← Back
BuildNYC
Public elementary, junior or senior high
2424 BATCHELDER STREET
BROOKLYN · BIN 3203617
💬 Discuss this project
1951Year Built
3Stories
W1Building Class
R5Zoning
132,100 sfGross Floor Area
0Units
LL97 Covered10 Active Violations 0 unresolved · 10 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 102,900 sf lot · 1.28 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofJ.H.S. 014 Shell BankUnder Construction17p · 1 filing · 20 docs
PenthouseJ.H.S. 014 Shell BankUnder Construction1p · 1 filing · 20 docs
Floor 3J.H.S. 014 Shell BankUnder Construction15p · 1 filing · 20 docs
Floor 2
Floor 1J.H.S. 014 Shell Bank, Shellbank Intermediate SchoolUnder Construction14p · 4 filings · 20 docs
BasementJ.H.S. 014 Shell BankUnder Construction2p · 1 filing · 20 docs
Sub-BasementJ.H.S. 014 Shell BankUnder Construction2p · 2 filings · 20 docs
Site & exteriorJ.H.S. 014 Shell BankUnder Construction20p · 4 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority7007/08/2026
NYC Department of Education303/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK Consulting Services803/21/2026
Velocity Architecture & Engineering803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Yarks NYCScaffold1407/08/2026
A & S ElectricElectrical203/21/2026
Capital ProjectsGeneral Contractor207/08/2026
Prince ElectricElectrical103/21/2026
Clean Tech MechanicalPlumbing106/02/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Twin Peaks317408/18/2026
JPC Logistics Dba JPCL EN351307/07/2025
Building Lifecycle
All (24)Filed (13)Permit Issued (11)
08/18/2026
Filed — Alteration
Replace (1) Existing Area Drain Replace 5 LFT of 3" underground piping connected to drain to be replaced. Power-wash 20 LFT of storm piping, trench and backfill for the replacement of drain/associated piping. Demolish/replace concrete slab on grade.
B01020826-P3
05/07/2026
Permit issued — General Construction
B01020826-I1-GC
02/25/2026
Permit issued — Sidewalk Shed
B01136942-I1-SH
02/02/2026
Permit issued — Plumbing
B01020826-S1-PL
01/30/2026
Permit issued — Sidewalk Shed
B01136942-I1-SH
01/29/2026
Permit issued — Construction Fence
B01136933-I1-FN
01/29/2026
Permit issued — Supported Scaffold
B01136948-I1-SF
07/07/2025
Filed — Alteration
B01249398-I1
04/28/2025
Permit issued — General Construction
B01020826-I1-GC
04/17/2025
Filed — Alteration
Replace (1) Existing Area Drain Replace 5 LFT of 3" underground piping connected to drain to be replaced. Power-wash 20 LFT of storm piping, trench and backfill for the replacement of drain/associated piping. Demolish/replace concrete slab on grade.
B01020826-P2
04/17/2025
Filed — Alteration
Replace (1) Existing Area Drain Replace 5 LFT of 3" underground piping connected to drain to be replaced. Power-wash 20 LFT of storm piping, trench and backfill for the replacement of drain/associated piping. Demolish/replace concrete slab on grade.
B01020826-P1
03/11/2025
Permit issued — Protection and Mechanical Methods
B01150362-I1-PMM
02/19/2025
Filed — Alteration
B01150362-I1
01/27/2025
Permit issued — Supported Scaffold
B01136948-I1-SF
01/22/2025
Permit issued — Construction Fence
B01136933-I1-FN
01/22/2025
Permit issued — Sidewalk Shed
B01136942-I1-SH
11/13/2024
Filed — Alteration
B01136933-I1
11/13/2024
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD FOR IS 14K AT 2424 BATCHELDER STREET, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01136948-I1
11/13/2024
Filed — Alteration
B01136942-I1
03/18/2024
Filed — Alteration
Replace (1) Existing Area Drain Replace 5 LFT of 3" underground piping connected to drain to be replaced. Power-wash 20 LFT of storm piping, trench and backfill for the replacement of drain/associated piping. Demolish/replace concrete slab on grade.
B01020826-I1
03/18/2024
Filed — Alteration
Replace (1) Existing Area Drain Replace 5 LFT of 3" underground piping connected to drain to be replaced. Power-wash 20 LFT of storm piping, trench and backfill for the replacement of drain/associated piping. Demolish/replace concrete slab on grade.
B01020826-S1
07/25/2022
Filed — No Work
B00778927-I1
11/18/2021
Filed — Alteration
AUDITORIUM UPGRADE TO COMPLY WITH ADA REQUIREMENTS. WILL PROVIDE ACCESSIBLE AND COMPANION SEATING AND NEW FINISHES. WILL BE INSTALLING CONCRETE PAD AND CURB , AND NEW STAGE STAIR RAILINGS.
