← Back
Five to six families
241 WEST 4 STREET
MANHATTAN · BIN 1010821
💬 Discuss this project
1920Year Built
3Stories
C2Building Class
C2-6Zoning
4,624 sfGross Floor Area
5Units
Rent Stabilized9 Open Violations ▸
Five to six families · Owner of record: ELI3 LLC · 2,069 sf lot · 2.23 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction67p · 1 filing · 20 docs
Floor 3Under Construction77p · 1 filing · 20 docs
Floor 2Under Construction80p · 1 filing · 20 docs
Floor 1Under Construction76p · 1 filing · 20 docs
CellarUnder Construction76p · 1 filing · 20 docs
BasementUnder Construction81p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STEEL CONSTRUCTION309/13/2026
ELI3 LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/11/2024$7.8M—Private party → ELI3 LLC$1,696/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
M HASHAS1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
R&S ELITE CONSTRUCTIONGeneral Contractor1408/05/2026
STEEL CONSTRUCTION LLCGeneral Contractor207/09/2026
H.K. MECHANICAL SVC CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MICHAEL PATINO ARCHITECTU81701207/02/2026
Building Lifecycle
All (99)Filed (14)Permit Issued (14)Violation (22)Inspection (13)Objection (6)Special Inspection (30)
08/24/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/05/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/04/2026
Permit issued — General Construction
M01105778-S5-GC
07/21/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/07/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01426683-I1
07/07/2026
Permit issued — Supported Scaffold
M01426683-I1-SF
07/06/2026
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01426669-I1
07/06/2026
Permit issued — Sidewalk Shed
M01426669-I1-SH
07/06/2026
Permit issued — General Construction
M01105778-S3-GC-CX
07/06/2026
Permit issued — General Construction
M01105778-I1-GC
07/02/2026
Filed — Alteration CO
Filing for temporary shoring in conjunction with the alteration project.
M01105778-S5
07/02/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Patino
07/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
Michael Patino
07/01/2026
Permit issued — Plumbing
M01105778-S1-PL
06/18/2026
Filed — Alteration CO
Filing for temporary shoring in conjunction with the alteration project.
M01105778-P6
06/18/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Michael Patino
06/18/2026
Special inspection requirement — Masonry
Michael Patino
06/18/2026
Special inspection requirement — Post-installed Anchors
Michael Patino
06/18/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Michael Patino
06/18/2026
Special inspection requirement — Fire-Resistance Rated Construction
Michael Patino
06/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Patino
06/18/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/16/2026
Filed — Alteration CO
Filing for temporary shoring in conjunction with the alteration project.
M01105778-P5
05/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Patino
04/30/2026
Filed — Alteration CO
Filing for temporary shoring in conjunction with the alteration project.
M01105778-P4
04/29/2026
Violation issued (HPD, open)
A
03/06/2026
Special inspection requirement — Post-installed Anchors
Michael Patino
03/06/2026
Special inspection requirement — Structural Cold-Formed Steel
Michael Patino
03/06/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Michael Patino
03/06/2026
Special inspection requirement — Structural Steel - Details
Michael Patino
03/06/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Michael Patino
03/06/2026
Special inspection requirement — Structural Steel - Welding
Michael Patino
03/06/2026
Special inspection requirement — Final
Michael Patino
03/06/2026
Special inspection requirement — Footing and Foundation
Michael Patino
03/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
Michael Patino
03/06/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Michael Patino
03/06/2026
Special inspection requirement — Post-installed Anchors
Michael Patino
03/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Patino
03/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Patino
03/06/2026
Special inspection requirement — Masonry
Michael Patino
02/25/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/22/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/17/2025
Violation issued (HPD, open)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/10/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/29/2025
Filed — Alteration CO
Filing for temporary shoring in conjunction with the alteration project.
M01105778-P3
10/20/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Michael Patino
10/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Patino
10/20/2025
Special inspection requirement — Masonry
Michael Patino
10/20/2025
Special inspection requirement — Post-installed Anchors
Michael Patino
10/20/2025
Special inspection requirement — Fire-Resistance Rated Construction
Michael Patino
09/03/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/25/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/07/2025
Permit issued — Structural
M01105778-S4-ST
07/29/2025
Filed — Alteration CO
Filing for temporary shoring in conjunction with the alteration project.
