← Back
Office with commercial, 7-19 stories
241 WEST 37 STREET
MANHATTAN · Midtown-Times Square · BIN 1014455
💬 Discuss this project
1913Year Built
12Stories
O6Building Class
M1-9AZoning
87,802 sfGross Floor Area
65Units
LL97 Covered23 Open Violations 20 unresolved · 3 paperwork only ▸FISP: SWARMP
Office with commercial, 7-19 stories · Owner of record: CF 241 W 37 · 7,406 sf lot · 11.86 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Floor 121p · 1 filing · 5 docs
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 16p · 1 filing · 12 docs
Cellar3p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LIBERTY STAR MANAGEMENT2609/13/2026
JERRICK ASSOCIATES703/22/2026
CF 241 W 37503/22/2026
CF 241 W 37 CHETRIT GROUP603/22/2026
CHERIT GROUP103/22/2026
241 W 37 ST ASSOCIATES LP103/22/2026
241 / 37 REALTY LLC103/22/2026
TO OWNER OF PREMISES 241103/22/2026
CHETRIT GROUP203/22/2026
EAST GATE REALTY603/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROBERT GERMAIN JR. PE608/21/2026
JACOBSON SHINODA ARCHITECTS309/03/2025
IAQ SYSTEMS INC104/01/2021
BAILEYS ENGINEERING PC111/30/2017
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RITE ONE EXPEDITING303/21/2026
AE DESIGN SOLUTION203/21/2026
ROBERT PAPAZIAN ARCHITECT PC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JERRICK ASSOCIATES INCGeneral Contractor403/21/2026
BOZZO, WILLIAMElectrical203/21/2026
COOPER, BRANDONElectrical203/21/2026
BELL FUEL OIL, LLCPlumbing206/28/2026
STROM, MElectrical203/21/2026
ISAAC GELBElectrical103/21/2026
JACKUS, STEVEElectrical103/21/2026
ROBERT CHIMENTIElectrical103/21/2026
ROBERT CHIMENTIElectrical103/22/2026
ROBERT EDELSTEINElectrical103/21/2026
THYSSEN KRUPP ELEVATORElectrical103/21/2026
TOMASZ PUZAElectrical103/21/2026
TRISTATE FIRE SPRINK INCFire Protection107/08/2026
GUARANTEED HOME IMPROVEMEGeneral Contractor107/08/2026
MKSSKR CONSULTING SERVICEGeneral Contractor104/09/2026
BENJAMIN DREBINElectrical103/21/2026
GREGG NY PLUMBING, INCPlumbing107/08/2026
CHIMENTI, ROBERTElectrical103/21/2026
DOMENICI, JElectrical103/21/2026
GONZALEZ, RAFAELElectrical103/21/2026
HINKE, WILLIAMElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ROBERT F. GERMAIN JR. PE5100608/21/2026
JACOBSON SHINODA ARCHITEC7884109/03/2025
METRO FIRE CONTROL LLC4538104/01/2021
Building Lifecycle
All (130)Filed (11)Permit Issued (10)Signed Off (4)Facade (FISP) (14)Violation (60)Inspection (10)Objection (8)Special Inspection (13)
09/04/2026
Signed off — Alteration
REPLACEMENT (1) NEW LOW PRESSURE BOILER AND (1) NEW COMBINATION GAS/OIL BURNER. CHANGE GRADE OF FUEL OIL FROM#4 OIL TO #2 OIL. NO CHANGE IN MEANS OF EGRESS USE GROUP OCCUPANCY.
M00782337-I1
08/21/2026
Filed — Alteration
NEW LOW PRESSURE GAS SERVICE, NEW LOW PRESSURE GAS LINE, NEW GAS METER, NEW GAS TRAIN, RECONNECT EXISTING HOUSE SERVICE. RELOCATE GAS METER FOR EXISTING HEAT/AC UNIT IN REAR OF BUILDING. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M00782312-P3
08/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
04/29/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/06/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/07/2026
Filed — Alteration
NEW LOW PRESSURE GAS SERVICE, NEW LOW PRESSURE GAS LINE, NEW GAS METER, NEW GAS TRAIN, RECONNECT EXISTING HOUSE SERVICE. RELOCATE GAS METER FOR EXISTING HEAT/AC UNIT IN REAR OF BUILDING. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M00782312-P2
12/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/09/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/01/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/01/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/10/2025
Permit issued — Mechanical Systems
M01260555-I1-GC-CX
09/08/2025
Permit issued — Plumbing
M01260555-S1-PL
09/03/2025
Filed — Alteration
GENERAL CONSTRUCTION AS PER PLANS HEREWITH FILED.
M01260555-S2
09/03/2025
Filed — Alteration
GENERAL CONSTRUCTION AS PER PLANS HEREWITH FILED.
