progress
02/03/2025Insulation placement and R valuession hourizadehenergy_progress
02/03/2025Protection of exposed foundation insulationsion hourizadehenergy_progress
02/03/2025Maintenance informationsion hourizadehenergy_progress
02/03/2025Duct leakage testing, insulation and designsion hourizadehenergy_progress
02/03/2025Fire-Resistant Penetrations and Jointssion hourizadehspecial
02/03/2025Excavations - Sheeting, Shoring, and Bracingsion hourizadehspecial
02/03/2025Concrete - Cast-In-Placesion hourizadehspecial
Latest 25 of 105.
▾Documents — 79 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/22/2026Q01058311-I1Request digital key ↗
08/21/2026Q01051612-P2Request digital key ↗
08/21/2026Q01051612-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q01051612-P1Open ↗
08/13/2026Q01051612-P3Open ↗
08/13/2026Q01051612-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/13/2026Q01051612-P3Open ↗
08/13/2026Q01051612-P1Open ↗
08/13/2026Q01051612-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026Q01051612-I1Open ↗
08/13/2026Q01051612-P3Open ↗
08/13/2026Q01051612-P1Open ↗
▸Seals & Professional Certifications32
▸DOB NOWProgress Inspector Seal & Signature15
09/08/2026Q01051612-P3Open ↗
09/08/2026Q01051612-P3Open ↗
09/08/2026Q01051612-P3Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/08/2026Q01051612-P3Open ↗
09/08/2026Q01051612-P3Open ↗
08/31/2026Q01051612-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/22/2026Q01058311-I1Open ↗
08/21/2026Q01051612-S1Open ↗
08/21/2026Q01051612-I1Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026Q01051612-I1Open ↗
08/13/2026Q01051612-P3Open ↗
08/13/2026Q01051612-P1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/21/2026Q01051612-S1Open ↗
08/21/2026Q01051612-I1Open ↗
08/21/2026Q01051612-P3Open ↗
Showing 3 of 6 on file for this type
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT5
08/13/2026Q01051612-P3Open ↗
08/13/2026Q01051612-I1Open ↗
08/13/2026Q01051612-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026Q01051612-S1Open ↗
08/13/2026Q01051612-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01246253-I1Open ↗
▸Other Documents14
▸DOB NOWSite Survey: Initial3
08/13/2026Q01051612-P1Open ↗
08/13/2026Q01051612-I1Open ↗
08/13/2026Q01051612-P3Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q01051612-P1Open ↗
08/13/2026Q01051612-P3Open ↗
08/13/2026Q01051612-I1Open ↗
▸DOB NOWPlot Diagram3
08/13/2026Q01051612-I1Open ↗
08/13/2026Q01051612-P1Open ↗
08/13/2026Q01051612-P3Open ↗
▸DOB NOWProperty Ownership Certification3
08/21/2026Q01051612-P1Open ↗
08/21/2026Q01051612-I1Open ↗
08/21/2026Q01051612-P3Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01051612-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q01051612-I1Open ↗