← Back
BuildNYC
Miscellaneous outdoor recreational facility
242 FLATBUSH AVENUE EXTENSION
BROOKLYN · BIN 3838096
💬 Discuss this project
0Year Built
—Stories
Q9Building Class
C6-6Zoning
0 sfGross Floor Area
0Units
0 Active Violations 5 old, status unconfirmed ▸FDNY Report ↗
Miscellaneous outdoor recreational facility · Owner of record: 141 Willoughby Fee Owner · 2,655 sf lot · 0 FAR built · Flood zone X
Locations of Work
PlumbingCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Site & exteriorExterior plumbing, sitework, stormwater drainage and detenti1 filing · 4 docs
Filed — no permit issuedExterior civil sitework, landscaping, and grading5p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Savanna407/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/30/2018$4.0M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bohler Engineering NY205/10/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Milrose Consultants403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Pace PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Atlantic Engineeringlabor1381103/29/2022
Building Lifecycle
All (15)Filed (2)Permit Issued (1)Violation (5)Inspection (2)Objection (4)Special Inspection (1)
07/06/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/29/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/15/2022
Permit issued — Plumbing
B00703952-I1-PL
05/26/2022
Objection resolved — Addressed
05/23/2022
Objection raised — Scope
05/10/2022
Filed — Alteration
CIVIL SITEWORK,, LANDSCAPING AND GRADING AS PER PLANS FILED HEREWITH. ALL WORK BEING PROPOSED IS EXTERIOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB# 321593316 ON ADJACENT LOT 1.
B00718462-I1
04/06/2022
Objection raised — Scope
04/06/2022
Objection resolved — Addressed
03/29/2022
Filed — Alteration
PLUMBING WORK ASSOCIATED WITH SITEWORK INCLUDING STORMWATER DRAINAGE AND DETENTION SYSTEM. ALL WORK BEING PROPOSED IS EXTERIOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB# 321593316 ON ADJACENT LOT 1.
B00703952-I1
03/22/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Christopher O'Malley
02/02/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/01/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/02/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/02/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/02/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPace Plumbing06/15/2022
1 project · most recent 03/29/2022
Storm
FiledStatusContractorScope
03/29/2022Signed-offPace PlumbingStorm
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/06/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/29/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
03/22/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationChristopher O'Malleyspecial
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/15/2026B00703952-I1Request digital key ↗
08/15/2026B00718462-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026B00703952-I1Open ↗
08/13/2026B00718462-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026B00703952-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWOER: Notice to Proceed1
08/13/2026B00703952-I1Open ↗