Miscellaneous two family
242 BAY 22 STREET
BROOKLYN · BIN 3169835
💬 Discuss this project
1940Year Built
1Stories
B9Building Class
R5Zoning
1,652 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Miscellaneous two family · 2,127 sf lot · 0.78 FAR built · Flood zone X
Locations of Work
Plumbing
Permit Issued — active, not yet Signed-off
Floor 1Under Construction4p · 1 filing · 20 docs
Sub-BasementUnder Construction3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
T C DESIGN809/13/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/03/2026$988K—Private party → Private party$598/sf building
12/01/2017$882K—— → —$534/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GOODLAND BUILD & DESIGN406/29/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUBE BUILDERS GROUP NYGeneral Contractor104/09/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/02/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GOODLAND DESIGN AND BUILD9715406/29/2026
Building Lifecycle
All (38)Filed (4)Permit Issued (2)Signed Off (1)Inspection (5)Special Inspection (26)
07/16/2026
Signed off — Alteration
PROPOSED INTERIOR RENOVATION OF BASEMENT AND 1FL OF EXISTING 2 STORY BUILDING. REPLACE FLOORING,CEILING, NEW PAININT THROUGHTOUT. CONSTRUCTION AS PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B01369655-I1
07/16/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/10/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fangliang Chen
06/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
Fangliang Chen
06/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Fangliang Chen
06/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
Fangliang Chen
06/30/2026
Special inspection requirement — Energy Code Compliance Inspections
Fangliang Chen
06/29/2026
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF BASEMENT AND 1FL OF EXISTING 2 STORY BUILDING. REPLACE FLOORING,CEILING, NEW PAININT THROUGHTOUT. CONSTRUCTION AS PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B01369655-P2
06/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Fangliang Chen
06/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fangliang Chen
06/26/2026
Special inspection requirement — Energy Code Compliance Inspections
Fangliang Chen
06/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
Fangliang Chen
06/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
Fangliang Chen
05/08/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/08/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/08/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/04/2026
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF BASEMENT AND 1FL OF EXISTING 2 STORY BUILDING. REPLACE FLOORING,CEILING, NEW PAININT THROUGHTOUT. CONSTRUCTION AS PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B01369655-P1
05/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fangliang Chen
05/04/2026
Special inspection requirement — Energy Code Compliance Inspections
Fangliang Chen
05/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Fangliang Chen
05/04/2026
Special inspection requirement — HVAC-R and service water heating equipment
Fangliang Chen
05/04/2026
Special inspection requirement — HVAC-R and service water heating system controls
Fangliang Chen
03/19/2026
Permit issued — Plumbing
B01369655-S1-PL
03/16/2026
Permit issued — Mechanical Systems
B01369655-I1-GC-CX
03/10/2026
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF BASEMENT AND 1FL OF EXISTING 2 STORY BUILDING. REPLACE FLOORING,CEILING, NEW PAININT THROUGHTOUT. CONSTRUCTION AS PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B01369655-I1
03/10/2026
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF BASEMENT AND 1FL OF EXISTING 2 STORY BUILDING. REPLACE FLOORING,CEILING, NEW PAININT THROUGHTOUT. CONSTRUCTION AS PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B01369655-S1
03/10/2026
Special inspection requirement — Mechanical Systems
Fangliang Chen
03/10/2026
Special inspection requirement — Interior lighting power
Fangliang Chen
03/10/2026
Special inspection requirement — HVAC-R and service water heating equipment
Fangliang Chen
03/10/2026
Special inspection requirement — Shutoff dampers
Fangliang Chen
03/10/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Fangliang Chen
03/10/2026
Special inspection requirement — Maintenance information
Fangliang Chen
03/10/2026
Special inspection requirement — HVAC-R and service water heating system controls
Fangliang Chen
03/10/2026
Special inspection requirement — Final
Fangliang Chen
03/10/2026
Special inspection requirement — Fire-Resistance Rated Construction
Fangliang Chen
03/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fangliang Chen
03/10/2026
Special inspection requirement — Energy Code Compliance Inspections
Fangliang Chen
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAMERICAN STANDARD P&H CORORP.03/19/2026
DOB NOWMechanical SystemsSigned-offCUBE BUILDERS GROUP NY03/16/2026
1 project · most recent 06/29/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/29/2026Signed-offCUBE BUILDERS GROUP NYHeating and Air Conditioning Systems
Heat / Cool
Gree MUL24HP230V1R32AO 24,000 BTU · Condensing Unit ×2
LI09HP115CR32AO 9,100 BTU · Condensing Unit ×1
MUL18HP230V1R32AO 18,000 BTU · Condensing Unit ×1
1 project · most recent 06/29/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/29/2026Permit IssuedAMERICAN STANDARD P&H CORGas, Water/Sanitary
1 project · most recent 03/23/2026
General Wiring
FiledStatusContractorScope
03/23/2026Permit IssuedJ Y ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/16/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/10/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/08/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/08/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/08/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
06/30/2026Fire-Resistant Penetrations and JointsFangliang Chenspecial
06/30/2026HVAC-R and service water heating equipmentFangliang Chenenergy_progress
06/30/2026HVAC-R and service water piping design and insulationFangliang Chenenergy_progress
06/30/2026HVAC-R and service water heating system controlsFangliang Chenenergy_progress
06/30/2026Energy Code Compliance InspectionsFangliang Chenprogress
06/26/2026HVAC-R and service water piping design and insulationFangliang Chenenergy_progress
06/26/2026Fire-Resistant Penetrations and JointsFangliang Chenspecial
06/26/2026Energy Code Compliance InspectionsFangliang Chenprogress
06/26/2026HVAC-R and service water heating system controlsFangliang Chenenergy_progress
06/26/2026HVAC-R and service water heating equipmentFangliang Chenenergy_progress
05/04/2026Fire-Resistant Penetrations and JointsFangliang Chenspecial
05/04/2026Energy Code Compliance InspectionsFangliang Chenprogress
05/04/2026HVAC-R and service water piping design and insulationFangliang Chenenergy_progress
05/04/2026HVAC-R and service water heating equipmentFangliang Chenenergy_progress
05/04/2026HVAC-R and service water heating system controlsFangliang Chenenergy_progress
03/10/2026Mechanical SystemsFangliang Chenspecial
03/10/2026Interior lighting powerFangliang Chenenergy_progress
03/10/2026HVAC-R and service water heating equipmentFangliang Chenenergy_progress
03/10/2026Shutoff dampersFangliang Chenenergy_progress
03/10/2026HVAC-R and service water piping design and insulationFangliang Chenenergy_progress
03/10/2026Maintenance informationFangliang Chenenergy_progress
03/10/2026HVAC-R and service water heating system controlsFangliang Chenenergy_progress
03/10/2026FinalFangliang Chenprogress
03/10/2026Fire-Resistance Rated ConstructionFangliang Chenprogress
03/10/2026Fire-Resistant Penetrations and JointsFangliang Chenspecial
Latest 25 of 26.
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/17/2026B01369655-P2Request digital key ↗
08/17/2026B01369655-P1Request digital key ↗
08/17/2026B01369655-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026B01369655-I1Open ↗
09/23/2026B01369655-I1Open ↗
09/02/2026B01369655-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/17/2026B01369655-P2Open ↗
08/17/2026B01369655-P1Open ↗
08/13/2026B01369655-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026B01369655-I1Open ↗
09/02/2026B01369655-P2Open ↗
08/25/2026B01369655-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/17/2026B01369655-P2Open ↗
08/17/2026B01369655-P1Open ↗
08/13/2026B01369655-S1Open ↗
Showing 3 of 4 on file for this type