← Back
Multi-story retail building (2+)
241 BRIGHTON BEACH AVE
BROOKLYN · BIN 3244692
💬 Discuss this project
1929Year Built
2Stories
K2Building Class
R6Zoning
3,200 sfGross Floor Area
1Units
6 Open Violations ▸FDNY Report ↗
Multi-story retail building (2+) · Owner of record: 241 BRIGHTON LLC · 2,000 sf lot · 1.6 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof10p · 3 filings · 14 docs
Floor 111p · 3 filings · 12 docs
Cellar3p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
241 BRIGHTON3007/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
OCEAN ENTERPRISES INC.405/05/2025
LAURIA ASSOCIATES201/10/2024
DANIEL HOM P.E.807/28/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
QUICKFAST603/21/2026
JJ WELL CONSTRUCTION1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JJ WELL CONSTRUCTION INCGeneral Contractor407/08/2026
SBG DEVELOPMENT LLCGeneral Contractor307/08/2026
VMC PLUMBING & HEATING INPlumbing207/08/2026
RISE DEVELOPMENT PARTNERSGeneral Contractor207/08/2026
ROM PIPING & HTG INCPlumbing207/08/2026
SYED-NAQVI, ALTAFElectrical103/21/2026
BIG A CONSTRUCTION GROUPGeneral Contractor107/08/2026
SYED-NAQVI ALTAFElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LAURIA ASSOCIATES7570405/05/2025
THE ORDERING FORCE9406101/10/2024
DANIEL HOM7466707/28/2023
Building Lifecycle
All (84)Filed (14)Permit Issued (14)Signed Off (7)Violation (9)Inspection (10)Special Inspection (30)
09/24/2025
Permit issued — Mechanical Systems
B00980225-I1-MS
05/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
Khaled Mohamed
05/09/2025
Special inspection requirement — Energy Code Compliance Inspections
Khaled Mohamed
05/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Khaled Mohamed
05/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
Khaled Mohamed
05/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Khaled Mohamed
05/09/2025
Special inspection requirement — Maintenance information
Khaled Mohamed
05/05/2025
Filed — Alteration
CAP & REMOVE (1) GAS FURNACE AT 1st FL. RELOCATE (1) LAVATORY & (1) TOILET AT 1st FL. REPLACE (1) DOMESTIC WATER METER AT CEL. PROVIDE (3) NEW FLOOR DRAINS, (1) NEW GREASE TRAP , (1)NEW SEWAGE EJECTOR PUMP AT CEL
B00980220-P3
04/08/2025
Permit issued — Plumbing
B00980220-I1-PL
03/24/2025
Filed — Alteration
CAP & REMOVE (1) GAS FURNACE AT 1st FL. RELOCATE (1) LAVATORY & (1) TOILET AT 1st FL. REPLACE (1) DOMESTIC WATER METER AT CEL. PROVIDE (3) NEW FLOOR DRAINS, (1) NEW GREASE TRAP , (1)NEW SEWAGE EJECTOR PUMP AT CEL
B00980220-P2
03/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWARD LAURIA
03/21/2025
Special inspection requirement — Energy Code Compliance Inspections
EDWARD LAURIA
03/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
EDWARD LAURIA
03/21/2025
Special inspection requirement — HVAC-R and service water heating system controls
EDWARD LAURIA
03/21/2025
Special inspection requirement — Maintenance information
EDWARD LAURIA
03/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
EDWARD LAURIA
03/17/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/28/2025
Violation issued (ECB, open)
Plumbing
05/20/2024
Signed off — Alteration
Install an 8'-0" temporary wood fence to be removed only after completion of all work
B00980199-I1
04/18/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/16/2024
Permit issued — Structural
B00970234-I1-GC-CX
04/16/2024
Permit issued — Construction Fence
B00980199-I1-FN
03/14/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/02/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/25/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
01/18/2024
Permit issued — Plumbing
B00980220-I1-PL
01/10/2024
Filed — Alteration
MECHANICAL WORK ONLY AT EATING & DRINKING ESTABLISHMENT AT THE CELLAR, FIRST FLOOR & ROOF ONLY.
B00980225-I1
01/10/2024
Filed — Alteration
CAP & REMOVE (1) GAS FURNACE AT 1st FL. RELOCATE (1) LAVATORY & (1) TOILET AT 1st FL. REPLACE (1) DOMESTIC WATER METER AT CEL. PROVIDE (3) NEW FLOOR DRAINS, (1) NEW GREASE TRAP , (1)NEW SEWAGE EJECTOR PUMP AT CEL
B00980220-I1
01/09/2024
Permit issued — Structural
B00970234-I1-GC-CX
01/09/2024
Permit issued — Construction Fence
B00980199-I1-FN
01/03/2024
Filed — Alteration
Install an 8'-0" temporary wood fence to be removed only after completion of all work
B00980199-I1
01/03/2024
Filed — Alteration
B00970234-I1
11/27/2023
Signed off — Alteration
REPLACE EXISTING AC UNIT FOR 1ST FLOOR STORE. NO CHANGE OF USE EGRESS AND OCCUPANCY.
