← Back
Large suburban residence
242 EXETER STREET
BROOKLYN · BIN 3246318
💬 Discuss this project
1930Year Built
2Stories
A3Building Class
R3-1Zoning
5,398 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Large suburban residence · 6,240 sf lot · 0.87 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof9p · 2 filings · 20 docs
Floor 13p · 1 filing · 20 docs
Cellar4p · 1 filing · 20 docs
Basement1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
242 EXETER STREET203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/09/2020$2.0M—— → —$380/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ZPROEKT ARCHITECTURE1104/16/2024
A&D ENGINEERING, PLLC107/06/2022
YAKER ENGINEERING, P.C.209/28/2021
VERSATILE ENGINEERING, P.C.206/16/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HM CONSULTING EXPEDITING2603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
OMNI BUILD INCGeneral Contractor2207/08/2026
FOREST BROOK ELECL CONTR 003593General Contractor403/22/2026
OLEG BROYDOElectrical403/21/2026
NICE PLUMBING CORPPlumbing307/08/2026
MEGA PLBG CORPPlumbing207/08/2026
FOREST BROOK ELEC'L CONTRElectrical203/22/2026
ULTRA PLUMBING INCElectrical103/21/2026
MJX SAFETY CONSULTANTSElectrical103/21/2026
ZPROEKTGeneral Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STEEL CORE ENGINEERING PL10981004/16/2024
Building Lifecycle
All (148)Filed (16)Permit Issued (18)Signed Off (9)Violation (6)Inspection (9)Objection (60)Special Inspection (30)
08/27/2024
Signed off — Alteration
subsequent plumbing and sprinkler in conjunction with alteration
B00447447-S8
08/23/2024
Signed off — Alteration
subsequent plumbing and sprinkler in conjunction with alteration
B00447447-S7
06/11/2024
Signed off — Alteration
Partial demolition of residential facility 2-story building
B00577291-I1
05/23/2024
Signed off — Alteration
subsequent plumbing and sprinkler in conjunction with alteration
B00447447-I1
05/14/2024
Signed off — Alteration
subsequent plumbing and sprinkler in conjunction with alteration
B00447447-S4
05/03/2024
Signed off — Alteration
PROPOSED NEW SPRINKLER SYSTEM FOR ENTIRE BUILDING IN ACCORDANCE WITH NYC BC & N.F.P.A. #13D-2007
B00768250-I1
04/30/2024
Signed off — Alteration
subsequent plumbing and sprinkler in conjunction with alteration
B00447447-S3
04/29/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/25/2024
Signed off — Alteration
subsequent plumbing and sprinkler in conjunction with alteration
B00447447-S1
04/24/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/22/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Alexander Sheyman
04/22/2024
Special inspection requirement — Preliminary
Alexander Sheyman
04/22/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Alexander Sheyman
04/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Sheyman
04/22/2024
Special inspection requirement — Masonry
Alexander Sheyman
04/22/2024
Special inspection requirement — Subgrade Inspections
Alexander Sheyman
04/22/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Alexander Sheyman
04/22/2024
Special inspection requirement — Concrete - Cast-In-Place
Alexander Sheyman
04/22/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Alexander Sheyman
04/22/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
SAMER ABOU-GHAIDA
04/22/2024
Special inspection requirement — Fire-Resistance Rated Construction
Alexander Sheyman
04/22/2024
Special inspection requirement — Lowest Floor Elevation
Alexander Sheyman
04/22/2024
Special inspection requirement — Energy Code Compliance Inspections
Alexander Sheyman
04/22/2024
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Alexander Sheyman
04/22/2024
Special inspection requirement — Energy Code Compliance
Alexander Sheyman
04/22/2024
Special inspection requirement — Insulation placement and R values
Alexander Sheyman
04/22/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Alexander Sheyman
04/22/2024
Special inspection requirement — Air barrier — testing
Alexander Sheyman
04/22/2024
