← Back
Two family frame
2422 CAMBRELENG AVENUE
BRONX · Belmont · BIN 2012538
💬 Discuss this project
1920Year Built
2Stories
B2Building Class
R6Zoning
1,120 sfGross Floor Area
2Units
Rent Stabilized2 Open Violations ▸
Two family frame · Owner of record: CAMBRELENG BH LLC · 1,320 sf lot · 0.85 FAR built · Flood zone X
Locations of Work
Plumbing
Cellar2p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CAMBRELENG BH LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/17/2024$475K—Private party → CAMBRELENG BH LLC$424/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VIBRANCY CONSULTING CORPORATION311/06/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CAPE PLUMBING INCPlumbing106/28/2026
Building Lifecycle
All (21)Filed (3)Permit Issued (1)Violation (14)Inspection (3)
05/30/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/15/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/24/2025
Violation issued (HPD, closed)
I
11/06/2025
Filed — Alteration
Replacement of existing hot water heaters and boilers. No change of use and egress.
X01138245-P2
10/05/2025
Filed — Alteration
Replacement of existing hot water heaters and boilers. No change of use and egress.
X01138245-P1
09/15/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/25/2025
Permit issued — Plumbing
X01138245-I1-PL
12/16/2024
Filed — Alteration
Replacement of existing hot water heaters and boilers. No change of use and egress.
X01138245-I1
12/03/2024
Violation issued (HPD, closed)
I
09/23/2021
Violation issued (HPD, closed)
I
09/21/2021
Violation issued (HPD, closed)
C
09/21/2021
Violation issued (HPD, closed)
C
09/21/2021
Violation issued (HPD, closed)
A
09/21/2021
Violation issued (HPD, closed)
B
09/21/2021
Violation issued (HPD, closed)
B
09/21/2021
Violation issued (HPD, closed)
B
09/21/2021
Violation issued (HPD, closed)
B
09/21/2021
Violation issued (HPD, open)
C
09/21/2021
Violation issued (HPD, open)
C
09/21/2021
Violation issued (HPD, closed)
A
09/21/2021
Violation issued (HPD, closed)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedCAPE PLUMBING INC06/25/2025
1 project · most recent 11/06/2025
Gas Water/Sanitary
FiledStatusContractorScope
11/06/2025Permit IssuedCAPE PLUMBING INCGas, Water/Sanitary
1 project · most recent 04/17/2024
FiledStatusContractorScope
04/17/2024Permit IssuedUL ELECTRICAL CORP.3 meters, 3 new_meters
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
05/30/2026Pass-Final General Construction Non-Directive 14PassView ↗
04/15/2026Fail-Final General Construction Non-Directive 14FailView ↗
09/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/20/2026X01138245-I1Request digital key ↗
08/20/2026X01138245-P2Request digital key ↗
08/20/2026X01138245-P1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/20/2026X01138245-I1Open ↗
08/20/2026X01138245-P1Open ↗
08/13/2026X01138245-P2Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/20/2026X01138245-I1Open ↗
08/20/2026X01138245-P1Open ↗
08/13/2026X01138245-P2Open ↗