B00870383-I1
11/27/2023
Signed off — Alteration
Repair and replace 1st floor wood joists by C-joist per plan. No change use, egress or occupancy.
B00844272-I1
11/22/2023
Signed off — Alteration
INSTALL 8'0" HEIGHT CONSTRUCTION WOODEN FENCE. FILED IN CONJUNCTION WITH ALT 2. JOB # B00789846-I1
B00789846-I1
11/13/2023
Signed off — Alteration
FILE PLUMBING WORK IN CONJUNCTION WITH ALT II JOB NO. B00789846, INSTALL NEW PLUMBING FIXTURES AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00845989-I1
11/08/2023
Signed off — Alteration
FILE PLUMBING WORK IN CONJUNCTION WITH ALT II JOB NO. B00789846, INSTALL NEW PLUMBING FIXTURES AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00845989-S1
11/07/2023
Signed off — Alteration
INSTALL 8'0" HEIGHT CONSTRUCTION WOODEN FENCE. FILED IN CONJUNCTION WITH ALT 2. JOB # B00789846-I1
B00789846-S1
08/21/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/18/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/16/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/31/2023
Permit issued — General Construction
B00870383-I1-GC-CX
07/28/2023
Filed — Alteration
REPLACE EXISTING AC UNIT FOR 1ST FLOOR STORE. NO CHANGE OF USE EGRESS AND OCCUPANCY.
B00870383-I1
07/27/2023
Permit issued — Boiler Equipment
B00845989-S1-BE
06/01/2023
Filed — Alteration
FILE PLUMBING WORK IN CONJUNCTION WITH ALT II JOB NO. B00789846, INSTALL NEW PLUMBING FIXTURES AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00845989-S1
05/26/2023
Permit issued — General Construction
B00844272-I1-GC
05/26/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/26/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/23/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DANIEL HOM
05/23/2023
Special inspection requirement — Maintenance information
DANIEL HOM
05/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DANIEL HOM
05/22/2023
Special inspection requirement — Energy Code Compliance Inspections
DANIEL HOM
05/22/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
DANIEL HOM
05/22/2023
Special inspection requirement — HVAC-R and service water heating equipment
DANIEL HOM
05/22/2023
Special inspection requirement — Maintenance information
DANIEL HOM
05/22/2023
Special inspection requirement — Permanent certificate
DANIEL HOM
05/22/2023
Special inspection requirement — HVAC-R and service water heating system controls
DANIEL HOM
05/19/2023
Filed — Alteration
FILE PLUMBING WORK IN CONJUNCTION WITH ALT II JOB NO. B00789846, INSTALL NEW PLUMBING FIXTURES AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00845989-P1
05/12/2023
Special inspection requirement — Permanent certificate
DANIEL HOM
05/12/2023
Special inspection requirement — HVAC-R and service water heating equipment
DANIEL HOM
Latest 60 of 84 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedSBG DEVELOPMENT LLC09/24/2025
DOB NOWPlumbingSigned-offROM PIPING & HTG INC04/08/2025
DOB NOWStructuralPermit IssuedSBG DEVELOPMENT LLC04/16/2024
DOB NOWConstruction FenceSigned-offSBG DEVELOPMENT LLC04/16/2024
DOB NOWPlumbingSigned-offROM PIPING & HTG INC01/18/2024
DOB NOWStructuralPermit IssuedRISE DEVELOPMENT PARTNERS01/09/2024
DOB NOWConstruction FenceSigned-offRISE DEVELOPMENT PARTNERS01/09/2024
DOB NOWGeneral ConstructionSigned-offJJ WELL CONSTRUCTION INC07/31/2023
DOB NOWBoiler EquipmentSigned-offM. SPINELLI PLB & HTG INC07/27/2023
DOB NOWGeneral ConstructionSigned-offJJ WELL CONSTRUCTION INC05/26/2023
DOB NOWPlumbingSigned-offM. SPINELLI PLB & HTG INC04/26/2023
DOB NOWConstruction FenceSigned-offJJ WELL CONSTRUCTION INC04/21/2023
DOB NOWGeneral ConstructionSigned-offJJ WELL CONSTRUCTION INC02/27/2023
DOB NOWGeneral ConstructionSigned-offBIG A CONSTRUCTION GROUP09/29/2022
BISEQISSUEDINNOVATIVE CONSTRUCTION &01/02/2013
BISOTISSUEDINNOVATIVE CONSTRUCTION &01/02/2013
1 project · most recent 01/10/2024
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/10/2024Permit IssuedSBG DEVELOPMENT LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Goodman ACCU-1 Model # GSX1306118B 60,000 BTU · Rooftop Unit ×1
F-1 Model # GMSS921205DN 110,520 BTU · Furnace ×1
Ventilation
Captiveaire KX-1 Model # USB118BB-RM 2,404 CFM · Kitchen Exhaust ×1
MUA-1 Model # AS-20D 1,500 CFM · Makeup Air ×1
1 project · most recent 05/05/2025
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