Special inspection requirement — Fenestration air leakage
Alexander Sheyman
04/22/2024
Special inspection requirement — Permanent certificate
Alexander Sheyman
04/22/2024
Special inspection requirement — Fireplaces
Alexander Sheyman
04/22/2024
Special inspection requirement — Protection of exposed foundation insulation
Alexander Sheyman
04/22/2024
Special inspection requirement — Interior lighting power
Alexander Sheyman
04/22/2024
Special inspection requirement — Air barrier - visual inspection
Alexander Sheyman
04/22/2024
Special inspection requirement — Fenestration areas
Alexander Sheyman
04/22/2024
Special inspection requirement — Metering
Alexander Sheyman
04/22/2024
Special inspection requirement — Exterior lighting power
Alexander Sheyman
04/22/2024
Special inspection requirement — Maintenance information
Alexander Sheyman
04/16/2024
Filed — Alteration
subsequent plumbing and sprinkler in conjunction with alteration
B00447447-P8
04/15/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/04/2024
Signed off — Alteration
subsequent plumbing and sprinkler in conjunction with alteration
B00447447-S2
04/04/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/05/2024
Filed — Alteration
subsequent plumbing and sprinkler in conjunction with alteration
B00447447-P7
02/29/2024
Special inspection requirement — Air barrier - visual inspection
Alexander Sheyman
02/29/2024
Special inspection requirement — Fenestration air leakage
Alexander Sheyman
01/11/2024
Filed — Alteration
subsequent plumbing and sprinkler in conjunction with alteration
B00447447-P6
01/05/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/04/2024
Permit issued — Sprinklers
B00768250-I1-EW-SP
01/03/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/29/2023
Permit issued — Plumbing
B00447447-S1-PL
05/25/2023
Permit issued — Construction Fence
B00447447-S2-FN
05/25/2023
Permit issued — General Construction
B00447447-I1-GC
05/25/2023
Permit issued — Mechanical Systems
B00447447-S4-MS
09/08/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/24/2022
Objection resolved — Addressed
08/23/2022
Objection raised — Scope
08/17/2022
Filed — Alteration
subsequent plumbing and sprinkler in conjunction with alteration
B00447447-P5
08/02/2022
Permit issued — Plumbing
B00447447-S1-PL
08/01/2022
Permit issued — Sprinklers
B00768250-I1-EW-SP
07/06/2022
Filed — Alteration
PROPOSED NEW SPRINKLER SYSTEM FOR ENTIRE BUILDING IN ACCORDANCE WITH NYC BC & N.F.P.A. #13D-2007
B00768250-I1
Latest 60 of 148 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offMEGA PLBG CORP01/04/2024
DOB NOWPlumbingSigned-offNICE PLUMBING CORP12/29/2023
DOB NOWConstruction FenceSigned-offOMNI BUILD INC05/25/2023
DOB NOWGeneral ConstructionSigned-offOMNI BUILD INC05/25/2023
DOB NOWMechanical SystemsSigned-offOMNI BUILD INC05/25/2023
DOB NOWPlumbingSigned-offNICE PLUMBING CORP08/02/2022
DOB NOWSprinklersSigned-offMEGA PLBG CORP08/01/2022
DOB NOWMechanical SystemsSigned-offOMNI BUILD INC05/25/2022
DOB NOWConstruction FenceSigned-offOMNI BUILD INC05/25/2022
DOB NOWGeneral ConstructionSigned-offOMNI BUILD INC05/25/2022
DOB NOWPlumbingSigned-offNICE PLUMBING CORP12/20/2021
DOB NOWMechanical SystemsSigned-offOMNI BUILD INC10/20/2021
DOB NOWFoundationSigned-offOMNI BUILD INC10/19/2021
DOB NOWStructuralSigned-offOMNI BUILD INC10/19/2021
DOB NOWGeneral ConstructionSigned-offOMNI BUILD INC10/15/2021
DOB NOWStructuralSigned-offOMNI BUILD INC08/30/2021
DOB NOWConstruction FenceSigned-offOMNI BUILD INC08/27/2021
DOB NOWCurb CutSigned-offOMNI BUILD INC08/26/2021
BIS—ISSUEDOMNI BUILD INC02/29/2024
BISPLISSUEDBRIDGEWATER PLBG & HTG INC02/19/2002
BIS—ISSUEDNONE12/13/2001
4 projects · most recent 04/15/2024
General Wiring
FiledStatusContractorScope
04/15/2024CompleteFOREST BROOK ELEC'L CONTRGeneral Wiring
04/05/2024CompleteFOREST BROOK ELEC'L CONTRGeneral Wiring
04/08/2022CompleteFOREST BROOK ELEC'L CONTR—
11/12/2020CompleteFIVE STAR ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
04/29/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
