← Back
Over six families without stores
2414 CAMBRELENG AVENUE
BRONX · Belmont · BIN 2129737
💬 Discuss this project
2022Year Built
—Stories
C1Building Class
R6Zoning
7,802 sfGross Floor Area
13Units
Rent Stabilized0 Open Violations
Over six families without stores · Owner of record: 2414-2416 CAMBRELENG LLC · 4,050 sf lot · 1.93 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire Protection
Roof17p · 2 filings · 20 docs
Bulkhead1p · 1 filing · 2 docs
Floor 416p · 2 filings · 20 docs
Floor 315p · 1 filing · 20 docs
Floor 216p · 2 filings · 20 docs
Floor 117p · 2 filings · 20 docs
Cellar16p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RELIABLE ENTERPRISES603/22/2026
2414-2416 CAMBRELENG1003/22/2026
NEW LINE CONSTRUCTION603/22/2026
J&H ELECTRICAL CONTRACTING INC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/22/2022$725K—2414-16 CAMBRELENG LLC → 2414-2416 CAMBRELENG LLC$93/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NODE ARCHITECTURE,ENGINEERING, CONS1509/17/2024
ENTHINK ENGINEERS LLC102/27/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NODE ENGINEERING CONSULTING2203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW LINE CONSTRUCTION LLCGeneral Contractor2107/08/2026
RELIABLE ENTERPRISES INCGeneral Contractor303/21/2026
J&H ELECTRICAL CONT INCElectrical103/22/2026
RICHARD NEUElectrical103/22/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
HORBRIDGE PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NODE ARCHITECTURE,ENGINEE67991009/17/2024
INTERNATIONAL GEOTEHCNICA1795706/20/2024
PINTO ENGINEERING CONSULT9110111/10/2022
Building Lifecycle
All (150)Filed (16)Permit Issued (17)Signed Off (10)Violation (13)Inspection (10)Objection (54)Special Inspection (30)
05/11/2026
Violation issued (HPD, closed)
A
11/17/2025
Violation issued (HPD, closed)
I
06/16/2025
Violation issued (HPD, closed)
A
10/03/2024
Special inspection requirement — Interior lighting power
Radomir Delic
10/03/2024
Special inspection requirement — Exterior lighting power
Radomir Delic
10/03/2024
Special inspection requirement — Fenestration areas
Radomir Delic
10/03/2024
Special inspection requirement — Lighting in dwelling units
Radomir Delic
10/03/2024
Special inspection requirement — Air barrier — testing
Radomir Delic
10/03/2024
Special inspection requirement — Fenestration air leakage
Radomir Delic
10/03/2024
Special inspection requirement — Maintenance information
Radomir Delic
10/03/2024
Special inspection requirement — Insulation placement and R values
Radomir Delic
10/03/2024
Special inspection requirement — Protection of exposed foundation insulation
Radomir Delic
10/03/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Radomir Delic
10/03/2024
Special inspection requirement — Air barrier - visual inspection
Radomir Delic
10/03/2024
Special inspection requirement — Metering
Radomir Delic
10/03/2024
Special inspection requirement — Lighting controls
Radomir Delic
10/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Radomir Delic
10/03/2024
Special inspection requirement — Fire-Resistance Rated Construction
Radomir Delic
10/03/2024
Special inspection requirement — Energy Code Compliance Inspections
Radomir Delic
09/26/2024
Objection resolved — Addressed
09/24/2024
Objection raised — Other
09/17/2024
Filed — New Building
New sprinkler system installation all-in conjunction with NB # X00721483-I1.
X00721483-P4
09/16/2024
Special inspection requirement — Fire-Resistance Rated Construction
Radomir Delic
09/16/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Radomir Delic
09/16/2024
Special inspection requirement — Metering
Radomir Delic
09/16/2024
Special inspection requirement — Energy Code Compliance Inspections
Radomir Delic
09/16/2024
Special inspection requirement — Exterior lighting power
Radomir Delic
09/16/2024
Special inspection requirement — Fenestration air leakage
Radomir Delic
09/16/2024
Special inspection requirement — Air barrier - visual inspection
Radomir Delic
09/16/2024
Special inspection requirement — Protection of exposed foundation insulation
Radomir Delic
09/16/2024
Special inspection requirement — Air barrier — testing
Radomir Delic
09/16/2024
Special inspection requirement — Maintenance information
Radomir Delic
09/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Radomir Delic
09/16/2024
Special inspection requirement — Fenestration areas
Radomir Delic
09/16/2024
Special inspection requirement — Interior lighting power
Radomir Delic
09/16/2024
Special inspection requirement — Lighting in dwelling units
Radomir Delic
06/24/2024
Signed off — New Building
New sprinkler system installation all-in conjunction with NB # X00721483-I1.
