← Back
BuildNYC
Limited service hotel, often national chain
New York Hotel
242 WEST 76TH STREET · BIN 1030845
💬 Discuss this project
1926Year Built
15Stories
H3Building Class
R8BZoning
81,560 sfGross Floor Area
1Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SWARMP
Limited service hotel, often national chain · Owner of record: 242 West 76 Realty · 7,824 sf lot · 10.42 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofEmpire Hospitality-Wallace3p · 1 filing · 8 docs
Floor 6Mille-feuille BakeryCafe3p · 1 filing · 20 docs
Floor 5Mille-feuille BakeryCafe3p · 1 filing · 20 docs
Floor 4Empire Hospitality-Wallace, Mille-feuille BakeryCafe4p · 2 filings · 20 docs
Floor 3Mille-feuille BakeryCafe3p · 1 filing · 20 docs
Floor 2Mille-feuille BakeryCafe3p · 1 filing · 20 docs
Floor 1Empire Hospitality-Wallace, Mille-feuille BakeryCafe +113p · 3 filings · 20 docs
CellarEmpire Hospitality-Wallace, Mille-feuille BakeryCafe +115p · 3 filings · 20 docs
Site & exteriorEmpire Hospitality-Wallace, New York Hotel18p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
242 West 76 Realty2203/22/2026
Empire Hospitality Group1510/03/2026
S&E Maintenance203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/24/2016$69.4M—THE MILBURN HOTEL, LLC → 242 WEST 76 REALTY LLC$851/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Omf Architect909/09/2026
Prudigm Engineering312/21/2022
Green Design203/22/2021
Royal T&E209/04/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Laszlo Kovacs303/21/2026
Treasure Box Services1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Phoenix Sutton STRScaffold1307/08/2026
Build Up RestorationGeneral Contractor307/08/2026
The Right Connection P&HPlumbing307/08/2026
G.A.M.C.N.YGeneral Contractor203/21/2026
Ariana ContractingPlumbing207/08/2026
Max Electric CoElectrical103/21/2026
New York Standard MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Omf Architects5900909/09/2026
Prudigm Engineering Llcu4304312/21/2022
Building Lifecycle
All (154)Filed (16)Permit Issued (17)Signed Off (6)Facade (FISP) (15)Violation (60)Inspection (4)Objection (6)Special Inspection (30)
09/09/2026
Filed — Alteration CO
Propose change of use at the Cellar level to add a multipurpose room and a accessory kitchen to serve the new lounge room at the First floor. No changes above the first floor as part of this application. To get new Certificate of occupancy.
M00671544-P6
08/31/2026
Special inspection requirement — Energy Code Compliance Inspections
OSCAR FUERTES
08/31/2026
Special inspection requirement — Fire-Resistance Rated Construction
OSCAR FUERTES
08/31/2026
Special inspection requirement — Interior lighting power
OSCAR FUERTES
08/31/2026
Special inspection requirement — Lighting controls
OSCAR FUERTES
08/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
OSCAR FUERTES
08/05/2026
Filed — Alteration CO
Propose change of use at the Cellar level to add a multipurpose room and a accessory kitchen to serve the new lounge room at the First floor. No changes above the first floor as part of this application. To get new Certificate of occupancy.
M00671544-P5
08/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
OSCAR FUERTES
08/03/2026
Special inspection requirement — Interior lighting power
OSCAR FUERTES
08/03/2026
Special inspection requirement — Lighting controls
OSCAR FUERTES
08/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
OSCAR FUERTES
08/03/2026
Special inspection requirement — Energy Code Compliance Inspections
OSCAR FUERTES
11/29/2023
Filed — Alteration CO
Propose change of use at the Cellar level to add a multipurpose room and a accessory kitchen to serve the new lounge room at the First floor. No changes above the first floor as part of this application. To get new Certificate of occupancy.
M00671544-P4
11/15/2023
Violation issued (HPD, closed)
I
08/29/2023
Filed — Alteration CO
Propose change of use at the Cellar level to add a multipurpose room and a accessory kitchen to serve the new lounge room at the First floor. No changes above the first floor as part of this application. To get new Certificate of occupancy.