B00629794-I1
06/18/2021
Filed — Alteration
B00542378-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCapital Projects05/07/2026
DOB NOWSidewalk ShedPermit IssuedYarks NYC02/25/2026
DOB NOWPlumbingPermit IssuedClean Tech Mechanical02/02/2026
DOB NOWSidewalk ShedPermit IssuedYarks NYC01/30/2026
DOB NOWConstruction FencePermit IssuedYarks NYC01/29/2026
DOB NOWSupported ScaffoldPermit IssuedYarks NYC01/29/2026
DOB NOWGeneral ConstructionPermit IssuedCapital Projects04/28/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedYarks NYC03/11/2025
DOB NOWSupported ScaffoldPermit IssuedYarks NYC01/27/2025
DOB NOWConstruction FencePermit IssuedYarks NYC01/22/2025
DOB NOWSidewalk ShedPermit IssuedYarks NYC01/22/2025
BISSPISSUEDLeviathan Mechanical07/28/2025
BISBLISSUEDLeviathan Mechanical07/28/2025
BISPLISSUEDLeviathan Mechanical07/28/2025
BISPLISSUEDLeviathan Mechanical07/28/2025
BISPLISSUEDLeviathan Mechanical03/16/2022
BISPLISSUEDLeviathan Mechanical03/16/2022
BISBLISSUEDLeviathan Mechanical03/16/2022
BISSPISSUEDLeviathan Mechanical03/16/2022
BISBLISSUEDLeviathan Mechanical10/16/2020
BISPLISSUEDLeviathan Mechanical10/16/2020
BISPLISSUEDLeviathan Mechanical10/16/2020
BISOTISSUEDLeviathan Mechanical10/15/2020
BISOTISSUEDLeviathan Mechanical10/15/2020
BISMHISSUEDLO Sardo General Contractors10/15/2020
BISOTISSUEDLeviathan Mechanical10/15/2020
BISFPISSUEDChief Fire Prev. & Mechanical Co12/03/2019
BISSPISSUEDLeviathan Mechanical11/13/2019
BISPLISSUEDLeviathan Mechanical11/13/2019
BISMHISSUEDLeviathan Mechanical09/19/2019
BISOTISSUEDLeviathan Mechanical09/19/2019
BISOTISSUEDLeviathan Mechanical09/19/2019
BISOTISSUEDLeviathan Mechanical09/19/2019
BISPLISSUEDLeviathan Mechanical09/13/2019
BISEQISSUEDLeviathan Mechanical10/22/2018
BISOTISSUEDLeviathan Mechanical09/21/2018
BISOTISSUEDLeviathan Mechanical09/21/2018
BISOTISSUEDLeviathan Mechanical09/21/2018
BISMHISSUEDLeviathan Mechanical09/21/2018
BISOTISSUEDLeviathan Mechanical09/21/2018
+ 21 more permits on file
1 project · most recent 08/18/2026
Storm
FiledStatusContractorScope
08/18/2026Permit IssuedClean Tech MechanicalStorm
12 projects · most recent 06/12/2026
General Wiring
FiledStatusContractorScope
06/12/2026Permit IssuedA & S ElectricGeneral Wiring
06/25/2025CompleteEverest Electric—
03/20/2025Permit IssuedPacific Electrical Contracting—
01/09/2025Permit IssuedLit Mode Electrical Contg—
05/09/2024CompleteTitan Electrical & Elev Contracting—
09/26/2023Permit IssuedAce Electrical ConstructionGeneral Wiring
06/03/2022CompleteAbm Electric—
10/27/2020CompleteHexagon Construction & Electrical GroupGeneral Wiring
10/28/2019CompleteCharan Electrical Enterp's—
07/09/2018CompleteCharan Electrical Enterp's—
05/10/2018CompleteCharan Electrical Enterp's—
01/23/2018CompleteCharan Electrical Enterp's—
1 project · most recent 11/18/2021
Concrete
FiledStatusContractorScope
11/18/2021——Concrete
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
05/26/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
08/24/2026Structural Stability – Alterations of existing buildingsMIKHAIL ZEYGMANspecial
08/24/2026Concrete - Cast-In-PlaceMIKHAIL ZEYGMANspecial
08/24/2026MasonryMIKHAIL ZEYGMANspecial
04/17/2025Structural Stability – Alterations of existing buildingsMIKHAIL ZEYGMANspecial
04/17/2025Concrete - Cast-In-PlaceMIKHAIL ZEYGMANspecial
04/17/2025Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
04/17/2025MasonryMIKHAIL ZEYGMANspecial
12/21/2021Post-installed AnchorsAsma Hashmispecial
11/12/2021Concrete - Cast-In-PlaceAsma Hashmispecial
11/11/2021Final—progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
J.H.S. 014 Shell BankEducationSub-basement, Floors 1, 3, Roof
Project B01150362 Alteration · Permit Entire · 02/19/2025
Project B01136933 Alteration · Permit Entire · 11/13/2024
Project B01136942 Alteration · Permit Entire · 11/13/2024
Project B01136948 Alteration · Permit Entire · 11/13/2024
Project B01020826 Alteration · Permit Entire · 03/18/2024
Shellbank Intermediate SchoolEducationFloor 1
Project B00542378 Alteration · Approved · 06/18/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 87 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch14
09/01/2026B00542378-I1Request digital key ↗
08/25/2026B01020826-P3Request digital key ↗
08/25/2026B01020826-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/29/2026B00778927-I1Request digital key ↗
▸Seals & Professional Certifications24
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/01/2026B00542378-I1Open ↗
08/29/2026B00778927-I1Open ↗
08/25/2026B01020826-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/02/2026B01020826-I1Open ↗
09/02/2026B01020826-I1Open ↗
09/02/2026B01020826-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/29/2026B00629794-I1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWNYCSCA - Approved Site Safety Plans3
08/13/2026B01136933-I1Open ↗
08/13/2026B01136942-I1Open ↗
08/13/2026B01136948-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/21/2026B01020826-S1Open ↗
08/21/2026B01020826-I1Open ↗
08/21/2026B01020826-P2Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs26
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter13
09/01/2026B00542378-I1Open ↗
08/29/2026B00778927-I1Open ↗
08/22/2026B01150362-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)11
08/20/2026B01020826-P3Open ↗
08/13/2026B00542378-I1Open ↗
08/13/2026B00629794-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
08/13/2026B01020826-S1Open ↗
08/13/2026B01020826-I1Open ↗
▸Other Documents14
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal14
08/25/2026B01020826-P3Open ↗
08/25/2026B01020826-I1Open ↗
08/20/2026B01020826-P3Open ↗
Showing 3 of 14 on file for this type