X00721483-S3
06/20/2024
Filed — New Building
New sprinkler system installation all-in conjunction with NB # X00721483-I1.
X00721483-P3
06/11/2024
Filed — New Building
New sprinkler system installation all-in conjunction with NB # X00721483-I1.
X00721483-P2
05/02/2024
Signed off — New Building
New sprinkler system installation all-in conjunction with NB # X00721483-I1.
X00721483-S5
05/02/2024
Signed off — New Building
New sprinkler system installation all-in conjunction with NB # X00721483-I1.
X00721483-S4
04/29/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/16/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/07/2024
Signed off — Alteration
Structural work in conjunction with NB application #X00721483-I1
X00721464-I1
02/24/2024
Signed off — New Building
New sprinkler system installation all-in conjunction with NB # X00721483-I1.
X00721483-S2
02/23/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
02/20/2024
Signed off — New Building
New sprinkler system installation all-in conjunction with NB # X00721483-I1.
X00721483-S1
02/15/2024
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
01/04/2024
Violation issued (ECB, closed)
Construction
12/27/2023
Signed off — Alteration
X00774637-I1
11/13/2023
Permit issued — Structural
X00721464-I1-ST
11/13/2023
Permit issued — Construction Fence
X00721483-S1-FN
11/13/2023
Permit issued — General Construction
X00721483-I1-GC
11/13/2023
Permit issued — Mechanical Systems
X00721483-S3-MS
10/04/2023
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00835436-I1
09/25/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/21/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/14/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/01/2023
Permit issued — Sprinklers
X00721483-S5-EW-SP
08/30/2023
Permit issued — Mechanical Systems
X00721483-S3-MS
Latest 60 of 150 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offNEW LINE CONSTRUCTION LLC11/13/2023
DOB NOWConstruction FenceSigned-offNEW LINE CONSTRUCTION LLC11/13/2023
DOB NOWGeneral ConstructionPermit IssuedNEW LINE CONSTRUCTION LLC11/13/2023
DOB NOWMechanical SystemsSigned-offNEW LINE CONSTRUCTION LLC11/13/2023
DOB NOWSprinklersSigned-offA M B MECHANICAL INC09/01/2023
DOB NOWMechanical SystemsSigned-offNEW LINE CONSTRUCTION LLC08/30/2023
DOB NOWCurb CutSigned-offNEW LINE CONSTRUCTION LLC08/25/2023
DOB NOWProtection and Mechanical MethodsSigned-offNEW LINE CONSTRUCTION LLC08/25/2023
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC02/27/2023
DOB NOWGeneral ConstructionPermit IssuedNEW LINE CONSTRUCTION LLC01/24/2023
DOB NOWStructuralSigned-offNEW LINE CONSTRUCTION LLC12/10/2022
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT11/17/2022
DOB NOWConstruction FenceSigned-offNEW LINE CONSTRUCTION LLC11/02/2022
DOB NOWFoundationSigned-offNEW LINE CONSTRUCTION LLC11/02/2022
DOB NOWSupport of ExcavationSigned-offNEW LINE CONSTRUCTION LLC05/23/2022
DOB NOWEarth WorkSigned-offNEW LINE CONSTRUCTION LLC05/20/2022
DOB NOWConstruction FenceSigned-offNEW LINE CONSTRUCTION LLC05/11/2022
1 project · most recent 09/17/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/17/2024Permit IssuedNEW LINE CONSTRUCTION LLCHeating and Air Conditioning Systems
Heat / Cool
Friedrich PDH093SG-A 9,000 BTU · Ptac ×34
1 project · most recent 09/17/2024
Sprinkler System
FiledStatusContractorScope
09/17/2024Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 09/17/2024
Storm Water/Sanitary
FiledStatusContractorScope
09/17/2024Signed-offHORBRIDGE PLUMBING & HEATStorm, Water/Sanitary
2 projects · most recent 10/30/2024
General Wiring
FiledStatusContractorScope
10/30/2024CompleteJ&H ELECTRICAL CONT INCGeneral Wiring
03/02/2023CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
04/29/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/16/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/23/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
02/15/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
09/25/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/21/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/14/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/24/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/24/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/24/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 83
DateRequirementInspectorRole
10/03/2024Energy Code Compliance InspectionsRadomir Delicprogress
