← Back
Two family converted from one family
242 7 STREET
BROOKLYN · BIN 3021804
💬 Discuss this project
1901Year Built
2Stories
B3Building Class
R6BZoning
1,575 sfGross Floor Area
2Units
Two family converted from one family · 1,558 sf lot · 1.01 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingGeneral
Roof2p · 1 filing · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 31p · 1 filing · 20 docs
Floor 216p · 3 filings · 20 docs
Floor 116p · 1 filing · 20 docs
Cellar16p · 1 filing · 20 docs
Sub-Basement13p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/28/2023$1.4M—ZOEY PROPERTIES LLC → Private party$889/sf building
10/26/2022$925K—Private party → ZOEY PROPERTIES LLC$587/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A.B.A STUDIO D.P.C.609/08/2025
STRUCTURAL ENGINEERING INTEGRATED304/07/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ASA BARAK STUDIO303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALPHA BUILDS INCGeneral Contractor207/08/2026
AUTHENTIC PLBG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JIAN ENGINEERING PLLC7397809/08/2025
Building Lifecycle
All (114)Filed (8)Permit Issued (3)Signed Off (2)Inspection (5)Objection (66)Special Inspection (30)
07/06/2026
Signed off — Alteration
ALT OF 2-FAMILY BUILDING:CELLAR: UNDERGROUND WORK (SUMP PUMP & FRENCH DRAIN)BSMNT: 1 KITCHEN & BATHROOM RELOCATION , NEW W/D & DW1ST FL: 1 NEW KITCHEN,2ND FL: 1 KITCHEN REMOVAL.THIS IS A GAS BUILDING. GAS HWH TO BE REPLACED. GAS&WATER METERS TO REMAIN
B01073905-S1
06/29/2026
Signed off — Alteration
horizontal enlargement of a 2-family dwelling. structural and foundation work only. GC work approved under job B01073905-I1
B01174022-I1
12/03/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
12/03/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/24/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/08/2025
Filed — Alteration
ALT OF 2-FAMILY BUILDING:CELLAR: UNDERGROUND WORK (SUMP PUMP & FRENCH DRAIN)BSMNT: 1 KITCHEN & BATHROOM RELOCATION , NEW W/D & DW1ST FL: 1 NEW KITCHEN,2ND FL: 1 KITCHEN REMOVAL.THIS IS A GAS BUILDING. GAS HWH TO BE REPLACED. GAS&WATER METERS TO REMAIN
B01073905-P3
09/05/2025
Special inspection requirement — Energy Code Compliance Inspections
JIAN DENG
09/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
09/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JIAN DENG
09/03/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/18/2025
Filed — Alteration
ALT OF 2-FAMILY BUILDING:CELLAR: UNDERGROUND WORK (SUMP PUMP & FRENCH DRAIN)BSMNT: 1 KITCHEN & BATHROOM RELOCATION , NEW W/D & DW1ST FL: 1 NEW KITCHEN,2ND FL: 1 KITCHEN REMOVAL.THIS IS A GAS BUILDING. GAS HWH TO BE REPLACED. GAS&WATER METERS TO REMAIN
B01073905-P2
07/30/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/15/2025
Objection raised — Scope
07/15/2025
Objection resolved — Addressed
07/08/2025
Filed — Alteration
ALT OF 2-FAMILY BUILDING:CELLAR: UNDERGROUND WORK (SUMP PUMP & FRENCH DRAIN)BSMNT: 1 KITCHEN & BATHROOM RELOCATION , NEW W/D & DW1ST FL: 1 NEW KITCHEN,2ND FL: 1 KITCHEN REMOVAL.THIS IS A GAS BUILDING. GAS HWH TO BE REPLACED. GAS&WATER METERS TO REMAIN
B01073905-P1
06/27/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JIAN DENG
06/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
06/27/2025
Special inspection requirement — Energy Code Compliance Inspections
JIAN DENG
06/03/2025
Permit issued — Plumbing
B01073905-S1-PL
05/29/2025
Permit issued — Structural
B01174022-I1-GC-CX
05/13/2025
Special inspection requirement — Post-installed Anchors
JIAN DENG
05/13/2025
