1960Year Built
2Stories
A1Building Class
R1-2Zoning
2,036 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,000 sf lot · 0.51 FAR built · Flood zone X
Locations of Work
Electrical
Roof1p · 1 filing · 8 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/02/2022$1.2M—— → —$589/sf building
06/28/2019$1.1M—— → —$521/sf building
11/02/2016$990K—Private party → Private party$486/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC112/06/2023
FLUSHING ENGINEERING SERVICE PC101/07/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
M2 DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ST SAFETY CONS. INCGeneral Contractor303/21/2026
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
SUNRUN SOLAR ELECTL CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272112/06/2023
FLUSHING ENGINEERING SERV4373101/07/2022
Building Lifecycle
All (15)Filed (2)Permit Issued (2)Signed Off (1)Inspection (1)Special Inspection (9)
12/15/2023
Permit issued — Solar
Q00966274-I1-SL
12/06/2023
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00966274-I1
11/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
11/21/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
11/21/2023
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
11/21/2023
Special inspection requirement — Final
Walid Abdulla
11/21/2023
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
02/11/2022
Signed off — Alteration
ERECTED 4' HT MCU RETAINNING WALL ON THE LEFT EAST SIDE CORNER OF PROPERTY, REMOVE CONCRETE PAD FROM EAST SIDE CORNER & CUT DOWN 6' HT PVC FENCE TO 4' HT FROM EASE SIDE PROPERTY LINE TO ADDRESS COMPLAINT #4860673.NO CHANGE IN USE, OCCUPANCY OR EGR
Q00656023-I1
02/10/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/19/2022
Permit issued — General Construction
Q00656023-I1-GC-CX
01/07/2022
Filed — Alteration
ERECTED 4' HT MCU RETAINNING WALL ON THE LEFT EAST SIDE CORNER OF PROPERTY, REMOVE CONCRETE PAD FROM EAST SIDE CORNER & CUT DOWN 6' HT PVC FENCE TO 4' HT FROM EASE SIDE PROPERTY LINE TO ADDRESS COMPLAINT #4860673.NO CHANGE IN USE, OCCUPANCY OR EGR
Q00656023-I1
01/06/2022
Special inspection requirement — Concrete - Cast-In-Place
KY FU
01/06/2022
Special inspection requirement — Masonry
KY FU
01/03/2022
Special inspection requirement — Final
KY FU
01/03/2022
Special inspection requirement — Footing and Foundation
KY FU
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSUNRUN INSTALLATION SVC12/15/2023
DOB NOWGeneral ConstructionSigned-offST SAFETY CONS. INC01/19/2022
1 project · most recent 12/06/2023
FiledStatusContractorScope
12/06/2023Permit IssuedSUNRUN SOLAR ELECTL CORP—
1 project · most recent 12/06/2023
FiledStatusContractorScope
12/06/2023Permit IssuedSUNRUN INSTALLATION SVC19 panels, 7.69 kw, 401.6 roof_area_sqft
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
02/10/2022Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
11/21/2023Fire-Resistant Penetrations and JointsWalid Abdullaspecial
11/21/2023Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
11/21/2023Energy Code Compliance InspectionsWalid Abdullaprogress
11/21/2023FinalWalid Abdullaprogress
11/21/2023Air barrier - visual inspectionWalid Abdullaenergy_progress
01/06/2022Concrete - Cast-In-PlaceKY FUspecial
01/06/2022MasonryKY FUspecial
01/03/2022FinalKY FUprogress
01/03/2022Footing and FoundationKY FUprogress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/26/2026Q00656023-I1Request digital key ↗
08/23/2026Q00966274-I1Request digital key ↗
▸Seals & Professional Certifications11
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026Q00656023-I1Open ↗
09/01/2026Q00656023-I1Open ↗
08/31/2026Q00966274-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026Q00656023-I1Open ↗
09/01/2026Q00656023-I1Open ↗
08/31/2026Q00966274-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/26/2026Q00656023-I1Open ↗
08/13/2026Q00966274-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q00966274-I1Open ↗