Converted dwellings or rooming house
242 WEST 132 STREET
MANHATTAN · Harlem (North) · BIN 1058755
💬 Discuss this project
1910Year Built
3Stories
C5Building Class
R7-2Zoning
2,561 sfGross Floor Area
7Units
Rent Stabilized0 Open Violations
Converted dwellings or rooming house · Owner of record: ICER OF 242 WEST 132ND STREET LLC · 1,682 sf lot · 1.52 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneral
Roof17p · 1 filing · 20 docs
Floor 360p · 2 filings · 20 docs
Floor 261p · 2 filings · 20 docs
Floor 159p · 2 filings · 20 docs
Cellar61p · 2 filings · 20 docs
Basement27p · 1 filing · 20 docs
Sub-Basement22p · 1 filing · 20 docs
Site & exterior31p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ICER PROPERTIES1907/08/2026
WEST HARLEM DEVELOPMENT GROUP LL403/21/2026
ICER OF 242 WEST 132ND STREET LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/26/2020$1.2M—— → —$480/sf building
03/23/2017$530K—Private party → Private party$207/sf building
03/03/2015$1.0M—— → —$408/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KNF SERVICES CORP310/09/2023
CHOSEN MEP, CORP.606/01/2022
FL&M ENGINEERING DESIGN &INSPECTION211/10/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC1803/21/2026
GREEN STUDIO403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
YATZIV CORPGeneral Contractor603/21/2026
MANHATTAN D ENTERPRISESGeneral Contractor407/08/2026
RTESS MANAGEMENT SOLUTIONGeneral Contractor303/21/2026
MERCURY FIRE SUPP INCFire Protection107/08/2026
PIPE SOLUTIONS ADVIS INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REGIONAL TESTING CORP.394910/09/2023
Building Lifecycle
All (139)Filed (11)Permit Issued (7)Signed Off (6)Violation (60)Inspection (11)Objection (14)Special Inspection (30)
10/31/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/04/2025
Violation issued (HPD, closed)
A
12/04/2023
Violation issued (HPD, closed)
B
11/06/2023
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HROIZONTAL EXTENSION AND CONVERTING 12 FAMILY INTO 8 FAMILIES AS PER PLANS. APPLICATION FILED TO SUPERSEDE APPLICATION #104609005
M00680588-I1
10/17/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/12/2023
Special inspection requirement — Maintenance information
Paul Raymond
10/12/2023
Special inspection requirement — Lighting controls
Paul Raymond
10/12/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Paul Raymond
10/12/2023
Special inspection requirement — Metering
Paul Raymond
10/12/2023
Special inspection requirement — Fenestration areas
Paul Raymond
10/12/2023
Special inspection requirement — Interior lighting power
Paul Raymond
10/12/2023
Special inspection requirement — Protection of exposed foundation insulation
Paul Raymond
10/12/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Paul Raymond
10/12/2023
Special inspection requirement — Air barrier - visual inspection
Paul Raymond
10/12/2023
Special inspection requirement — Insulation placement and R values
Paul Raymond
10/12/2023
Special inspection requirement — Fenestration air leakage
Paul Raymond
10/12/2023
Special inspection requirement — Lighting in dwelling units
Paul Raymond
10/12/2023
Special inspection requirement — Exterior lighting power
Paul Raymond
10/09/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HROIZONTAL EXTENSION AND CONVERTING 12 FAMILY INTO 8 FAMILIES AS PER PLANS. APPLICATION FILED TO SUPERSEDE APPLICATION #104609005
M00680588-P2
10/09/2023
Special inspection requirement — Interior lighting power
Paul Raymond
10/09/2023
Special inspection requirement — Fenestration areas
Paul Raymond
10/09/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Paul Raymond
10/09/2023
Special inspection requirement — Metering
Paul Raymond