M01260555-I1
09/03/2025
Filed — Alteration
GENERAL CONSTRUCTION AS PER PLANS HEREWITH FILED.
M01260555-S1
09/03/2025
Special inspection requirement — Sprinkler Systems
08/05/2025
Permit issued — Plumbing
M00782312-I1-PL
07/23/2025
Special inspection requirement — Mechanical Systems
PETER SHINODA
07/23/2025
Special inspection requirement — Final
PETER SHINODA
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/22/2024
Filed — Alteration
NEW LOW PRESSURE GAS SERVICE, NEW LOW PRESSURE GAS LINE, NEW GAS METER, NEW GAS TRAIN, RECONNECT EXISTING HOUSE SERVICE. RELOCATE GAS METER FOR EXISTING HEAT/AC UNIT IN REAR OF BUILDING. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M00782312-P1
07/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
07/11/2024
Violation issued (ECB, open)
Construction
07/11/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/01/2024
Permit issued — Boiler Equipment
M00782337-I1-BE
05/30/2024
Violation issued (ECB, open)
Construction
09/06/2023
Signed off — Alteration
M00782230-I1
05/19/2023
Cycle 9 facade report submitted
05/19/2023
Cycle 9 facade report signed — SWARMP
05/12/2023
Signed off — Alteration
Installation of new sprinkler heads in existing office areas to ensure proper coverage. This is a modification to an existing system.
M00491645-I1
04/14/2023
Violation issued (ECB, open)
Construction
04/08/2023
Cycle 9 facade inspection completed
02/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/02/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/30/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/30/2022
Permit issued — General Construction
M00782230-I1-GC
08/29/2022
Permit issued — Boiler Equipment
M00782337-I1-BE
08/29/2022
Permit issued — Plumbing
M00782312-I1-PL
08/24/2022
Filed — Alteration
REPLACEMENT (1) NEW LOW PRESSURE BOILER AND (1) NEW COMBINATION GAS/OIL BURNER. CHANGE GRADE OF FUEL OIL FROM#4 OIL TO #2 OIL. NO CHANGE IN MEANS OF EGRESS USE GROUP OCCUPANCY.
M00782337-I1
08/24/2022
Filed — Alteration
NEW LOW PRESSURE GAS SERVICE, NEW LOW PRESSURE GAS LINE, NEW GAS METER, NEW GAS TRAIN, RECONNECT EXISTING HOUSE SERVICE. RELOCATE GAS METER FOR EXISTING HEAT/AC UNIT IN REAR OF BUILDING. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M00782312-I1
08/24/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
08/23/2022
Filed — Alteration
M00782230-I1
08/15/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/27/2022
Special inspection requirement — HVAC-R and service water heating equipment
Robert Germain Jr.
07/27/2022
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Robert Germain Jr.
07/27/2022
Special inspection requirement — Maintenance information
Robert Germain Jr.
07/27/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Robert Germain Jr.
07/27/2022
Special inspection requirement — HVAC-R and service water heating system controls
Robert Germain Jr.
12/17/2021
Violation issued (ECB, open)
Construction
12/03/2021
Permit issued — Sprinklers
M00491645-I1-EW-SP
07/14/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/14/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/14/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/14/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/20/2021
Violation issued (ECB, open)
Construction
04/02/2021
Objection raised — Mechanical
04/02/2021
Objection resolved — Addressed
04/02/2021
Objection raised — Admin
04/02/2021
Objection resolved — Addressed
Latest 60 of 130 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedMKSSKR CONSULTING SERVICE09/10/2025
DOB NOWPlumbingSigned-offGREGG NY PLUMBING, INC09/08/2025
DOB NOWPlumbingPermit IssuedBELL FUEL OIL, LLC08/05/2025
DOB NOWBoiler EquipmentSigned-offAPPROVED OIL CO OF BKLYN07/01/2024
DOB NOWGeneral ConstructionSigned-offGUARANTEED HOME IMPROVEME08/30/2022
DOB NOWBoiler EquipmentSigned-offAPPROVED OIL CO OF BKLYN08/29/2022
DOB NOWPlumbingPermit IssuedBELL FUEL OIL, LLC08/29/2022
DOB NOWSprinklersSigned-offTRISTATE FIRE SPRINK INC12/03/2021
DOB NOWSidewalk ShedSigned-offGE 2A CONSTRUCTION03/29/2018
DOB NOWSidewalk ShedSigned-offGE 2A CONSTRUCTION11/30/2017
BISOTISSUEDJERRICK ASSOCIATES INC03/28/2018
BISOTISSUEDJERRICK ASSOCIATES INC11/14/2017
BISPLISSUEDAMOK INC01/29/2008
BISOTISSUEDPALISADES CONSTRUCTION LLC08/28/2007
BISMHISSUEDPALLSADES CONSTRUCTION LLC08/17/2007
BISMHISSUEDPALISADES CONSTRUCTION12/07/2006
BISOTISSUEDPALISADES CONSTRUCTION LLC05/05/2006
BISOTISSUEDPALLISADES CONSTRCTION, LLC.12/27/2005
BISFSISSUEDBAYRIDGE FUEL CORP.02/22/2005
