← Back
BuildNYC
Over six families without stores
2422 UNIVERSITY AVENUE
BRONX · BIN 2014626
💬 Discuss this project
1912Year Built
5Stories
C1Building Class
R6Zoning
15,515 sfGross Floor Area
12Units
Rent Stabilized52 Active Violations ▸
Over six families without stores · Owner of record: A & R Unity Management · 7,181 sf lot · 2.16 FAR built · Flood zone X
Locations of Work
Mechanical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Cellar4p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
A & R Unity Management103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
New York & Company102/27/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
New York & Company203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
New York Engineering Associates851102/27/2024
Building Lifecycle
09/30/2026
Boiler inspection report filed
Initial · defects found · Accepted
07/19/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE KEY OPERATED LOCK SET AT BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st STORY
HPD violation · open
04/30/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
12/12/2025
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND SOUTH WALL IN THE PRIVATE HALLWAY…
HPD violation · open
12/12/2025
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTH WALL IN THE KITCHEN LOCATED…
HPD violation · open
217 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offDMT Plumbing & Heating03/08/2024
BISBLISSUEDNeal M Rudikoff/Kook Maintenance07/01/1996
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
05/24/2024Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
02/07/2024Tenant Protection Plan ComplianceLOUIS ARENAspecial
01/17/2024Heating SystemsLOUIS ARENAspecial
01/17/2024HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
01/17/2024Maintenance informationLOUIS ARENAenergy_progress
01/17/2024HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
01/17/2024HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
9 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account