10/09/2023
Special inspection requirement — Air barrier - visual inspection
Paul Raymond
10/09/2023
Special inspection requirement — Lighting controls
Paul Raymond
10/09/2023
Special inspection requirement — Protection of exposed foundation insulation
Paul Raymond
10/09/2023
Special inspection requirement — Exterior lighting power
Paul Raymond
10/09/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Paul Raymond
10/09/2023
Special inspection requirement — Insulation placement and R values
Paul Raymond
10/09/2023
Special inspection requirement — Lighting in dwelling units
Paul Raymond
10/09/2023
Special inspection requirement — Maintenance information
Paul Raymond
10/09/2023
Special inspection requirement — Fenestration air leakage
Paul Raymond
09/19/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HROIZONTAL EXTENSION AND CONVERTING 12 FAMILY INTO 8 FAMILIES AS PER PLANS. APPLICATION FILED TO SUPERSEDE APPLICATION #104609005
M00680588-P1
09/19/2023
Special inspection requirement — Fenestration areas
Paul Raymond
09/19/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Paul Raymond
09/19/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Paul Raymond
09/19/2023
Special inspection requirement — Interior lighting power
Paul Raymond
08/17/2023
Violation issued (HPD, closed)
C
08/10/2023
Violation issued (HPD, closed)
A
08/10/2023
Violation issued (HPD, closed)
A
08/10/2023
Violation issued (HPD, closed)
B
08/10/2023
Violation issued (HPD, closed)
A
07/05/2023
Signed off — Alteration
M00487245-S3
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/27/2023
Permit issued — Mechanical Systems
M00487245-S3-MS
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/28/2023
Violation issued (ECB, closed)
Construction
03/16/2023
Violation issued (HPD, closed)
A
01/20/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
01/17/2023
Inspection — No Access-Final CND-Occupancy Inspection
No Access
View inspection ↗
01/11/2023
Signed off — Alteration
M00487245-S1
09/08/2022
Signed off — Alteration
M00487245-I1
08/26/2022
Signed off — Alteration
M00487245-S2
08/10/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/27/2022
Permit issued — General Construction
M00680588-I1-GC
07/05/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/23/2022
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
Latest 60 of 139 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offRTESS MANAGEMENT SOLUTION06/27/2023
DOB NOWGeneral ConstructionPermit IssuedYATZIV CORP07/27/2022
DOB NOWPlumbingSigned-offPIPE SOLUTIONS ADVIS INC03/24/2022
DOB NOWSprinklersSigned-offMERCURY FIRE SUPP INC01/20/2022
DOB NOWSupported ScaffoldSigned-offMANHATTAN D ENTERPRISES10/22/2021
DOB NOWSupported ScaffoldSigned-offMANHATTAN D ENTERPRISES10/22/2021
DOB NOWEarth WorkSigned-offYATZIV CORP10/22/2021
BIS—ISSUEDYATZIV CORP12/29/2021
BISPLISSUEDPIPE SOLUTIONS ADVIS INC12/13/2021
BISEQISSUEDYATZIV CORP10/29/2021
BIS—ISSUEDYATZIV CORP10/19/2021
BIS—ISSUEDYATZIV CORP07/21/2021
BISEQISSUEDMICHAEL HARRIS09/22/2015
BISEQISSUEDWAYNES BUILDERS & CONSTRUCTION03/12/2008
BIS—ISSUEDWAYNE'S BUILDERS&CONST.LLC03/11/2008
BISEQISSUEDWAYNES'S BUILDERS & CONSTRUCTION03/11/2008
BISEQISSUEDSTONELEDGE SCAFFOLDING CORP03/23/2007
BIS—ISSUEDWAYNE'S BUILDERS&CONST.LLC01/18/2007
BISEQISSUEDWAYNES'S BUILDERS & CONSTRUCTION01/16/2007
3 projects · most recent 08/29/2022
General Wiring
FiledStatusContractorScope
08/29/2022CompleteSHTRAL ELECT'L CONT'G CORGeneral Wiring
10/21/2021CompleteV. VASS ELECTRIC CORP—
08/12/2021CompleteSHTRAL ELECT'L CONT'G COR—
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
10/31/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/17/2023Pass-Final CND-Occupancy InspectionPassView ↗