04/24/2024Pass-Final General Construction Non-Directive 14PassView ↗
04/15/2024Fail-Final General Construction Non-Directive 14FailView ↗
04/04/2024Fail-Final General Construction Non-Directive 14FailView ↗
01/05/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/03/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/08/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/20/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/20/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 127
DateRequirementInspectorRole
04/22/2024PreliminaryAlexander Sheymanprogress
04/22/2024Structural Stability – Alterations of existing buildingsAlexander Sheymanspecial
04/22/2024Concrete - Cast-In-PlaceAlexander Sheymanspecial
04/22/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationAlexander Sheymanspecial
04/22/2024Subsurface Investigations (Borings/Test Pits)SAMER ABOU-GHAIDAspecial
04/22/2024Fire-Resistance Rated ConstructionAlexander Sheymanprogress
04/22/2024Lowest Floor ElevationAlexander Sheymanprogress
04/22/2024Energy Code Compliance InspectionsAlexander Sheymanprogress
04/22/2024Energy Code ComplianceAlexander Sheymanprogress
04/22/2024Insulation placement and R valuesAlexander Sheymanenergy_progress
04/22/2024Fenestration and door U-factor and product ratingsAlexander Sheymanenergy_progress
04/22/2024Air barrier — testing Alexander Sheymanenergy_progress
04/22/2024Fenestration air leakageAlexander Sheymanenergy_progress
04/22/2024Permanent certificateAlexander Sheymanenergy_progress
04/22/2024FireplacesAlexander Sheymanenergy_progress
04/22/2024Protection of exposed foundation insulationAlexander Sheymanenergy_progress
04/22/2024Interior lighting powerAlexander Sheymanenergy_progress
04/22/2024Air barrier - visual inspectionAlexander Sheymanenergy_progress
04/22/2024Fenestration areasAlexander Sheymanenergy_progress
04/22/2024MeteringAlexander Sheymanenergy_progress
04/22/2024Exterior lighting powerAlexander Sheymanenergy_progress
04/22/2024Maintenance informationAlexander Sheymanenergy_progress
04/22/2024Exterior Insulation and Finish Systems (EIFS)Alexander Sheymanspecial
04/22/2024Subgrade InspectionsAlexander Sheymanspecial
04/22/2024Excavations - Sheeting, Shoring, and BracingAlexander Sheymanspecial
Latest 25 of 127.
▾Documents — 158 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch5
09/01/2026B00447447-S7Request digital key ↗
09/01/2026B00447447-S8Request digital key ↗
09/01/2026B00577291-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - General Construction4
09/01/2026B00447447-P7Request digital key ↗
09/01/2026B00447447-P2Request digital key ↗
09/01/2026B00447447-P8Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/01/2026B00447447-P6Request digital key ↗
09/01/2026B00447447-S1Request digital key ↗
08/14/2026B00447447-P5Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/01/2026B00447447-S4Request digital key ↗
08/15/2026B00447447-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/14/2026B00447447-S2Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
09/01/2026B00447447-S3Request digital key ↗
▸Applications & Permits11
▸BISPLAN / WORK APPROVAL APPLICATION6
08/10/2021322035739Open ↗
08/04/2021322035739Open ↗
07/28/2021322035739Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION2
03/01/2024322035739Open ↗
02/08/2024322035739Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
08/11/2021340803385Open ↗
06/22/2021340803385Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/05/2024322035739Open ↗
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026B00447447-P7Open ↗
08/13/2026B00447447-P8Open ↗
08/13/2026B00447447-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFlood Zone Design Certification4
08/13/2026B00447447-P8Open ↗
08/13/2026B00447447-P7Open ↗
08/13/2026B00447447-P2Open ↗
Showing 3 of 4 on file for this type
▸BISVERIFY TAX LOT1
04/25/2024322035739Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
04/25/2024322035739Open ↗
▸BISFLOOD ZONE DESIGN CERTIFICATION1