M00671544-P3
08/26/2023
Special inspection requirement — Fire-Resistance Rated Construction
OSCAR FUERTES
08/26/2023
Special inspection requirement — Lighting controls
OSCAR FUERTES
08/26/2023
Special inspection requirement — Interior lighting power
OSCAR FUERTES
08/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
OSCAR FUERTES
08/26/2023
Special inspection requirement — Energy Code Compliance Inspections
OSCAR FUERTES
06/28/2023
Cycle 9 facade report signed — SWARMP
06/20/2023
Filed — Alteration CO
Propose change of use at the Cellar level to add a multipurpose room and a accessory kitchen to serve the new lounge room at the First floor. No changes above the first floor as part of this application. To get new Certificate of occupancy.
M00671544-P2
06/16/2023
Special inspection requirement — Energy Code Compliance Inspections
OSCAR FUERTES
06/16/2023
Special inspection requirement — Interior lighting power
OSCAR FUERTES
06/16/2023
Special inspection requirement — Lighting controls
OSCAR FUERTES
06/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
OSCAR FUERTES
06/16/2023
Special inspection requirement — Fire-Resistance Rated Construction
OSCAR FUERTES
06/12/2023
Signed off — Alteration
FILING OF ROOFTOP/OUTDOOR SPLIT HVAC CONDENSING UNITS TO OBTAIN PERMIT AND CERTIFICATE OF COMPLIANCE, NO CHANGE INUSE EGRESS OR OCCUPANCY
M00800044-I1
06/01/2023
Cycle 9 facade inspection completed
03/02/2023
Signed off — Alteration
Plumbing work for accessory kitchen in the cellar and for a new lounge room in the first floor as per plans in conjunction with alteration CO application job # M00671544
M00784359-I1
02/21/2023
Cycle 9 facade report submitted
01/04/2023
Permit issued — Mechanical Systems
M00800044-I1-MS
12/21/2022
Filed — Alteration
FILING OF ROOFTOP/OUTDOOR SPLIT HVAC CONDENSING UNITS TO OBTAIN PERMIT AND CERTIFICATE OF COMPLIANCE, NO CHANGE INUSE EGRESS OR OCCUPANCY
M00800044-I1
12/21/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Naeem Anwar
12/21/2022
Special inspection requirement — HVAC-R and service water heating equipment
Naeem Anwar
12/21/2022
Special inspection requirement — Maintenance information
Naeem Anwar
12/21/2022
Special inspection requirement — HVAC-R and service water heating system controls
Naeem Anwar
12/21/2022
Special inspection requirement — Tenant Protection Plan Compliance
Naeem Anwar
12/15/2022
Special inspection requirement — Final
Naeem Anwar
12/15/2022
Special inspection requirement — Mechanical Systems
Naeem Anwar
11/28/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/15/2022
Signed off — Alteration
Install new plumbing fixtures for two restrooms at cellar.
M00272626-I1
11/15/2022
Signed off — Alteration
M00276102-I1
10/10/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/06/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/06/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/07/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Naeem Anwar
09/07/2022
Special inspection requirement — Energy Code Compliance Inspections
Naeem Anwar
09/07/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Naeem Anwar
09/06/2022
Filed — Alteration
Plumbing work for accessory kitchen in the cellar and for a new lounge room in the first floor as per plans in conjunction with alteration CO application job # M00671544
M00784359-P1
08/18/2022
Permit issued — Plumbing
M00784359-I1-PL
08/10/2022
Permit issued — General Construction
M00671544-I1-GC
08/05/2022
Filed — Alteration
Plumbing work for accessory kitchen in the cellar and for a new lounge room in the first floor as per plans in conjunction with alteration CO application job # M00671544
M00784359-I1
06/24/2022
Filed — Alteration CO
Propose change of use at the Cellar level to add a multipurpose room and a accessory kitchen to serve the new lounge room at the First floor. No changes above the first floor as part of this application. To get new Certificate of occupancy.
