← Back
BuildNYC
Elevator apt, semi-fireproof without stores
Saint Nicholas (NYCHA)
2410 FREDERICK DOUGLAS BOULEVARD · BIN 1081510
💬 Discuss this project
1951Year Built
14Stories
D1Building Class
R7-2Zoning
569,515 sfGross Floor Area
650Units
LL97 Covered16 Active Violations 8 unresolved · 8 paperwork only ▸FISP: No Report Filed
Elevator apt, semi-fireproof without stores · Owner of record: NYC Housing Authority · 290,420 sf lot · 1.96 FAR built · Flood zone X
Locations of Work
StructuralElectricalMechanicalFire ProtectionEquipmentLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsNYCHA Comp Mod -st. Nicholas Houses1 filing
Site & exteriorTemporary chain link fence2 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority3608/28/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Dagher Engineering203/27/2026
Cany Architecture & Engineering102/18/2026
Curtis + Ginsberg Architects310/21/2025
Langan Engineering209/08/2025
Wexler Associates105/16/2025
Gurvinder Singh305/10/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM Zoning1403/21/2026
Danico Services603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Metropolitan ConstructionScaffold303/21/2026
Skyworx ContractingScaffold203/21/2026
Skyline P & HPlumbing203/22/2026
S. J. ElectricElectrical103/21/2026
Thompson Electrical Main ServiceElectrical103/21/2026
Polaris Electrical ConstructionElectrical103/21/2026
The Maintenance CoElectrical103/21/2026
Tri-State Electrical & Mechanical IElectrical103/22/2026
Lintech ElectricElectrical103/22/2026
Tri-State Electrical & Mechanical IElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Socotec Engineering4983105/16/2025
Building Lifecycle
All (98)Filed (12)Permit Issued (2)Signed Off (2)Facade (FISP) (14)Violation (28)Objection (10)Special Inspection (30)
05/20/2026
Special inspection requirement — Maintenance information
04/14/2026
Objection raised — Other
04/10/2026
Objection raised — Other
03/27/2026
Filed — Alteration
ON SITE SCOPE FOR DRAINAGE ASSOCIATED WITH THE REDEVELOPMENT OF BUILDINGS 10 AND 12. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01131680-S9
03/27/2026
Filed — Alteration
ON SITE SCOPE FOR DRAINAGE ASSOCIATED WITH THE REDEVELOPMENT OF BUILDINGS 10 AND 12. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01131680-S8
03/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/16/2026
Special inspection requirement — Energy Code Compliance Inspections
03/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/16/2026
Special inspection requirement — Maintenance information
03/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/13/2026
Objection resolved — Resolved
02/27/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
02/27/2026
Special inspection requirement — Tenant Protection Plan Compliance
02/27/2026
Special inspection requirement — HVAC-R and service water heating system controls
02/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/27/2026
Special inspection requirement — Energy Code Compliance Inspections
02/27/2026
Special inspection requirement — HVAC-R and service water heating equipment
02/26/2026
Objection resolved — Addressed
02/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
02/26/2026
Special inspection requirement — Mechanical Systems
02/26/2026
Special inspection requirement — Final
02/18/2026
Filed — Alteration