10/03/2024Exterior lighting powerRadomir Delicenergy_progress
10/03/2024Fenestration air leakageRadomir Delicenergy_progress
10/03/2024Lighting controlsRadomir Delicenergy_progress
10/03/2024Air barrier — testing Radomir Delicenergy_progress
10/03/2024Maintenance informationRadomir Delicenergy_progress
10/03/2024Insulation placement and R valuesRadomir Delicenergy_progress
10/03/2024Fenestration areasRadomir Delicenergy_progress
10/03/2024Protection of exposed foundation insulationRadomir Delicenergy_progress
10/03/2024Fenestration and door U-factor and product ratingsRadomir Delicenergy_progress
10/03/2024Lighting in dwelling unitsRadomir Delicenergy_progress
10/03/2024Interior lighting powerRadomir Delicenergy_progress
10/03/2024Air barrier - visual inspectionRadomir Delicenergy_progress
10/03/2024MeteringRadomir Delicenergy_progress
10/03/2024Fire-Resistant Penetrations and JointsRadomir Delicspecial
10/03/2024Fire-Resistance Rated ConstructionRadomir Delicprogress
09/16/2024Exterior lighting powerRadomir Delicenergy_progress
09/16/2024Fenestration air leakageRadomir Delicenergy_progress
09/16/2024Lighting in dwelling unitsRadomir Delicenergy_progress
09/16/2024Insulation placement and R valuesRadomir Delicenergy_progress
09/16/2024Lighting controlsRadomir Delicenergy_progress
09/16/2024Fire-Resistance Rated ConstructionRadomir Delicprogress
09/16/2024MeteringRadomir Delicenergy_progress
09/16/2024Maintenance informationRadomir Delicenergy_progress
09/16/2024Fenestration areasRadomir Delicenergy_progress
Latest 25 of 83.
▾Documents — 154 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/24/2026X00721454-I1Request digital key ↗
08/24/2026X00720858-P1Request digital key ↗
08/24/2026X00720858-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits3
▸BISBPP-5 - Authorization to the Department of Transportation2
10/20/2023240348708Open ↗
07/25/2023240348708Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
06/09/2023240348708Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026X00721483-I1Open ↗
08/13/2026X00721483-P4Open ↗
08/13/2026X00721483-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026X00721483-P2Open ↗
08/13/2026X00721483-I1Open ↗
08/13/2026X00721483-P4Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00721483-I1Open ↗
▸Seals & Professional Certifications99
▸DOB NOWProgress Inspector Seal & Signature68
09/19/2026X00721483-S4Open ↗
09/19/2026X00721483-S4Open ↗
09/19/2026X00721483-S4Open ↗
Showing 3 of 68 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/24/2026X00721454-I1Open ↗
08/24/2026X00720858-P1Open ↗
08/24/2026X00720858-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/19/2026X00721483-S4Open ↗
09/19/2026X00721483-S4Open ↗
08/29/2026X00721483-P2Open ↗
Showing 3 of 14 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
06/09/2023240348708Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026X00721483-P2Open ↗
08/13/2026X00721483-I1Open ↗
08/13/2026X00721483-P4Open ↗
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist3
08/13/2026X00721483-P4Open ↗
08/13/2026X00721483-P2Open ↗
08/13/2026X00721483-I1Open ↗
▸BISBPP: STREET TREES SITE PLAN1
06/09/2023240348708Open ↗
▸BISSTREET TREE CHECKLIST1
06/09/2023240348708Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00721483-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00721483-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00721483-I1Open ↗
▸Energy Compliance3
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026X00721483-S3Open ↗
08/13/2026X00721483-S4Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00721483-I1Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
06/09/2023240348708Open ↗
▸BISADDITIONAL INFORMATION1
07/25/2023240348708Open ↗
▸Other Documents13
▸DOB NOWSite Survey: Initial3
08/13/2026X00721483-P2Open ↗
08/13/2026X00721483-I1Open ↗
08/13/2026X00721483-P4Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026X00721483-P2Open ↗
08/13/2026X00721483-P4Open ↗
08/13/2026X00721483-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/22/2026X00721483-I1Open ↗
08/22/2026X00721483-P2Open ↗
08/22/2026X00721483-P4Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026X00721454-I1Open ↗
08/13/2026X00720858-I1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
06/09/2023240348708Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00721483-I1Open ↗