BISMHISSUEDPALISADES REALTY LLC08/08/2003
BISOTISSUEDPALISADES REALTY LLC06/18/2003
BISOTISSUEDD.P. CONSULTING LLC06/13/2003
BISMHISSUEDPALISADES REALTY LLC10/22/2002
BISEQISSUEDKADOSH ASSOCIATES INC06/24/2002
BISMHISSUEDFARRINGTON CONSTRUCTION INC.06/12/2002
BISMHISSUEDPALISADES REALTY LLC01/22/2002
BISMHISSUEDFARRINGTON CONSTRUCTION INC.10/11/2001
BISOTISSUEDPALISADES REALTY, LLC.08/10/2001
BISMHISSUEDFAR EAST GLASS CO05/12/1999
BISEQISSUEDFAR EAST GLASS CO05/12/1999
BISPLISSUEDNAT'L MECH. SVCS PLBG LLC05/21/1991
BISBLISSUEDSUPREME STEAM APPLIANCE CORP.01/02/1991
BISPLISSUEDNAT'L MECH. SVCS PLBG LLC01/02/1991
1 project · most recent 09/03/2025
Sprinkler System
FiledStatusContractorScope
09/03/2025——Sprinkler System
2 projects · most recent 08/21/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/21/2026Permit IssuedBELL FUEL OIL, LLCGas
09/03/2025Signed-offGREGG NY PLUMBING, INCWater/Sanitary
1 project · most recent 09/15/2022
FiledStatusContractorScope
09/15/2022Permit IssuedROBERT CHIMENTI8 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
04/29/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/06/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/09/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/01/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/01/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/11/2024Pass-Final Boiler Equipment InspectionPassView ↗
12/02/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/30/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
08/19/2026Fire-Resistant Penetrations and JointsRobert Germain Jr.special
09/03/2025Sprinkler Systems—special
07/23/2025Mechanical SystemsPETER SHINODAspecial
07/23/2025FinalPETER SHINODAprogress
07/18/2024Fire-Resistant Penetrations and JointsRobert Germain Jr.special
08/24/2022Fire-Resistant Penetrations and JointsRobert Germain Jr.special
07/27/2022HVAC-R and service water heating equipmentRobert Germain Jr.energy_progress
07/27/2022Fuel-Oil Storage and Fuel-Oil Piping SystemsRobert Germain Jr.special
07/27/2022Maintenance informationRobert Germain Jr.energy_progress
07/27/2022HVAC-R and service water piping design and insulationRobert Germain Jr.energy_progress
07/27/2022HVAC-R and service water heating system controlsRobert Germain Jr.energy_progress
03/23/2021Sprinkler SystemsJEFFREY HANDLERspecial
10/27/2017FinalPAUL BAILEYprogress
▾Documents — 65 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
09/06/2026M00001353-I1Request digital key ↗
09/02/2026M00782230-I1Request digital key ↗
09/02/2026M00782337-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits2
▸BISWORK PERMIT APPLICATION1
11/15/2017123254325Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
11/09/2017123254325Open ↗
▸Seals & Professional Certifications27
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/03/2026M00491645-I1Open ↗
09/02/2026M00782230-I1Open ↗
08/26/2026M00782312-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026M00782312-P3Open ↗
09/23/2026M00782337-I1Open ↗
09/23/2026M00782337-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026M00782337-I1Open ↗
09/23/2026M00782337-I1Open ↗
09/23/2026M00782337-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
10/22/2018123254325Open ↗
10/22/2018123254325Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/09/2017123254325Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/09/2017123254325Open ↗
▸Safety & Tenant Protection9
▸DOB NOWHPD-1: Anti-Harassment Area Checklist7
08/26/2026M00782312-P3Open ↗
08/15/2026M00491645-I1Open ↗
08/13/2026M00782312-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWCertificate of No Harassment2
08/13/2026M01260555-I1Open ↗
08/13/2026M00782230-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/21/2026M01260555-I1Open ↗
08/21/2026M01260555-S1Open ↗
08/21/2026M01260555-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
09/02/2026M00782230-I1Open ↗
08/26/2026M00782312-I1Open ↗
08/13/2026M00782337-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/09/2017123254325Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
10/22/2018123254325Open ↗
10/22/2018123254325Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/22/2018123254325Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/22/2018123254325Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
10/22/2018123254325Open ↗
11/09/2017123254325Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
11/09/2017123254325Open ↗
▸BISBOROUGH INTAKE FORM1
10/22/2018123254325Open ↗