01/20/2023Fail-Final CND-Occupancy InspectionFailView ↗
01/17/2023No Access-Final CND-Occupancy InspectionNo AccessView ↗
08/10/2022Pass-Final CND-Occupancy InspectionPassView ↗
07/05/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/23/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/23/2022Pass-Final SP - Up to 9 Requested FloorsPassView ↗
06/17/2022Fail-Final PL - Up to 9 Requested FloorsFailView ↗
04/06/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/31/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 60
DateRequirementInspectorRole
10/12/2023Maintenance informationPaul Raymondenergy_progress
10/12/2023Lighting controlsPaul Raymondenergy_progress
10/12/2023Fenestration and door U-factor and product ratingsPaul Raymondenergy_progress
10/12/2023MeteringPaul Raymondenergy_progress
10/12/2023Fenestration areasPaul Raymondenergy_progress
10/12/2023Interior lighting powerPaul Raymondenergy_progress
10/12/2023Protection of exposed foundation insulationPaul Raymondenergy_progress
10/12/2023Structural Stability – Alterations of existing buildingsPaul Raymondspecial
10/12/2023Air barrier - visual inspectionPaul Raymondenergy_progress
10/12/2023Insulation placement and R valuesPaul Raymondenergy_progress
10/12/2023Fenestration air leakagePaul Raymondenergy_progress
10/12/2023Lighting in dwelling unitsPaul Raymondenergy_progress
10/12/2023Exterior lighting powerPaul Raymondenergy_progress
10/09/2023Interior lighting powerPaul Raymondenergy_progress
10/09/2023Fenestration areasPaul Raymondenergy_progress
10/09/2023Fenestration and door U-factor and product ratingsPaul Raymondenergy_progress
10/09/2023MeteringPaul Raymondenergy_progress
10/09/2023Air barrier - visual inspectionPaul Raymondenergy_progress
10/09/2023Lighting controlsPaul Raymondenergy_progress
10/09/2023Protection of exposed foundation insulationPaul Raymondenergy_progress
10/09/2023Exterior lighting powerPaul Raymondenergy_progress
10/09/2023Structural Stability – Alterations of existing buildingsPaul Raymondspecial
10/09/2023Insulation placement and R valuesPaul Raymondenergy_progress
10/09/2023Lighting in dwelling unitsPaul Raymondenergy_progress
10/09/2023Maintenance informationPaul Raymondenergy_progress
Latest 25 of 60.
▾Documents — 197 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
09/04/2026M00487245-I1Request digital key ↗
09/04/2026M00487245-P2Request digital key ↗
09/04/2026M00487245-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits28
▸BISPLAN / WORK APPROVAL APPLICATION22
07/18/2023104609005Open ↗
01/06/2023104609005Open ↗
12/29/2022104609005Open ↗
Showing 3 of 22 on file for this type
▸BISWORK PERMIT APPLICATION5
12/30/2021104609005Open ↗
12/13/2021104609005Open ↗
10/29/2021104609005Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
12/27/2022104609005Open ↗
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026M00680588-P2Open ↗
08/13/2026M00680588-P1Open ↗
08/13/2026M00680588-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026M00680588-P1Open ↗
08/13/2026M00680588-P2Open ↗
08/13/2026M00680588-I1Open ↗
▸BISVERIFY TAX LOT1
02/28/2023104609005Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026M00680588-I1Open ↗
▸Seals & Professional Certifications74
▸DOB NOWProgress Inspector Seal & Signature45
09/24/2026M00487245-S3Open ↗
09/24/2026M00487245-S3Open ↗
09/24/2026M00487245-S3Open ↗
Showing 3 of 45 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/24/2026M00487245-S3Open ↗
09/24/2026M00487245-S3Open ↗
09/24/2026M00487245-S3Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/04/2026M00487245-I1Open ↗
09/04/2026M00487245-P2Open ↗