Special inspection requirement — Footing and Foundation
JIAN DENG
05/13/2025
Special inspection requirement — Subgrade Inspections
JIAN DENG
05/13/2025
Special inspection requirement — Structural Steel - Details
JIAN DENG
05/13/2025
Special inspection requirement — Structural Cold-Formed Steel
JIAN DENG
05/13/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JIAN DENG
05/13/2025
Special inspection requirement — Structural Steel - Welding
JIAN DENG
05/13/2025
Special inspection requirement — Masonry
JIAN DENG
05/13/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
05/13/2025
Special inspection requirement — Final
JIAN DENG
05/13/2025
Special inspection requirement — Structural Steel - High Strength Bolting
JIAN DENG
05/13/2025
Special inspection requirement — Concrete - Cast-In-Place
JIAN DENG
04/07/2025
Filed — Alteration
horizontal enlargement of a 2-family dwelling. structural and foundation work only. GC work approved under job B01073905-I1
B01174022-P1
04/07/2025
Special inspection requirement — Structural Cold-Formed Steel
JIAN DENG
04/07/2025
Special inspection requirement — Post-installed Anchors
JIAN DENG
04/07/2025
Special inspection requirement — Masonry
JIAN DENG
04/07/2025
Special inspection requirement — Concrete - Cast-In-Place
JIAN DENG
04/07/2025
Special inspection requirement — Footing and Foundation
JIAN DENG
04/07/2025
Special inspection requirement — Subgrade Inspections
JIAN DENG
04/07/2025
Special inspection requirement — Structural Steel - Welding
JIAN DENG
04/07/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
04/07/2025
Special inspection requirement — Structural Steel - Details
JIAN DENG
04/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JIAN DENG
04/07/2025
Special inspection requirement — Structural Steel - High Strength Bolting
JIAN DENG
04/07/2025
Special inspection requirement — Final
JIAN DENG
03/27/2025
Objection resolved — Addressed
03/27/2025
Objection resolved — Addressed
03/25/2025
Objection raised — Plumbing
03/25/2025
Objection raised — Structural
03/18/2025
Objection resolved — Addressed
03/18/2025
Objection resolved — Addressed
03/18/2025
Objection resolved — Addressed
03/18/2025
Objection resolved — Addressed
03/18/2025
Objection resolved — Addressed
03/18/2025
Objection resolved — Addressed
03/18/2025
Objection resolved — Addressed
03/18/2025
Objection resolved — Addressed
03/18/2025
Objection resolved — Addressed
03/16/2025
Objection resolved — Addressed
03/12/2025
Objection resolved — Addressed
Latest 60 of 114 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAUTHENTIC PLBG CORP06/03/2025
DOB NOWStructuralSigned-offALPHA BUILDS INC05/29/2025
DOB NOWGeneral ConstructionPermit IssuedALPHA BUILDS INC12/05/2024
1 project · most recent 09/08/2025
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/08/2025Permit IssuedALPHA BUILDS INCAir Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric MSZ-GS12NA-U1 14,400 BTU · Fan Coil Indoor ×3
MSZ-GS06NA-U1 7,200 BTU · Fan Coil Indoor ×2
MSZ-GS09NA-U1 10,900 BTU · Fan Coil Indoor ×2
MSZ-GS15NA-U1 18,000 BTU · Fan Coil Indoor ×1
MXZ-3C30NA3-U1 36,000 BTU · Condensing Unit ×1
MXZ-5C42NA4-U1 53,600 BTU · Condensing Unit ×1
Ventilation
Fisher & Paykel HC30PCW1 600 CFM · Kitchen Exhaust ×2
1 project · most recent 09/08/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/08/2025Signed-offAUTHENTIC PLBG CORPGas, Storm, Water/Sanitary
2 projects · most recent 05/29/2025
General Wiring
FiledStatusContractorScope
05/29/2025Permit IssuedKWONG MING ELECTRIC INCGeneral Wiring
06/02/2023Permit IssuedELMAC ELECTRIC INC.4 meters, 2 new_meters