M00671544-P1
06/09/2022
Cycle 8 facade report signed — SWARMP
05/17/2022
Cycle 8 facade report submitted
05/03/2022
Cycle 8 facade inspection completed
05/02/2022
Permit issued — General Construction
M00671544-I1-GC
03/14/2022
Objection raised — Accessibility
03/14/2022
Objection resolved — Addressed
Latest 60 of 154 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offGamcny01/04/2023
DOB NOWPlumbingSigned-offNew York Standard Mechanical08/18/2022
DOB NOWGeneral ConstructionPermit IssuedBuild Up Restoration08/10/2022
DOB NOWGeneral ConstructionPermit IssuedBuild Up Restoration05/02/2022
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR08/04/2021
DOB NOWPlumbingSigned-offAriana Contracting02/22/2021
DOB NOWPlumbingSigned-offAriana Contracting02/22/2021
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR10/22/2020
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR08/09/2020
DOB NOWPlumbingSigned-offMax P & H07/29/2020
DOB NOWPlumbingSigned-offMax P & H03/20/2020
DOB NOWPlumbingSigned-offMax P & H12/03/2019
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR08/07/2019
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR11/01/2018
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR10/26/2018
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR03/13/2018
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR12/19/2017
BISSDISSUEDNew York Standard Mechanical Co10/11/2022
BISPLISSUEDNew York Standard Mechanical07/19/2022
BISOTISSUEDStandard Waterproofing03/28/2022
BISOTISSUEDBuild Up Restoration08/17/2021
BISOTISSUEDBuild Up Restoration08/17/2021
BISOTISSUEDBuild Up Restoration08/17/2021
BISOTISSUEDBuild Up Restoration08/17/2021
BISOTISSUEDBuild Up Restoration08/17/2021
BISOTISSUEDBuild Up Restoration08/17/2021
BISSDISSUEDAriana Contracting04/16/2021
BISPLISSUEDAriana Contracting04/01/2021
BISPLISSUEDAriana Contracting04/01/2021
BISPLISSUEDAriana Contracting03/08/2021
BISOTISSUEDStandard Waterproofing03/03/2021
BISOTISSUEDBuild Up Restoration01/14/2021
BISOTISSUEDBuild Up Restoration01/14/2021
BISOTISSUEDBuild Up Restoration01/14/2021
BISOTISSUEDBuild Up Restoration01/14/2021
BISOTISSUEDBuild Up Restoration01/14/2021
BISOTISSUEDBuild Up Restoration01/14/2021
BISOTISSUEDStandard Waterproofing08/21/2020
BISSPISSUEDThe Right Connection P&H06/30/2020
BISPLISSUEDThe Right Connection P&H06/30/2020
+ 27 more permits on file
3 projects · most recent 06/19/2023
General Wiring
FiledStatusContractorScope
06/19/2023CompleteMax Electric CoGeneral Wiring
07/12/2022CompleteMax Electric CoGeneral Wiring
12/15/2017CompleteElpo Electrical Contg—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
11/28/2022Pass-Final CND-Occupancy InspectionPassView ↗
10/10/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/06/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/06/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
08/31/2026Energy Code Compliance InspectionsOSCAR FUERTESprogress
08/31/2026Fire-Resistance Rated ConstructionOSCAR FUERTESprogress
08/31/2026Interior lighting powerOSCAR FUERTESenergy_progress
08/31/2026Lighting controlsOSCAR FUERTESenergy_progress
08/31/2026Fire-Resistant Penetrations and JointsOSCAR FUERTESspecial
08/03/2026Fire-Resistance Rated ConstructionOSCAR FUERTESprogress
08/03/2026Interior lighting powerOSCAR FUERTESenergy_progress
08/03/2026Lighting controlsOSCAR FUERTESenergy_progress
08/03/2026Fire-Resistant Penetrations and JointsOSCAR FUERTESspecial
08/03/2026Energy Code Compliance InspectionsOSCAR FUERTESprogress
08/26/2023Fire-Resistance Rated ConstructionOSCAR FUERTESprogress
08/26/2023Lighting controlsOSCAR FUERTESenergy_progress
08/26/2023Interior lighting powerOSCAR FUERTESenergy_progress
08/26/2023Fire-Resistant Penetrations and JointsOSCAR FUERTESspecial
08/26/2023Energy Code Compliance InspectionsOSCAR FUERTESprogress
06/16/2023Energy Code Compliance InspectionsOSCAR FUERTESprogress
06/16/2023Interior lighting powerOSCAR FUERTESenergy_progress