ON SITE SCOPE FOR DRAINAGE ASSOCIATED WITH THE REDEVELOPMENT OF BUILDINGS 10 AND 12. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01131680-S3
11/11/2025
Objection raised — Other
10/21/2025
Filed — Alteration
ON SITE SCOPE FOR DRAINAGE ASSOCIATED WITH THE REDEVELOPMENT OF BUILDINGS 10 AND 12. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01131680-S6
10/21/2025
Filed — Alteration
ON SITE SCOPE FOR DRAINAGE ASSOCIATED WITH THE REDEVELOPMENT OF BUILDINGS 10 AND 12. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01131680-S7
10/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/15/2025
Special inspection requirement — Fire-Resistance Rated Construction
10/15/2025
Special inspection requirement — Vestibules
10/15/2025
Special inspection requirement — Lighting controls
10/15/2025
Special inspection requirement — Energy Code Compliance Inspections
10/15/2025
Special inspection requirement — Interior lighting power
10/15/2025
Special inspection requirement — Exterior lighting power
10/15/2025
Special inspection requirement — Insulation placement and R values
10/15/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
10/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/14/2025
Special inspection requirement — Final
10/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/14/2025
Special inspection requirement — Final
09/08/2025
Filed — Alteration
ON SITE SCOPE FOR DRAINAGE ASSOCIATED WITH THE REDEVELOPMENT OF BUILDINGS 10 AND 12. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01131680-S5
09/08/2025
Filed — Alteration
ON SITE SCOPE FOR DRAINAGE ASSOCIATED WITH THE REDEVELOPMENT OF BUILDINGS 10 AND 12. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01131680-S4
07/17/2025
Violation issued (ECB, open)
Local Law
05/21/2025
Objection resolved — Addressed
05/21/2025
Objection resolved — Addressed
05/20/2025
Objection raised — Admin
05/20/2025
Objection raised — Other
05/20/2025
Objection raised — Admin
05/16/2025
Filed — Alteration
ON SITE SCOPE FOR DRAINAGE ASSOCIATED WITH THE REDEVELOPMENT OF BUILDINGS 10 AND 12. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01131680-I1
05/16/2025
Filed — Alteration
ON SITE SCOPE FOR DRAINAGE ASSOCIATED WITH THE REDEVELOPMENT OF BUILDINGS 10 AND 12. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01131680-S1
06/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/19/2019
Signed off — Alteration
M00152526-I1
08/19/2019
Signed off — Alteration
M00152491-I1
05/10/2019
Filed — Alteration
M00152491-P1
04/17/2019
Permit issued — Construction Fence
M00152526-I1-FN
04/16/2019
Permit issued — Sidewalk Shed
M00152491-I1-SH
04/12/2019
Filed — Alteration
M00152526-I1
04/12/2019
Filed — Alteration
M00152491-I1
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 98 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offMetropolitan Construction04/17/2019
DOB NOWSidewalk ShedSigned-offSkyworx Contracting04/16/2019
BISOTISSUEDMetropolitan Construction07/03/2020
BISOTISSUEDMetropolitan Construction05/14/2019
BISEQISSUEDAkro General Contracting12/05/2014
BISOTISSUEDZoria Housing11/03/2014
BISEQISSUEDZoria Housing09/26/2014
BISOTISSUEDZoria Housing09/23/2014
BISEQISSUEDVikrant Contracting & Builder08/11/2014
BISEQISSUEDAkro General Contracting04/01/2014
BISEQISSUEDMetropolitan Enterprises05/10/2013
BISEQISSUEDMetropolitan Enterprises05/06/2013