M01105778-S4
07/29/2025
Permit issued — Plumbing
M01105778-S1-PL
07/08/2025
Permit issued — Mechanical Systems
M01105778-S2-MS
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedR&S ELITE CONSTRUCTION08/04/2026
DOB NOWSupported ScaffoldPermit IssuedSTEEL CONSTRUCTION LLC07/07/2026
DOB NOWSidewalk ShedPermit IssuedSTEEL CONSTRUCTION LLC07/06/2026
DOB NOWGeneral ConstructionPermit IssuedR&S ELITE CONSTRUCTION07/06/2026
DOB NOWGeneral ConstructionPermit IssuedR&S ELITE CONSTRUCTION07/06/2026
DOB NOWPlumbingPermit IssuedH.K. MECHANICAL SVC CORP07/01/2026
DOB NOWStructuralPermit IssuedR&S ELITE CONSTRUCTION08/07/2025
DOB NOWPlumbingPermit IssuedH.K. MECHANICAL SVC CORP07/29/2025
DOB NOWMechanical SystemsPermit IssuedR&S ELITE CONSTRUCTION07/08/2025
DOB NOWGeneral ConstructionPermit IssuedR&S ELITE CONSTRUCTION07/07/2025
DOB NOWGeneral ConstructionPermit IssuedR&S ELITE CONSTRUCTION07/07/2025
DOB NOWMechanical SystemsPermit IssuedR&S ELITE CONSTRUCTION05/06/2025
DOB NOWFoundationPermit IssuedR&S ELITE CONSTRUCTION05/01/2025
DOB NOWGeneral ConstructionPermit IssuedR&S ELITE CONSTRUCTION11/22/2024
BIS—ISSUEDD/B/A ORINOCO CONSTRUCTION09/29/1997
BISOTISSUEDRENOVATORS ASSOCIATES ,INC.11/25/1991
1 project · most recent 07/02/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/02/2026Permit IssuedR&S ELITE CONSTRUCTIONHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM60NAM2 60,000 BTU · Condensing Unit ×4
PEFY-P08NMAU-E4 9,000 BTU · Vrf Indoor ×4
PEFY-P12NMAU-E4 13,500 BTU · Vrf Indoor ×4
PFFY-P06NRMU-E 6,700 BTU · Vrf Indoor ×4
PFFY-P12NRMU-E 13,500 BTU · Vrf Indoor ×4
MSZ-B-2 7,200 BTU · Fan Coil Indoor ×2
MSZ-GL06NA 7,200 BTU · Fan Coil Indoor ×2
PEFY-P30NMAU-E4 34,000 BTU · Vrf Indoor ×2
1 project · most recent 07/02/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/02/2026Permit IssuedH.K. MECHANICAL SVC CORPGas, Storm, Water/Sanitary
2 projects · most recent 07/06/2026
General Wiring
FiledStatusContractorScope
07/06/2026Permit IssuedRICHARD NEU—
07/09/2025Permit IssuedEIS ELECTRIC CORP DBAGeneral Wiring
1 project · most recent 07/02/2026
Steel Concrete Wood
FiledStatusContractorScope
07/02/2026Permit IssuedR&S ELITE CONSTRUCTIONSteel, Concrete, Wood
2 projects · most recent 07/07/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
07/07/2026Permit IssuedSTEEL CONSTRUCTION LLCScaffold
07/06/2026Permit IssuedSTEEL CONSTRUCTION LLCSidewalk Shed
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
08/24/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/05/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/21/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/02/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/25/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/22/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/10/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/10/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/03/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/25/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/18/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/16/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
07/02/2026Fire-Resistant Penetrations and JointsMichael Patinospecial
07/02/2026Fire-Resistance Rated ConstructionMichael Patinoprogress
06/18/2026Structural Stability – Alterations of existing buildingsMichael Patinospecial
06/18/2026MasonryMichael Patinospecial
06/18/2026Post-installed AnchorsMichael Patinospecial
06/18/2026Structural Stability – Alterations of existing buildingsMichael Patinospecial
06/18/2026Fire-Resistance Rated ConstructionMichael Patinoprogress
06/18/2026Fire-Resistant Penetrations and JointsMichael Patinospecial
06/18/2026Structural Stability – Alterations of existing buildings—special
05/02/2026Fire-Resistant Penetrations and JointsMichael Patinospecial
03/06/2026Post-installed AnchorsMichael Patinospecial
03/06/2026Structural Cold-Formed SteelMichael Patinospecial
03/06/2026Structural Stability – Alterations of existing buildingsMichael Patinospecial
03/06/2026Structural Steel - DetailsMichael Patinospecial
03/06/2026Structural Steel - High Strength BoltingMichael Patinospecial
03/06/2026Structural Steel - WeldingMichael Patinospecial
03/06/2026FinalMichael Patinoprogress
03/06/2026Footing and FoundationMichael Patinoprogress
03/06/2026Fire-Resistance Rated ConstructionMichael Patinoprogress
03/06/2026Structural Stability – Alterations of existing buildingsMichael Patinospecial
03/06/2026Post-installed AnchorsMichael Patinospecial
03/06/2026Fire-Resistant Penetrations and JointsMichael Patinospecial
03/06/2026Fire-Resistant Penetrations and JointsMichael Patinospecial
03/06/2026MasonryMichael Patinospecial
10/20/2025Structural Stability – Alterations of existing buildingsMichael Patinospecial
Latest 25 of 41.
▾Documents — 100 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
08/17/2026M01105778-P2Request digital key ↗
08/17/2026M01105778-S3Request digital key ↗
08/17/2026M01105778-S2Request digital key ↗
Showing 3 of 17 on file for this type
▸Applications & Permits13
▸DOB NOWLPC Approval/Permit13
08/17/2026M01105778-I1Open ↗
08/17/2026M01105778-S3Open ↗
08/17/2026M01105778-P6Open ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications35
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/17/2026M01105778-P2Open ↗
08/17/2026M01105778-S3Open ↗
08/17/2026M01105778-S2Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026M01105778-S1Open ↗
08/29/2026M01105778-P4Open ↗
08/29/2026M01105778-S5Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
08/29/2026M01105778-S5Open ↗
08/28/2026M01105778-P2Open ↗
08/26/2026M01105778-S4Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist8
08/17/2026M01105778-S5Open ↗
08/13/2026M01105778-I1Open ↗
08/13/2026M01105778-P2Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
08/17/2026M01105778-P1Open ↗
08/17/2026M01105778-S2Open ↗
08/17/2026M01105778-S1Open ↗
Showing 3 of 14 on file for this type
▸Approvals, Objections & Sign-offs4
▸DOB NOWLandmark Approval4
08/13/2026M01105778-P6Open ↗
08/13/2026M01105778-S3Open ↗
08/13/2026M01105778-I1Open ↗
Showing 3 of 4 on file for this type
▸Other Documents9
▸DOB NOWProperty Ownership Certification4
08/17/2026M01105778-P5Open ↗
08/17/2026M01105778-P1Open ↗
08/17/2026M01105778-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProof of Historic Building4
08/13/2026M01105778-P5Open ↗
08/13/2026M01105778-P3Open ↗
08/13/2026M01105778-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026M01105778-S3Open ↗