← Back
BuildNYC
Three families
241 MOUNT HOPE PLACE
BRONX · BIN 2007610
💬 Discuss this project
1899Year Built
3Stories
C0Building Class
R8Zoning
3,504 sfGross Floor Area
3Units
14 Active Violations 13 unresolved · 1 paperwork only ▸FDNY Report ↗
Three families · Owner of record: B.M.E.S. Realty · 2,000 sf lot · 1.75 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofIronfence projectUnder Construction4p · 1 filing · 20 docs
Floor 3Ironfence projectUnder Construction29p · 1 filing · 20 docs
Floor 2Ironfence projectUnder Construction30p · 1 filing · 20 docs
Floor 1Ironfence projectUnder Construction30p · 1 filing · 20 docs
CellarIronfence projectUnder Construction32p · 1 filing · 20 docs
Site & exteriorIronfence projectUnder Construction29p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EZ Builders1804/09/2026
Bmes Realty103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/04/2025$999K—— → —$285/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Adb Associates910/14/2026
Vasilios Artemiou PE409/15/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC Design File803/21/2026
BMG Group USA103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BH General ContractingGeneral Contractor307/08/2026
Mabe GroupGeneral Contractor204/09/2026
Kishan PlumbingPlumbing207/08/2026
Shtral Elect'l Cont'gElectrical103/22/2026
Dynamic Plumbing & SprinklerFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Shahrish Shuvo Engineering85241310/14/2026
Building Lifecycle
All (120)Filed (13)Permit Issued (8)Signed Off (4)Violation (16)Inspection (8)Objection (41)Special Inspection (30)
10/20/2026
Signed off — Alteration CO
Filing Sprinkler Plans subsequent to primary job number X01171295-I1
X01171295-S6
10/14/2026
Filed — Alteration CO
Filing Sprinkler Plans subsequent to primary job number X01171295-I1
X01171295-P9
10/14/2026
Special inspection requirement — HVAC-R and service water heating equipment
Shahrish Shuvo
10/14/2026
Special inspection requirement — Maintenance information
Shahrish Shuvo
10/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
10/14/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Shahrish Shuvo
10/14/2026
Special inspection requirement — HVAC-R and service water heating system controls
Shahrish Shuvo
10/14/2026
Special inspection requirement — Permanent certificate
Shahrish Shuvo
10/13/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/15/2026
Filed — Alteration CO
Filing Sprinkler Plans subsequent to primary job number X01171295-I1
X01171295-P8
09/09/2026
Special inspection requirement — Permanent certificate
Shahrish Shuvo
09/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Shahrish Shuvo
09/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
09/09/2026
Special inspection requirement — Maintenance information
Shahrish Shuvo
09/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
Shahrish Shuvo
09/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
Shahrish Shuvo
08/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/03/2026
Signed off — Alteration CO
Filing Sprinkler Plans subsequent to primary job number X01171295-I1
X01171295-S2
06/22/2026
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
06/17/2026
Signed off — Alteration CO
Filing Sprinkler Plans subsequent to primary job number X01171295-I1
X01171295-S3
06/15/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/01/2026
Permit issued — Boiler Equipment
X01171295-S6-BE
05/29/2026
Signed off — Alteration CO
Filing Sprinkler Plans subsequent to primary job number X01171295-I1
X01171295-S5
05/28/2026
Permit issued — Structural
X01171295-S5-ST
04/29/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
04/24/2026
Special inspection requirement — Post-installed Anchors
Shahrish Shuvo
04/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
04/24/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Shahrish Shuvo
04/24/2026
Special inspection requirement — Mechanical Systems
Shahrish Shuvo
04/24/2026
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
04/24/2026
Special inspection requirement — HVAC-R and service water heating equipment
Shahrish Shuvo
04/24/2026
Special inspection requirement — HVAC-R and service water heating system controls
Shahrish Shuvo
04/24/2026
Special inspection requirement — Maintenance information
Shahrish Shuvo
04/24/2026
Special inspection requirement — Final
Shahrish Shuvo
04/24/2026
Special inspection requirement — Permanent certificate
Shahrish Shuvo
04/13/2026
Objection resolved — Resolved
04/13/2026
Objection resolved — Resolved
03/30/2026
Objection resolved — Addressed
03/30/2026
Objection resolved — Addressed
03/23/2026
Objection raised — Energy
03/23/2026
Objection raised — Mechanical
03/23/2026
Objection raised — Mechanical
03/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/18/2026
Filed — Alteration CO
Filing Sprinkler Plans subsequent to primary job number X01171295-I1
X01171295-S6
03/17/2026
Special inspection requirement — Permanent certificate
Shahrish Shuvo
03/17/2026
Special inspection requirement — Maintenance information
Shahrish Shuvo
03/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Shahrish Shuvo
03/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
Shahrish Shuvo
03/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
Shahrish Shuvo
03/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
03/16/2026
Filed — Alteration CO
Filing Sprinkler Plans subsequent to primary job number X01171295-I1
X01171295-P6
02/26/2026
Filed — Alteration CO
Filing Sprinkler Plans subsequent to primary job number X01171295-I1