BISEQISSUEDAkro General Contracting05/03/2013
BISEQISSUEDMetropolitan Enterprises10/15/2012
BISEQISSUEDMetropolitan Enterprises05/09/2012
BIS—ISSUEDNYCHA11/22/2011
BISEQISSUEDMetropolitan Enterprises05/25/2011
BISEQISSUEDMetropolitan Enterprises04/19/2011
BISEQISSUEDAMC United11/18/2009
BISEQISSUEDAMC United04/20/2009
BISOTISSUEDNap Construction Co12/19/2001
BISPLISSUEDCape Plumbing11/05/2001
BISOTISSUEDNap Construction Co09/19/2000
BISPLISSUEDCape Plumbing05/31/2000
BISEQISSUEDPhoenix Construction05/09/2000
BISOTISSUEDNap Construction Co04/19/2000
BISPLISSUEDOlympia Mechanical10/26/1999
1 project · most recent 03/27/2026
Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/27/2026——Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Heat / Cool
Ephoca AWP10N3H2 10,860 BTU · Heat Pump Outdoor ×438
AWP10R3H2 8,400 BTU · Heat Pump Outdoor ×4
Heating
Lg ARUM456BTE5 484,000 BTU · Vrf Outdoor ×2
Ventilation
Greenheck ERV-20-15L 840 CFM · Erv ×1
1 project · most recent 03/27/2026
FiledStatusContractorScope
03/27/2026——9 heads
1 project · most recent 03/27/2026
Gas Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
03/27/2026——Gas, Plumbing-Sprinkler, Storm, Water/Sanitary
8 projects · most recent 05/12/2026
General Wiring
FiledStatusContractorScope
05/12/2026CompleteGalaxy Electric—
01/27/2026Permit IssuedPolaris Electrical ConstructionGeneral Wiring
09/12/2025Permit IssuedS. J. ElectricGeneral Wiring
06/15/2023CompleteTri-State Electrical & Mechanical IGeneral Wiring
07/29/2020Permit IssuedN.Y.C. Housing AuthorityGeneral Wiring
02/05/2020Permit IssuedLintech ElectricGeneral Wiring
08/21/2019Permit IssuedEia ElectricGeneral Wiring
03/19/2019CompleteLintech Electric—
1 project · most recent 03/27/2026
Concrete Masonry
FiledStatusContractorScope
03/27/2026——Concrete, Masonry
▾Special Inspection Requirements (DOB NOW) — 72
DateRequirementInspectorRole
05/20/2026Maintenance information—energy_progress
03/16/2026Maintenance information—energy_progress
03/16/2026HVAC-R and service water heating system controls—energy_progress
03/16/2026HVAC-R and service water heating equipment—energy_progress
03/16/2026HVAC-R and service water piping design and insulation—energy_progress
03/16/2026Fire-Resistant Penetrations and Joints—special
03/16/2026Energy Code Compliance Inspections—progress
02/27/2026Energy Code Compliance Inspections—progress
02/27/2026HVAC-R and service water heating equipment—energy_progress
02/27/2026HVAC-R and service water piping design and insulation—energy_progress
02/27/2026Tenant Protection Plan Compliance—special
02/27/2026HVAC-R and service water heating system controls—energy_progress
02/27/2026Fire-Resistant Penetrations and Joints—special
02/26/2026Final—progress
02/26/2026Mechanical Systems—special
02/26/2026Tenant Protection Plan Compliance—special
10/15/2025Insulation placement and R values—energy_progress
10/15/2025Exterior lighting power—energy_progress
10/15/2025Interior lighting power—energy_progress
10/15/2025Fire-Resistant Penetrations and Joints—special
10/15/2025Lighting controls—energy_progress
10/15/2025Energy Code Compliance Inspections—progress
10/15/2025Vestibules—energy_progress
10/15/2025Fire-Resistance Rated Construction—progress
10/15/2025Fenestration and door U-factor and product ratings—energy_progress
Latest 25 of 72.