07/21/2021322035739Open ↗
▸Seals & Professional Certifications47
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/01/2026B00447447-P7Open ↗
09/01/2026B00447447-S1Open ↗
09/01/2026B00447447-P6Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/23/2026B00768250-I1Open ↗
09/23/2026B00447447-P7Open ↗
09/23/2026B00447447-P7Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/23/2026B00447447-P7Open ↗
08/28/2026B00447447-S8Open ↗
08/27/2026B00447447-S4Open ↗
Showing 3 of 13 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
04/23/2021340803385Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/23/2021340803385Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026B00447447-P2Open ↗
08/13/2026B00447447-I1Open ↗
08/13/2026B00447447-P7Open ↗
Showing 3 of 4 on file for this type
▸BISFINAL PLUMBING SIGNOFF1
08/30/2024322035739Open ↗
▸BISFINAL ELEVATOR SIGNOFF1
08/30/2024322035739Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST3
08/03/2021322035739Open ↗
07/21/2021322035739Open ↗
04/23/2021340803385Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SI1
02/14/2024322035739Open ↗
▸BISBPP: STREET TREES SITE PLAN1
08/12/2021340803385Open ↗
▸BISSTREET TREE SIGNOFF1
05/29/2024322035739Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
09/01/2026B00447447-S1Open ↗
09/01/2026B00447447-S8Open ↗
09/01/2026B00447447-S4Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026B00447447-I1Open ↗
08/13/2026B00447447-S1Open ↗
08/13/2026B00447447-S4Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/29/2024322035739Open ↗
▸Inspections & Test Reports9
▸DOB NOWSOIL REPORT4
08/13/2026B00447447-P7Open ↗
08/13/2026B00447447-P8Open ↗
08/13/2026B00447447-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHydrant Flow Test Letter3
09/01/2026B00447447-S1Open ↗
09/01/2026B00447447-P6Open ↗
08/14/2026B00447447-P5Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00447447-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00447447-I1Open ↗
▸Approvals, Objections & Sign-offs6
▸BISSCHEDULE A - OCCUPANCY / USE3
08/04/2021322035739Open ↗
07/28/2021322035739Open ↗
07/22/2021322035739Open ↗
▸BISFINAL CONSTRUCTION SIGNOFF1
08/30/2024322035739Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
06/13/2024340803385Open ↗
▸BISFINAL ELECTRICAL SIGNOFF1
08/30/2024322035739Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT (FINAL): PW31
04/29/2024322035739Open ↗
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
07/21/2021322035739Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION3
09/04/2024322035739Open ↗
02/14/2024322035739Open ↗
06/22/2021340803385Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
06/22/2021340803385Open ↗
▸BISEFILING COVER SHEET1
03/03/2021322035739Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
04/23/2021340803385Open ↗
▸Other Documents28
▸DOB NOWLowest Floor Elevation Plan4
09/01/2026B00447447-S1Open ↗
09/01/2026B00447447-S8Open ↗
09/01/2026B00447447-S4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026B00447447-P7Open ↗
08/13/2026B00447447-P8Open ↗
08/13/2026B00447447-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlot Diagram4
08/13/2026B00447447-P2Open ↗
08/13/2026B00447447-I1Open ↗
08/13/2026B00447447-P8Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)4
08/13/2026B00447447-S8Open ↗
08/13/2026B00447447-I1Open ↗
08/13/2026B00447447-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHydraulic Calculations3
08/13/2026B00447447-P6Open ↗
08/13/2026B00447447-P5Open ↗
08/13/2026B00447447-S1Open ↗
▸DOB NOWSite Survey: Initial3
08/13/2026B00447447-I1Open ↗
08/13/2026B00447447-P7Open ↗
08/13/2026B00447447-P8Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice2
08/13/2026B00577291-I1Open ↗
08/13/2026B00447447-I1Open ↗
▸BISNYS DEC TIDAL WETLANDS MAP1
04/23/2021340803385Open ↗
▸BISNYS DEC COASTAL EROSION HAZARD MAP1
04/23/2021340803385Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
08/11/2021340803385Open ↗
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)1
07/05/2024322035739Open ↗