← Back
BuildNYC
Office with commercial, 7-19 stories
241 WEST 37TH STREET
MANHATTAN · BIN 1014455
💬 Discuss this project
1913Year Built
12Stories
O6Building Class
M1-9AZoning
87,802 sfGross Floor Area
65Units
LL97 Covered8 Active Violations 5 unresolved · 3 paperwork only 1 likely answered 7 old, status unconfirmed ▸FISP: SWARMP
Office with commercial, 7-19 stories · Owner of record: CF 241 W 37 · 7,406 sf lot · 11.86 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsLiberty Star Management LLC1 filing
Floor 12 Kings5p · 1 filing · 12 docs
CellarConsolidated Edison3p · 3 filings · 20 docs
Site & exteriorJerrick Associates, INC.1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
241 37 Realty Group3003/21/2026
Jerrick Associates703/22/2026
Eastgate Realty203/21/2026
CF241 W 37103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Robert Germain Jr. PE608/21/2026
Jacobson Shinoda Architects309/03/2025
Iaq Systems104/01/2021
Baileys Engineering111/30/2017
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rite One Expediting303/21/2026
AE Design Solution203/21/2026
Robert Papazian Architect203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Jerrick AssociatesScaffold403/21/2026
Bell Fuel OilPlumbing206/28/2026
Grand Electric ServiceElectrical203/21/2026
Amko Electric Construction & Maintenance IElectrical103/21/2026
Chaim ElectricElectrical103/21/2026
Tikvah Electric CoElectrical103/21/2026
Apollo Electric NYGElectrical103/21/2026
Guaranteed Home ImprovemeGeneral Contractor107/08/2026
Mksskr Consulting ServiceGeneral Contractor104/09/2026
Gregg NY PlumbingPlumbing107/08/2026
Accurate ElectricalElectrical103/21/2026
Tristate Fire SprinklersFire Protection107/08/2026
J. D. ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Robert F. Germain Jr. PE5100608/21/2026
Jacobson Shinoda Architects7884109/03/2025
Metro Fire Control4538104/01/2021
Building Lifecycle
All (128)Filed (11)Permit Issued (10)Signed Off (5)Facade (FISP) (14)Violation (60)Inspection (7)Objection (8)Special Inspection (13)
09/04/2026
Signed off — Alteration
REPLACEMENT (1) NEW LOW PRESSURE BOILER AND (1) NEW COMBINATION GAS/OIL BURNER. CHANGE GRADE OF FUEL OIL FROM#4 OIL TO #2 OIL. NO CHANGE IN MEANS OF EGRESS USE GROUP OCCUPANCY.
M00782337-I1
09/04/2026
Signed off — Alteration
NEW LOW PRESSURE GAS SERVICE, NEW LOW PRESSURE GAS LINE, NEW GAS METER, NEW GAS TRAIN, RECONNECT EXISTING HOUSE SERVICE. RELOCATE GAS METER FOR EXISTING HEAT/AC UNIT IN REAR OF BUILDING. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M00782312-I1
08/21/2026
Filed — Alteration
NEW LOW PRESSURE GAS SERVICE, NEW LOW PRESSURE GAS LINE, NEW GAS METER, NEW GAS TRAIN, RECONNECT EXISTING HOUSE SERVICE. RELOCATE GAS METER FOR EXISTING HEAT/AC UNIT IN REAR OF BUILDING. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M00782312-P3
08/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
04/29/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/06/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/07/2026
Filed — Alteration
NEW LOW PRESSURE GAS SERVICE, NEW LOW PRESSURE GAS LINE, NEW GAS METER, NEW GAS TRAIN, RECONNECT EXISTING HOUSE SERVICE. RELOCATE GAS METER FOR EXISTING HEAT/AC UNIT IN REAR OF BUILDING. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M00782312-P2
12/09/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/10/2025
Permit issued — Mechanical Systems
M01260555-I1-GC-CX
09/08/2025
Permit issued — Plumbing
M01260555-S1-PL
09/03/2025
Filed — Alteration
GENERAL CONSTRUCTION AS PER PLANS HEREWITH FILED.
M01260555-S2
09/03/2025
Filed — Alteration
GENERAL CONSTRUCTION AS PER PLANS HEREWITH FILED.
M01260555-S1
09/03/2025
Filed — Alteration
GENERAL CONSTRUCTION AS PER PLANS HEREWITH FILED.