▾Documents — 216 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch9
08/21/2026M01131680-S8Request digital key ↗
08/21/2026M01131680-S6Request digital key ↗
08/21/2026M01131680-S1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00152491-I1Request digital key ↗
08/15/2026M00152491-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/05/2026M00152526-I1Request digital key ↗
▸Applications & Permits43
▸BISPLAN / WORK APPROVAL APPLICATION25
04/11/2023120902014Open ↗
03/17/2023121946038Open ↗
03/17/2023102889705Open ↗
Showing 3 of 25 on file for this type
▸BISWORK PERMIT APPLICATION16
05/15/2019140557617Open ↗
12/08/2014121606431Open ↗
09/23/2014140257763Open ↗
Showing 3 of 16 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
01/25/2012120902014Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
12/12/2016121606431Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026M01131680-S1Open ↗
08/13/2026M01131680-S7Open ↗
▸Seals & Professional Certifications43
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/21/2026M01131680-S9Open ↗
08/21/2026M01131680-S8Open ↗
08/21/2026M01131680-S7Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
09/23/2014140257763Open ↗
08/11/2014140238810Open ↗
08/05/2014140236395Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
04/03/2014121946038Open ↗
05/09/2013121606431Open ↗
05/17/2011120691572Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
07/01/2019123823871Open ↗
06/28/2016140236395Open ↗
12/14/2015140238810Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
05/09/2013121606431Open ↗
05/17/2011120691572Open ↗
04/19/2011120662979Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
09/23/2014140257763Open ↗
08/11/2014140238810Open ↗
08/05/2014140236395Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
09/23/2014140257763Open ↗
08/11/2014140238810Open ↗
08/05/2014140236395Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/23/2026M01131680-I1Open ↗
08/25/2026M00152491-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/04/2016140557617Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/23/2026M01131680-I1Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/01/2019123823871Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES2
03/05/2019140557617Open ↗
07/01/2019123823871Open ↗
▸Environmental & Asbestos9
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
04/03/2014121946038Open ↗
05/09/2013121606431Open ↗
05/17/2011120691572Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
06/28/2016140236395Open ↗
08/05/2014140236395Open ↗
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU0652MN191
08/04/2020140557617Open ↗
▸BISDEP FORM V5 - ASBESTOS VARIANCE1
05/15/2019140557617Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
08/04/2020140557617Open ↗
03/28/2018140557617Open ↗
03/05/2018140557617Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
08/02/2019123823871Open ↗
06/28/2016140236395Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/05/2014140236395Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/04/2020140557617Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
08/11/2014140238810Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY10
08/04/2020140557617Open ↗
12/12/2018140557617Open ↗
03/28/2018140557617Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSOIL REPORT1
08/13/2026M01131680-I1Open ↗
▸Approvals, Objections & Sign-offs38
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter13
08/13/2026M01131680-S5Open ↗
08/13/2026M01131680-S6Open ↗
08/13/2026M01131680-S2Open ↗
Showing 3 of 13 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
04/17/2023120015205Open ↗
03/24/2023121946038Open ↗
08/04/2020140557617Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
06/28/2016140236395Open ↗
12/14/2015140238810Open ↗
12/14/2015140257763Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
05/09/2013121606431Open ↗
11/30/2011120902014Open ↗
05/17/2011120691572Open ↗
Showing 3 of 5 on file for this type
▸BISSHED LETTER3
12/08/2014121606431Open ↗
05/11/2012120662979Open ↗
06/02/2011120662979Open ↗
▸BISSUPERSEDING LETTER1
12/08/2014121606431Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
11/25/2011120902014Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT6
08/04/2020140557617Open ↗
07/01/2019123823871Open ↗
10/27/2017140557617Open ↗
Showing 3 of 6 on file for this type
▸BISDEPT OF FINANCE VERIFICATION3
03/17/2023121946038Open ↗
03/17/2023102889705Open ↗
03/17/2023140033149Open ↗
▸Filing & Intake Forms23
▸BISEFILING COVER SHEET9
07/02/2019123689847Open ↗
07/02/2019123689847Open ↗
07/02/2019123689847Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION8
06/05/2020140557617Open ↗
03/05/2019140557617Open ↗
12/12/2018140557617Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
10/04/2016140557617Open ↗
09/23/2014140257763Open ↗
08/11/2014140238810Open ↗
Showing 3 of 6 on file for this type
▸Other Documents13
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
07/01/2019123823871Open ↗
04/03/2014121946038Open ↗
10/15/2012140033149Open ↗
Showing 3 of 5 on file for this type
▸BISPLOT DIAGRAM2
12/10/2015120902014Open ↗
11/25/2011120902014Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026M01131680-S7Open ↗
08/13/2026M01131680-S1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026M01131680-S7Open ↗
08/13/2026M01131680-S1Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
08/04/2020140557617Open ↗
▸DOB NOWPlot Diagram1
08/13/2026M01131680-S1Open ↗