09/04/2026M00487245-P1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/29/2015122527676Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/29/2015122527676Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
01/17/2017122994634Open ↗
▸Trade Schedules & Equipment4
▸BISFA - FDNY APPROVAL : FD-FAA1
01/26/2023104609005Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
01/17/2017122994634Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
01/11/2023104609005Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
01/11/2023104609005Open ↗
▸Safety & Tenant Protection16
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist11
08/13/2026M00680588-I1Open ↗
08/13/2026M00680588-P2Open ↗
08/13/2026M00680588-P1Open ↗
Showing 3 of 11 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
09/29/2015122527676Open ↗
▸BISSTREET TREE CHECKLIST1
01/17/2017122994634Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026M00680588-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026M00680588-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026M00680588-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
09/04/2026M00487245-S3Open ↗
08/13/2026M00680588-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/17/2017122994634Open ↗
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026M00680588-I1Open ↗
08/13/2026M00487245-S3Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/17/2017122994634Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY3
09/09/2022104709709Open ↗
09/09/2022104709709Open ↗
09/09/2022104709709Open ↗
▸BIS* STRUCTURAL STABILITY 1 RCNY:16-011
01/11/2023104609005Open ↗
▸BIS* TR2: CONCRETE TEST CYLINDERS TECHNICAL REPORT1
01/11/2023104609005Open ↗
▸BIS* MASONRY UNITS RS 10-3 3.21
01/11/2023104609005Open ↗
▸BIS* DRYWELL INST RET/DET : TR1-DRYWELL RS16-P110.131
01/11/2023104609005Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
09/29/2015122527676Open ↗
▸BIS* TR3 PRIOR TO SIGNOFF1
01/11/2023104609005Open ↗
▸Approvals, Objections & Sign-offs6
▸BISSCHEDULE A - OCCUPANCY / USE4
12/29/2022104609005Open ↗
11/10/2021104609005Open ↗
02/01/2021104609005Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
10/29/2021104609005Open ↗
07/22/2021104609005Open ↗
▸Cost, Insurance & Ownership7
▸BISAcord 25 (Acord Certificate of Liability Insurance)3
12/30/2021104609005Open ↗
10/28/2021104609005Open ↗
07/22/2021104609005Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE2
12/30/2021104609005Open ↗
10/28/2021104609005Open ↗
▸BISCOST AFFIDAVIT2
01/17/2017122994634Open ↗
09/29/2015122527676Open ↗
▸Filing & Intake Forms12
▸BISBOROUGH INTAKE FORM7
12/30/2021104609005Open ↗
10/25/2021104609005Open ↗
07/22/2021104609005Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION3
02/25/2021104609005Open ↗
01/12/2021104609005Open ↗
01/11/2021104609005Open ↗
▸BISEFILING COVER SHEET2
01/17/2017122994634Open ↗
09/29/2015122527676Open ↗
▸Other Documents16
▸DOB NOWSite Survey: Initial3
08/13/2026M00680588-P1Open ↗
08/13/2026M00680588-I1Open ↗
08/13/2026M00680588-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026M00680588-I1Open ↗
08/13/2026M00680588-P2Open ↗
08/13/2026M00680588-P1Open ↗
▸DOB NOWProperty Ownership Certification3
08/13/2026M00680588-I1Open ↗
08/13/2026M00680588-P1Open ↗
08/13/2026M00680588-P2Open ↗
▸BIS* * LT.GAUGE STEEL/WOOD FL.TRUSS/LAM.IBEAM TPPN2/001
01/11/2023104609005Open ↗
▸BIS* * SUBGRADE 27-723,DIRC 15/711
01/11/2023104609005Open ↗
▸BIS* FIRE STOPS 27-3451
01/12/2023104609005Open ↗
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7791
01/11/2023104609005Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026M00487245-S1Open ↗
▸DOB NOWFinal Survey1
08/13/2026M00680588-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026M00680588-I1Open ↗