M01260555-I1
09/03/2025
Special inspection requirement — Sprinkler Systems
08/05/2025
Permit issued — Plumbing
M00782312-I1-PL
07/23/2025
Special inspection requirement — Mechanical Systems
PETER SHINODA
07/23/2025
Special inspection requirement — Final
PETER SHINODA
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/22/2024
Filed — Alteration
NEW LOW PRESSURE GAS SERVICE, NEW LOW PRESSURE GAS LINE, NEW GAS METER, NEW GAS TRAIN, RECONNECT EXISTING HOUSE SERVICE. RELOCATE GAS METER FOR EXISTING HEAT/AC UNIT IN REAR OF BUILDING. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M00782312-P1
07/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
07/11/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/01/2024
Permit issued — Boiler Equipment
M00782337-I1-BE
06/17/2024
Violation issued (ECB, open)
Construction
05/15/2024
Violation issued (ECB, open)
Construction
09/06/2023
Signed off — Alteration
M00782230-I1
05/19/2023
Cycle 9 facade report submitted
05/19/2023
Cycle 9 facade report signed — SWARMP
05/12/2023
Signed off — Alteration
Installation of new sprinkler heads in existing office areas to ensure proper coverage. This is a modification to an existing system.
M00491645-I1
04/14/2023
Violation issued (ECB, open)
Construction
04/08/2023
Cycle 9 facade inspection completed
02/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/02/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/30/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/30/2022
Permit issued — General Construction
M00782230-I1-GC
08/29/2022
Permit issued — Boiler Equipment
M00782337-I1-BE
08/29/2022
Permit issued — Plumbing
M00782312-I1-PL
08/24/2022
Filed — Alteration
REPLACEMENT (1) NEW LOW PRESSURE BOILER AND (1) NEW COMBINATION GAS/OIL BURNER. CHANGE GRADE OF FUEL OIL FROM#4 OIL TO #2 OIL. NO CHANGE IN MEANS OF EGRESS USE GROUP OCCUPANCY.
M00782337-I1
08/24/2022
Filed — Alteration
NEW LOW PRESSURE GAS SERVICE, NEW LOW PRESSURE GAS LINE, NEW GAS METER, NEW GAS TRAIN, RECONNECT EXISTING HOUSE SERVICE. RELOCATE GAS METER FOR EXISTING HEAT/AC UNIT IN REAR OF BUILDING. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M00782312-I1
08/24/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
08/23/2022
Filed — Alteration
M00782230-I1
08/15/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/27/2022
Special inspection requirement — HVAC-R and service water heating equipment
Robert Germain Jr.
07/27/2022
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Robert Germain Jr.
07/27/2022
Special inspection requirement — Maintenance information
Robert Germain Jr.
07/27/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Robert Germain Jr.
07/27/2022
Special inspection requirement — HVAC-R and service water heating system controls
Robert Germain Jr.
12/17/2021
Violation issued (ECB, open)
Construction
12/03/2021
Permit issued — Sprinklers
M00491645-I1-EW-SP
07/14/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/14/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/14/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/14/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/20/2021
Violation issued (ECB, open)
Construction
04/02/2021
Objection raised — Mechanical
04/02/2021
Objection resolved — Addressed
04/02/2021
Objection raised — Admin
04/02/2021
Objection resolved — Addressed
04/02/2021
Objection raised — Admin
04/02/2021
Objection resolved — Addressed
Latest 60 of 128 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedMksskr Consulting Service09/10/2025
DOB NOWPlumbingSigned-offGregg NY Plumbing09/08/2025
DOB NOWPlumbingSigned-offBell Fuel Oil08/05/2025
DOB NOWBoiler EquipmentSigned-offApproved Oil Co of Brooklyn07/01/2024
DOB NOWGeneral ConstructionSigned-offGuaranteed Home Improveme08/30/2022
DOB NOWBoiler EquipmentSigned-offApproved Oil Co of Brooklyn08/29/2022
DOB NOWPlumbingSigned-offBell Fuel Oil08/29/2022
DOB NOWSprinklersSigned-offTristate Fire Sprinkler12/03/2021
DOB NOWSidewalk ShedSigned-offGE 2A Construction03/29/2018
DOB NOWSidewalk ShedSigned-offGE 2A Construction11/30/2017
BISOTISSUEDJerrick Associates03/28/2018
BISOTISSUEDJerrick Associates11/14/2017
BISPLISSUEDAmok01/29/2008
BISOTISSUEDPalisades Construction08/28/2007
BISMHISSUEDPallsades Construction08/17/2007
BISMHISSUEDPalisades Construction12/07/2006
BISOTISSUEDPalisades Construction05/05/2006
BISOTISSUEDPallisades Constrction12/27/2005
BISFSISSUEDBayridge Fuel02/22/2005
BISMHISSUEDPalisades Realty08/08/2003
BISOTISSUEDPalisades Realty06/18/2003
BISOTISSUEDD.P. Consulting06/13/2003