06/16/2023Lighting controlsOSCAR FUERTESenergy_progress
06/16/2023Fire-Resistant Penetrations and JointsOSCAR FUERTESspecial
06/16/2023Fire-Resistance Rated ConstructionOSCAR FUERTESprogress
12/21/2022HVAC-R and service water piping design and insulationNaeem Anwarenergy_progress
12/21/2022HVAC-R and service water heating equipmentNaeem Anwarenergy_progress
12/21/2022Maintenance informationNaeem Anwarenergy_progress
12/21/2022HVAC-R and service water heating system controlsNaeem Anwarenergy_progress
12/21/2022Tenant Protection Plan ComplianceNaeem Anwarspecial
Latest 25 of 34.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Empire Hospitality-WallaceHotel / LodgingCellar, Floor 1, Roof
Project M00800044 Alteration · LOC Issued · 12/21/2022
Project M00784359 Alteration · LOC Issued · 08/05/2022
Mille-feuille BakeryCafeRestaurant / Food ServiceCellar, Floors 1–6
Project M00671544 Alteration CO · Permit Entire · 03/10/2022
New York HotelHotel / LodgingCellar, Floor 1
Project M00412019 Alteration · LOC Issued · 10/12/2020
Project M00276102 Alteration · LOC Issued · 03/17/2020
Project M00272626 Alteration · LOC Issued · 12/02/2019
Project M00005998 Alteration · LOC Issued · 12/15/2017
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 622 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch10
09/06/2026M00005998-I1Request digital key ↗
09/02/2026M00784359-P1Request digital key ↗
09/02/2026M00784359-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed4
09/06/2026M00005998-I1Request digital key ↗
09/04/2026M00412019-I1Request digital key ↗
08/15/2026M00005998-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00272626-I1Request digital key ↗
09/05/2026M00276102-I1Request digital key ↗
▸Applications & Permits149
▸BISPLAN / WORK APPROVAL APPLICATION75
02/27/2023140879397Open ↗
02/08/2023140879057Open ↗
01/27/2023123170781Open ↗
Showing 3 of 75 on file for this type
▸BISWORK PERMIT APPLICATION59
10/12/2022123170781Open ↗
07/19/2022123170852Open ↗
04/16/2021123170781Open ↗
Showing 3 of 59 on file for this type
▸DOB NOWLPC Approval/Permit12
10/04/2026M00671544-P6Open ↗
09/05/2026M00272626-I1Open ↗
08/28/2026M00671544-P5Open ↗
Showing 3 of 12 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
08/04/2022123170781Open ↗
▸Seals & Professional Certifications108
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION27
03/06/2020123170861Open ↗
03/06/2020123170861Open ↗
03/06/2020123170861Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWProgress Inspector Seal & Signature23
10/04/2026M00671544-P6Open ↗
10/04/2026M00671544-P6Open ↗
10/04/2026M00671544-P6Open ↗
Showing 3 of 23 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST16
01/05/2023123170852Open ↗
08/04/2022123170781Open ↗
04/06/2022123170781Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
10/04/2026M00671544-P6Open ↗
09/06/2026M00005998-P1Open ↗
09/06/2026M00005998-I1Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT12
12/03/2019140879397Open ↗
Showing 1 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
10/04/2026M00671544-P6Open ↗
08/30/2026M00671544-P3Open ↗
08/27/2026M00800044-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
12/03/2019140879397Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
12/03/2019140879397Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment56
▸BISEQUIPMENT USE PERMITS15
03/06/2020123170861Open ↗
03/06/2020123170861Open ↗
03/06/2020123170861Open ↗
Showing 3 of 15 on file for this type
▸BISSCHEDULE B - PLUMBING11
12/16/2022123170852Open ↗
09/20/2022123170852Open ↗
08/09/2022123170781Open ↗
Showing 3 of 11 on file for this type
▸BISSELF-CERT PLUMBING NOTICE8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT7
03/09/2020123170861Open ↗
03/06/2020123170861Open ↗
03/06/2020123170861Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA5
05/31/2022123144917Open ↗
Showing 1 of 5 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
10/12/2022123170781Open ↗
▸BISSPRINKLER SYSTEMS1
