← Back
Two stories - detached, small or mid-size
242 RUGBY ROAD
BROOKLYN · BIN 3118335
💬 Discuss this project
1925Year Built
2.75Stories
A1Building Class
R3XZoning
2,568 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 5,000 sf lot · 0.51 FAR built · Flood zone X
Locations of Work
StructuralPlumbing
Roof1p · 1 filing · 12 docs
Floor 11p · 1 filing · 3 docs
Cellar1p · 1 filing · 12 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/27/2019$1.8M—Private party → Private party$681/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
J X 2 DESIGN CONSULING LLC404/06/2022
PAUL GURDAK ARCHITECT103/04/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HOVANN203/21/2026
HTX BUILDING CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ORBIT PLBG & HTG INCPlumbing207/08/2026
ELPO ELECTRICAL CONTG INCElectrical103/22/2026
K & B HVAC LLCGeneral Contractor104/09/2026
TORO RENOVATION CORPGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AKS ARCHITECTURAL & ENGIN1957104/10/2020
Building Lifecycle
All (16)Filed (5)Permit Issued (4)Signed Off (2)Special Inspection (5)
06/21/2022
Signed off — Alteration
B00335548-I1
04/06/2022
Filed — Alteration
New gas (1)boiler with hwh (heat pump) , (1)mop sink at cellar, (1)new dish washer, (1)sink, (1)lav.,(1) toilet, (1) gas fire place, (1) gas stove at first floor, (1) new washier and (1) gas dryer, (2) showers, (2) toilets, (4) lavatories, (1) bathtub
B00298348-P2
03/23/2022
Signed off — Alteration
APPLICATION FILED TO RENOVATE EXISTING PORCH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B00692112-I1
03/18/2022
Permit issued — General Construction
B00692112-I1-GC
03/04/2022
Filed — Alteration
APPLICATION FILED TO RENOVATE EXISTING PORCH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B00692112-I1
03/04/2022
Special inspection requirement — Final
PAUL GURDAK-WARCHOL
08/17/2021
Permit issued — Plumbing
B00298348-I1-PL
04/15/2021
Permit issued — Mechanical Systems
B00335548-I1-MS
04/10/2020
Filed — Alteration
B00335548-I1
03/23/2020
Filed — Alteration
New gas (1)boiler with hwh (heat pump) , (1)mop sink at cellar, (1)new dish washer, (1)sink, (1)lav.,(1) toilet, (1) gas fire place, (1) gas stove at first floor, (1) new washier and (1) gas dryer, (2) showers, (2) toilets, (4) lavatories, (1) bathtub
B00298348-P1
03/19/2020
Special inspection requirement — Energy Code Compliance Inspections
JINHO KIM
03/19/2020
Special inspection requirement — Fire-Resistance Rated Construction
JINHO KIM
03/19/2020
Special inspection requirement — HVAC and service water heating equipment
JINHO KIM
03/19/2020
Special inspection requirement — HVAC insulation and sealing
JINHO KIM
02/03/2020
Permit issued — Plumbing
B00298348-I1-PL
01/17/2020
Filed — Alteration
New gas (1)boiler with hwh (heat pump) , (1)mop sink at cellar, (1)new dish washer, (1)sink, (1)lav.,(1) toilet, (1) gas fire place, (1) gas stove at first floor, (1) new washier and (1) gas dryer, (2) showers, (2) toilets, (4) lavatories, (1) bathtub
B00298348-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offTORO RENOVATION CORP03/18/2022
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC08/17/2021
DOB NOWMechanical SystemsSigned-offK & B HVAC LLC04/15/2021
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC02/03/2020
BISOTISSUEDTORO RENOVATION CORP01/22/2020
1 project · most recent 04/06/2022
Gas Water/Sanitary
FiledStatusContractorScope
04/06/2022Signed-offORBIT PLBG & HTG INCGas, Water/Sanitary
1 project · most recent 11/04/2019
General Wiring
FiledStatusContractorScope
11/04/2019CompleteELPO ELECTRICAL CONTG INCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
03/04/2022FinalPAUL GURDAK-WARCHOLprogress
03/19/2020Energy Code Compliance InspectionsJINHO KIMprogress
03/19/2020Fire-Resistance Rated ConstructionJINHO KIMprogress
03/19/2020HVAC and service water heating equipment JINHO KIMenergy_progress
03/19/2020HVAC insulation and sealing JINHO KIMenergy_progress
▾Documents — 30 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch - Plumbing3
09/02/2026B00298348-I1Request digital key ↗
09/02/2026B00298348-P2Request digital key ↗
08/15/2026B00298348-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00335548-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/31/2026B00692112-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
01/17/2020340714301Open ↗
▸BISWORK PERMIT APPLICATION1
01/22/2020340714301Open ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/13/2026B00298348-I1Open ↗
08/13/2026B00692112-I1Open ↗
08/13/2026B00335548-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/02/2026B00298348-P1Open ↗
09/02/2026B00298348-P1Open ↗
09/02/2026B00298348-P1Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
01/17/2020340714301Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/17/2020340714301Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/17/2020340714301Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026B00335548-I1Open ↗
08/13/2026B00298348-I1Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
01/17/2020340714301Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
01/17/2020340714301Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
01/17/2020340714301Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
01/17/2020340714301Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
01/17/2020340714301Open ↗
01/17/2020340714301Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
01/17/2020340714301Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
01/17/2020340714301Open ↗