05/05/2025Signed-offROM PIPING & HTG INCGas, Plumbing-Sprinkler, Water/Sanitary
4 projects · most recent 09/19/2025
General Wiring
FiledStatusContractorScope
09/19/2025Permit IssuedEMPIRE STATE ELECTL CORPGeneral Wiring
04/29/2024CompleteEMPIRE STATE ELECTL CORPGeneral Wiring
06/01/2023Permit IssuedJ Y ELECTRIC INC4 meters, 4 new_meters
04/20/2023Permit IssuedJ Y ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
03/17/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/18/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/14/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/02/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/25/2024Pass-Final PL - UndergroundPassView ↗
08/21/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/18/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/16/2023Pass-Final Boiler Equipment InspectionPassView ↗
05/26/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/26/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 52
DateRequirementInspectorRole
05/09/2025HVAC-R and service water heating system controlsKhaled Mohamedenergy_progress
05/09/2025Energy Code Compliance InspectionsKhaled Mohamedprogress
05/09/2025HVAC-R and service water piping design and insulationKhaled Mohamedenergy_progress
05/09/2025HVAC-R and service water heating equipmentKhaled Mohamedenergy_progress
05/09/2025Fire-Resistant Penetrations and JointsKhaled Mohamedspecial
05/09/2025Maintenance informationKhaled Mohamedenergy_progress
03/21/2025Fire-Resistant Penetrations and JointsEDWARD LAURIAspecial
03/21/2025Energy Code Compliance InspectionsEDWARD LAURIAprogress
03/21/2025HVAC-R and service water heating equipmentEDWARD LAURIAenergy_progress
03/21/2025HVAC-R and service water heating system controlsEDWARD LAURIAenergy_progress
03/21/2025Maintenance informationEDWARD LAURIAenergy_progress
03/21/2025HVAC-R and service water piping design and insulationEDWARD LAURIAenergy_progress
05/23/2023Fire-Resistant Penetrations and JointsDANIEL HOMspecial
05/23/2023Maintenance informationDANIEL HOMenergy_progress
05/22/2023Fire-Resistant Penetrations and JointsDANIEL HOMspecial
05/22/2023Energy Code Compliance InspectionsDANIEL HOMprogress
05/22/2023HVAC-R and service water piping design and insulationDANIEL HOMenergy_progress
05/22/2023HVAC-R and service water heating equipmentDANIEL HOMenergy_progress
05/22/2023Maintenance informationDANIEL HOMenergy_progress
05/22/2023Permanent certificateDANIEL HOMenergy_progress
05/22/2023HVAC-R and service water heating system controlsDANIEL HOMenergy_progress
05/12/2023Permanent certificateDANIEL HOMenergy_progress
05/12/2023HVAC-R and service water heating equipmentDANIEL HOMenergy_progress
05/12/2023HVAC-R and service water piping design and insulationDANIEL HOMenergy_progress
05/12/2023HVAC-R and service water heating system controlsDANIEL HOMenergy_progress
Latest 25 of 52.
▾Documents — 77 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/28/2026B00789846-P1Request digital key ↗
08/28/2026B00789846-I1Request digital key ↗
08/28/2026B00789846-S1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
01/04/2013320694218Open ↗
▸BISWORK PERMIT APPLICATION1
01/04/2013320694218Open ↗
▸Seals & Professional Certifications50
▸DOB NOWProgress Inspector Seal & Signature27
09/23/2026B00845989-S1Open ↗
09/13/2026B00844272-I1Open ↗
09/01/2026B00980220-P2Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/28/2026B00789846-P1Open ↗
08/28/2026B00789846-I1Open ↗
08/28/2026B00789846-S1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/23/2026B00845989-S1Open ↗
09/13/2026B00844272-I1Open ↗
09/01/2026B00980220-P2Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
01/04/2013320694218Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
01/04/2013320694218Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
01/04/2013320694218Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/28/2026B00789846-P1Open ↗
08/28/2026B00789846-I1Open ↗
08/27/2026B00845989-P1Open ↗
Showing 3 of 9 on file for this type
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/04/2013320694218Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00789846-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
01/04/2013320694218Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
01/04/2013320694218Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
01/03/2013320694218Open ↗