BISMHISSUEDPalisades Realty10/22/2002
BISEQISSUEDKadosh Associates06/24/2002
BISMHISSUEDFarrington Construction06/12/2002
BISMHISSUEDPalisades Realty01/22/2002
BISMHISSUEDFarrington Construction10/11/2001
BISOTISSUEDPalisades Realty08/10/2001
BISMHISSUEDFar East Glass Co05/12/1999
BISEQISSUEDFar East Glass Co05/12/1999
BISPLISSUEDNational Mechanical Services Plumbing05/21/1991
BISBLISSUEDSupreme Steam Appliance01/02/1991
BISPLISSUEDNational Mechanical Services Plumbing01/02/1991
1 project · most recent 09/03/2025
Sprinkler System
FiledStatusContractorScope
09/03/2025——Sprinkler System
2 projects · most recent 08/21/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/21/2026Signed-offBell Fuel OilGas
09/03/2025Signed-offGregg NY PlumbingWater/Sanitary
1 project · most recent 09/15/2022
FiledStatusContractorScope
09/15/2022Permit IssuedRobert Chimenti8 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
04/29/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/06/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/09/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/11/2024Pass-Final Boiler Equipment InspectionPassView ↗
12/02/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/30/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
08/19/2026Fire-Resistant Penetrations and JointsRobert Germain Jr.special
09/03/2025Sprinkler Systems—special
07/23/2025Mechanical SystemsPETER SHINODAspecial
07/23/2025FinalPETER SHINODAprogress
07/18/2024Fire-Resistant Penetrations and JointsRobert Germain Jr.special
08/24/2022Fire-Resistant Penetrations and JointsRobert Germain Jr.special
07/27/2022HVAC-R and service water heating equipmentRobert Germain Jr.energy_progress
07/27/2022Fuel-Oil Storage and Fuel-Oil Piping SystemsRobert Germain Jr.special
07/27/2022Maintenance informationRobert Germain Jr.energy_progress
07/27/2022HVAC-R and service water piping design and insulationRobert Germain Jr.energy_progress
07/27/2022HVAC-R and service water heating system controlsRobert Germain Jr.energy_progress
03/23/2021Sprinkler SystemsJEFFREY HANDLERspecial
10/27/2017FinalPAUL BAILEYprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Consolidated EdisonBase Building / Common AreasCellar
Project M00782312 Alteration · LOC Issued · 08/24/2022
Project M00782337 Alteration · LOC Issued · 08/24/2022
Project M00782230 Alteration · LOC Issued · 08/23/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 65 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
09/06/2026M00001353-I1Request digital key ↗
09/02/2026M00782230-I1Request digital key ↗
09/02/2026M00782337-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits2
▸BISWORK PERMIT APPLICATION1
11/15/2017123254325Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
11/09/2017123254325Open ↗
▸Seals & Professional Certifications27
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/03/2026M00491645-I1Open ↗
09/02/2026M00782230-I1Open ↗
08/26/2026M00782312-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026M00782312-P3Open ↗
09/23/2026M00782337-I1Open ↗
09/23/2026M00782337-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026M00782337-I1Open ↗
09/23/2026M00782337-I1Open ↗
09/23/2026M00782337-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
10/22/2018123254325Open ↗
10/22/2018123254325Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/09/2017123254325Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/09/2017123254325Open ↗
▸Safety & Tenant Protection9
▸DOB NOWHPD-1: Anti-Harassment Area Checklist7
08/26/2026M00782312-P3Open ↗
08/15/2026M00491645-I1Open ↗
08/13/2026M00782312-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWCertificate of No Harassment2
08/13/2026M01260555-I1Open ↗
08/13/2026M00782230-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/21/2026M01260555-I1Open ↗
08/21/2026M01260555-S1Open ↗
08/21/2026M01260555-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
09/02/2026M00782230-I1Open ↗
08/26/2026M00782312-I1Open ↗
08/13/2026M00782337-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/09/2017123254325Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
10/22/2018123254325Open ↗
10/22/2018123254325Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/22/2018123254325Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/22/2018123254325Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
10/22/2018123254325Open ↗
11/09/2017123254325Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
11/09/2017123254325Open ↗
▸BISBOROUGH INTAKE FORM1
10/22/2018123254325Open ↗