X01171295-P4
02/26/2026
Objection resolved — Addressed
02/25/2026
Objection raised — Other
02/18/2026
Objection resolved — Resolved
02/17/2026
Filed — Alteration CO
Filing Sprinkler Plans subsequent to primary job number X01171295-I1
X01171295-P5
02/12/2026
Filed — Alteration CO
Filing Sprinkler Plans subsequent to primary job number X01171295-I1
X01171295-S5
01/09/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/07/2026
Objection raised — Energy
Latest 60 of 120 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentPermit IssuedKishan Plumbing06/01/2026
DOB NOWStructuralSigned-offBH General Contracting05/28/2026
DOB NOWPlumbingPermit IssuedN and S Plumbing12/23/2025
DOB NOWSprinklersSigned-offCitywide Plumbing, Heating & Sprinkler12/12/2025
DOB NOWGeneral ConstructionPermit IssuedBH General Contracting11/29/2025
DOB NOWMechanical SystemsSigned-offBH General Contracting11/10/2025
DOB NOWMechanical SystemsSigned-offAB Builders NY06/11/2025
DOB NOWGeneral ConstructionPermit IssuedAB Builders NY05/23/2025
1 project · most recent 10/14/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/14/2026Signed-offBH General ContractingHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin 2MXS18NMVJUA 144,000 BTU · Heat Pump Outdoor ×8
RXS12LVJU 24,000 BTU · Heat Pump Outdoor ×2
Ventilation
Nutone AEN110 110 CFM · Exhaust Fan ×20
QTXEN150 150 CFM · Exhaust Fan ×20
1 project · most recent 10/14/2026
Sprinkler System
FiledStatusContractorScope
10/14/2026Signed-offDynamic Plumbing & SprinklerSprinkler System
1 project · most recent 10/14/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/14/2026Permit IssuedKishan PlumbingGas, Storm, Water/Sanitary
3 projects · most recent 10/06/2026
General Wiring
FiledStatusContractorScope
10/06/2026Permit IssuedShtral Elect'l Cont'gGeneral Wiring
07/30/2026Permit IssuedTitan Electrical & Elev ContractingGeneral Wiring
02/10/2026Permit IssuedTitan Electrical & Elev Contracting—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
10/13/2026Pass-Final Boiler Equipment InspectionPassView ↗
08/06/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/22/2026Fail-Final Boiler Equipment InspectionFailView ↗
06/15/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/29/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/09/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/31/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/31/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 85
DateRequirementInspectorRole
10/14/2026Permanent certificateShahrish Shuvoenergy_progress
10/14/2026HVAC-R and service water heating equipmentShahrish Shuvoenergy_progress
10/14/2026Maintenance informationShahrish Shuvoenergy_progress
10/14/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
10/14/2026HVAC-R and service water piping design and insulationShahrish Shuvoenergy_progress
10/14/2026HVAC-R and service water heating system controlsShahrish Shuvoenergy_progress
09/09/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
09/09/2026HVAC-R and service water piping design and insulationShahrish Shuvoenergy_progress
09/09/2026HVAC-R and service water heating system controlsShahrish Shuvoenergy_progress
09/09/2026Maintenance informationShahrish Shuvoenergy_progress
09/09/2026Permanent certificateShahrish Shuvoenergy_progress
09/09/2026HVAC-R and service water heating equipmentShahrish Shuvoenergy_progress
04/24/2026Maintenance informationShahrish Shuvoenergy_progress
04/24/2026HVAC-R and service water heating system controlsShahrish Shuvoenergy_progress
04/24/2026HVAC-R and service water heating equipmentShahrish Shuvoenergy_progress
04/24/2026Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
04/24/2026Fire-Resistance Rated ConstructionShahrish Shuvoprogress
04/24/2026FinalShahrish Shuvoprogress
04/24/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
04/24/2026Post-installed AnchorsShahrish Shuvospecial
04/24/2026Mechanical SystemsShahrish Shuvospecial
04/24/2026HVAC-R and service water piping design and insulationShahrish Shuvoenergy_progress
04/24/2026Permanent certificateShahrish Shuvoenergy_progress
03/19/2026Structural Stability – Alterations of existing buildings—special
03/17/2026Permanent certificateShahrish Shuvoenergy_progress
Latest 25 of 85.
▾Documents — 75 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/17/2026X01171295-I1Request digital key ↗
08/17/2026X01171295-S1Request digital key ↗
08/17/2026X01171295-P5Request digital key ↗
Showing 3 of 12 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/17/2026X01171295-I1Open ↗
08/17/2026X01171295-P6Open ↗
08/15/2026X01171295-P1Open ↗
▸Seals & Professional Certifications41
▸DOB NOWProgress Inspector Seal & Signature16
10/16/2026X01171295-P9Open ↗
10/04/2026X01171295-P8Open ↗
09/02/2026X01171295-S2Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
10/16/2026X01171295-P9Open ↗
10/04/2026X01171295-P8Open ↗
09/02/2026X01171295-S2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
10/16/2026X01171295-P9Open ↗
10/04/2026X01171295-P8Open ↗
08/17/2026X01171295-P5Open ↗
Showing 3 of 12 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/17/2026X01171295-I1Open ↗
08/17/2026X01171295-P6Open ↗
08/15/2026X01171295-P1Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
10/16/2026X01171295-P9Open ↗
10/04/2026X01171295-P8Open ↗
08/17/2026X01171295-P5Open ↗
Showing 3 of 13 on file for this type
▸Other Documents3
▸DOB NOWProperty Ownership Certification3
08/17/2026X01171295-I1Open ↗
08/17/2026X01171295-P6Open ↗
08/15/2026X01171295-P1Open ↗