01/31/2022123170781Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTANDPIPE SYSTEMS1
01/31/2022123170781Open ↗
▸Safety & Tenant Protection24
▸BISTenant Protection Plan and Notes12
11/26/2021122998998Open ↗
12/03/2019140879397Open ↗
Showing 2 of 12 on file for this type
▸DOB NOWStreet Tree Checklist7
10/04/2026M00671544-P6Open ↗
08/28/2026M00671544-P5Open ↗
08/13/2026M00671544-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWTenant Protection Plan4
09/05/2026M00272626-I1Open ↗
08/13/2026M00276102-I1Open ↗
08/13/2026M00412019-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos27
▸BISASBESTOS: CERTIFICATION (DEP ACP5)12
12/03/2019140879397Open ↗
Showing 1 of 12 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
10/04/2026M00671544-P6Open ↗
09/05/2026M00272626-I1Open ↗
09/05/2026M00276102-I1Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance50
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY13
02/27/2023140879397Open ↗
02/06/2023121237820Open ↗
06/28/2022123170852Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
03/06/2020123170861Open ↗
Showing 1 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
02/06/2023121237820Open ↗
04/13/2022123547787Open ↗
10/25/2021140879397Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)7
02/27/2023140879057Open ↗
02/27/2023140879397Open ↗
02/06/2023121237820Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
12/03/2019140879397Open ↗
Showing 1 of 2 on file for this type
▸BISINTERIOR LIGHTING POWER2
02/27/2023140879057Open ↗
12/02/2021122857373Open ↗
▸BISNYCECC ANALYSIS2
12/03/2019140879397Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026M00671544-I1Open ↗
08/13/2026M00784359-I1Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
01/24/2023123170852Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00800044-I1Open ↗
▸Inspections & Test Reports22
▸BISTECHNICAL REPORT: RESPONSIBILITY21
02/27/2023140879057Open ↗
02/27/2023140879397Open ↗
02/06/2023121237820Open ↗
Showing 3 of 21 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
12/02/2021122857373Open ↗
▸Approvals, Objections & Sign-offs71
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST26
03/01/2023140879057Open ↗
03/01/2023140879397Open ↗
02/21/2023123170781Open ↗
Showing 3 of 26 on file for this type
▸BISLANDMARKS APPROVAL11
02/27/2023140879397Open ↗
12/03/2019140879397Open ↗
Showing 2 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION11
04/06/2022123170781Open ↗
Showing 1 of 11 on file for this type
▸BISLANDMARKS SIGNOFF8
03/01/2023140879057Open ↗
03/01/2023140879397Open ↗
01/30/2023123170781Open ↗
Showing 3 of 8 on file for this type
▸BISSUPERSEDING LETTER6
07/19/2022123170852Open ↗
04/16/2021123170781Open ↗
04/16/2021123170781Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership37
▸BISCOST AFFIDAVIT27
01/03/2023123144917Open ↗
04/13/2022123547787Open ↗
01/10/2022123547787Open ↗
Showing 3 of 27 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW39
02/27/2023140879057Open ↗
02/27/2023140879397Open ↗
02/06/2023121237820Open ↗
Showing 3 of 9 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms46
▸BISEFILING COVER SHEET19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISADDITIONAL INFORMATION17
01/27/2023123170781Open ↗
11/10/2022123170781Open ↗
09/22/2022123170852Open ↗
Showing 3 of 17 on file for this type
▸BISBOROUGH INTAKE FORM8
04/16/2021123170781Open ↗
04/16/2021123170781Open ↗
03/06/2020123170861Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
12/03/2019140879397Open ↗
Showing 1 of 2 on file for this type
▸Other Documents16
▸DOB NOWProperty Ownership Certification7
10/04/2026M00671544-P6Open ↗
08/28/2026M00671544-P1Open ↗
08/28/2026M00671544-P2Open ↗
Showing 3 of 7 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWBSA Meeting Minutes/BSA Resolution2
09/06/2026M00005998-I1Open ↗
08/13/2026M00005998-P1Open ↗
▸BISPlot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISMDL1 - Reg of Dwelling Units (MDL 67/120)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type