ECB09/27/2026At 6-story NB, proposed building footprint 135390 sq. Ft. Approx. Site closed and there was no construction activity. Upon shouting at perimeter and banging on fence to alert watchperson and to verify complianc$5K due
ECB09/02/2026Failure to institute safety equip measures or temporary construction, "no toe board". As noted: at time of, inspection at an active jobsite of a proposed 7 story already at the bulkhead level. Observed a safety$5K due
ECB11/04/2024At time of inspection of site observed no guardrail system in place around perimeter of foundation/soe. Drop down to foundation floor is approx 10 ft from grade level.Nothing owed — awaiting certificate of correction
ECB11/04/2024Pswo - at time of inspection at exposure #3 observed approx 12'w x 15'h of cmu wall removed. Premises has no approved permit for demo and no demo start date in DOB system. Stop all work at exposure #3 and 10 ftNothing owed — awaiting certificate of correction
ECB07/16/2024While conducting a stalled site inspection i observed, yellow gas storage canister left in the middle of the construction site unsecured, which creates a hazard of fire or explosionprovide and maintain adequateNothing owed — awaiting certificate of correction
ECB07/16/2024While conducting a perimeter inspection of a stalled site for a proposed 13 story structure, i observed standing water on site at foundation levelprovide and maintain adequate water drainage. Provide pe repot fNothing owed — awaiting certificate of correction
ECB07/16/2024At the time of my inspection of a stalled site, i observed that graffiti was all over construction fence at exposure 1PROVIDE and maintain fence as per codeNothing owed — awaiting certificate of correction
ECB07/16/2024While conducting a stalled site inspection i observed, the required pedestrian walkway wasn't maintained as per code. Sidewalk is closed due to construction fence placement not giving pedestrians a safe place tNothing owed — awaiting certificate of correction
ECB05/21/2024Observed a jobsite / construction fence at exp# 1 & 4. Upon review of department records, i found that no permit for a jobsite / construction fence had been issued at this premises.. Obtain permit for jobsite /Nothing owed — awaiting certificate of correction
ECB05/21/2024Observed jobsite fence at exp# 1 with an aprox. 12FT section of fence completely collapsed, with plywood panels and other debris remaining on and obstructing the sidewalk; 3FTX4FT section of fence at exp# 4 remNothing owed — awaiting certificate of correction
ECB05/21/2024Observed 1 str building under enlargement to 2 str- stalled site- with 2ND flr exterior wall constisting of cmu blocks and brick facade only partially contructed, in multiple areas including at the exp# 3 & 3/4Nothing owed — awaiting certificate of correction
ECB05/21/20243307.2.1 obstruction of streets, including bicycle lanes and sidewalks. Observed NB under construction (stalled site), with sidewalk access blocked to pedestrians (occupied by site), with a temporary pedestrianNothing owed — awaiting certificate of correction
ECB05/21/2024Bc 3307.7.1 location of fence. Observed proposed 13STR NB at foundation stage (stalled site) w/ open/exposed cellar lvl- not enclosed w/ guard rails- with no jobsite fencing on the property lines at exps# 3 & 4Nothing owed — awaiting certificate of correction
ECB05/21/2024Observed jobsite fence at exp#1 not fully painted hunter green due to excessive vandalized markings throughout the entirety of the fence.Nothing owed — awaiting certificate of correction
ECB05/21/2024Bc 3303.14.5 dewatering. Observed proposed 13 str NB at foundation stage (stalled site), w/ open cellar lvl, aprox. 10FT deep, with water accumulation through the entire cellar lvl of aprox. 6" to 12". Gc faileNothing owed — awaiting certificate of correction
ECB08/15/2023Job site fence not constructed or maintained pursuant to subsection note: observed a construction fence build on exposures 1 and 4. No viewing panel were installed on the fence at exposures 1 and 4. As per codeNothing owed — awaiting certificate of correction
ECB07/10/2023At the time of inspection responding to complaint, i observed jobsite fence permit posted on fence also in the department system has expired on 1/31/2021RENEW permit as required.Nothing owed — awaiting certificate of correction
ECB07/10/2023At the time of inspection while responding to an incident, where sidewalk shed have been damage due to vehicle collision i observed 3 damage shed panels at exposure#1 i also observed one damage/ bent verticalNothing owed — awaiting certificate of correction
ECB11/18/2022Stalled site, no active construction,doing research on BIS and DOB now it is noticed that fence permit (321371369-01-eq fn) expired on 1/31/2021 and fence need to be maintained per code. Renew permitNothing owed — awaiting certificate of correction
ECB05/25/2022Construction fence does not meet code.observed construction fence erected at exp #1 & #4 not maintained.note:observed construction fence had gaps & openings allowing access to construction site.graffitti & postNothing owed — awaiting certificate of correction
ECB05/25/2022Construction fence with no permit.observed construction fence erected at exp #1 #4 with no active permit posted on site.research no permit found in BIS & DOB now.remedy:obtain permit.Nothing owed — awaiting certificate of correction
ECB06/23/2021Temporary construction equipment-expired permit.at time of inspection on a closed alt 2 story jobsite,observed construction fence installed at EXP1 and 4.upon review of permit observed construction fence permitNothing owed — awaiting certificate of correction
ECB08/21/2017Altered/changed building occupied w/o a valid certificate of occupancyas per 28-118.3.1 - 28-11.3.2 schedule a of A1 job#321230431 describeoffice/retail space eating and drinking job not sign off as of 08-17-1Nothing owed — awaiting certificate of correction
Other miscellaneous · Owner of record: NYM 215 Moore · 135,390 sf lot · 0.65 FAR built · Flood zone X