2 projects · most recent 09/08/2025
Steel Concrete Masonry
FiledStatusContractorScope
09/08/2025Signed-offAUTHENTIC PLBG CORPSteel, Concrete, Masonry
04/07/2025Signed-offALPHA BUILDS INCSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/03/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
12/03/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/03/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/30/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 61
DateRequirementInspectorRole
09/05/2025Energy Code Compliance InspectionsJIAN DENGprogress
09/05/2025HVAC-R and service water piping design and insulationJIAN DENGenergy_progress
09/05/2025Fire-Resistant Penetrations and JointsJIAN DENGspecial
06/27/2025Fire-Resistant Penetrations and JointsJIAN DENGspecial
06/27/2025HVAC-R and service water piping design and insulationJIAN DENGenergy_progress
06/27/2025Energy Code Compliance InspectionsJIAN DENGprogress
05/13/2025FinalJIAN DENGprogress
05/13/2025Footing and FoundationJIAN DENGprogress
05/13/2025Structural Steel - WeldingJIAN DENGspecial
05/13/2025Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
05/13/2025MasonryJIAN DENGspecial
05/13/2025Concrete - Cast-In-PlaceJIAN DENGspecial
05/13/2025Structural Steel - High Strength BoltingJIAN DENGspecial
05/13/2025Structural Stability – Alterations of existing buildingsJIAN DENGspecial
05/13/2025Structural Cold-Formed SteelJIAN DENGspecial
05/13/2025Structural Steel - DetailsJIAN DENGspecial
05/13/2025Post-installed AnchorsJIAN DENGspecial
05/13/2025Subgrade InspectionsJIAN DENGspecial
04/07/2025Structural Cold-Formed SteelJIAN DENGspecial
04/07/2025Structural Steel - DetailsJIAN DENGspecial
04/07/2025Structural Steel - High Strength BoltingJIAN DENGspecial
04/07/2025Structural Steel - WeldingJIAN DENGspecial
04/07/2025Subgrade InspectionsJIAN DENGspecial
04/07/2025Subsurface Investigations (Borings/Test Pits)—special
04/07/2025FinalJIAN DENGprogress
Latest 25 of 61.
▾Documents — 72 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/22/2026B01174022-I1Request digital key ↗
08/22/2026B01174022-P1Request digital key ↗
08/21/2026B01073905-S2Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026B01174022-I1Open ↗
08/13/2026B01174022-P1Open ↗
08/13/2026B01073905-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026B01174022-I1Open ↗
08/13/2026B01073905-I1Open ↗
08/13/2026B01174022-P1Open ↗
▸Seals & Professional Certifications35
▸DOB NOWProgress Inspector Seal & Signature18
09/01/2026B01073905-I1Open ↗
09/01/2026B01073905-I1Open ↗
09/01/2026B01073905-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026B01073905-I1Open ↗
09/01/2026B01073905-I1Open ↗
08/27/2026B01174022-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/22/2026B01174022-I1Open ↗
08/22/2026B01174022-P1Open ↗
08/21/2026B01073905-P3Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/22/2026B01174022-I1Open ↗
08/22/2026B01174022-P1Open ↗
08/21/2026B01073905-P3Open ↗
Showing 3 of 8 on file for this type
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026B01174022-I1Open ↗
08/13/2026B01174022-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B01174022-I1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026B01174022-I1Open ↗
▸Other Documents10
▸DOB NOWSite Survey: Initial4
08/13/2026B01073905-S5Open ↗
08/13/2026B01073905-I1Open ↗
08/13/2026B01174022-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026B01073905-I1Open ↗
08/13/2026B01174022-P1Open ↗
08/13/2026B01174022-I1Open ↗
▸DOB NOWPlot Diagram3
08/13/2026B01174022-P1Open ↗
08/13/2026B01073905-I1Open ↗
08/13/2026B01174022-I1Open ↗