← Back
One family attached or semi-detached
2424 CORTELYOU ROAD
BROOKLYN · BIN 3119002
💬 Discuss this project
1925Year Built
2Stories
A5Building Class
R6Zoning
1,600 sfGross Floor Area
1Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · 1,694 sf lot · 0.94 FAR built · Flood zone X
Locations of Work
ArchitectureOther
Roof1p · 1 filing · 6 docs
Floor 11p · 1 filing · 17 docs
Cellar2p · 1 filing · 17 docs
1 job · most recent 11/18/2025
FiledStatusContractorScope
11/18/2025CompleteL.D.M. ELECTL CONTRS INC—
1 job · most recent 11/24/2025
FiledStatusContractorScope
11/24/2025Signed-offTHE GREEN PLUG LLC34 panels, 14.62 kw, 828.06 roof_area_sqft
Building Lifecycle
All (42)Filed (5)Permit Issued (5)Signed Off (4)Violation (1)Inspection (4)Objection (4)Special Inspection (19)
08/21/2026
Signed off — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOFTOP. NO CHANGES TO EGRESS OR USE OF OCCUPANCY.
B01323122-I1
12/02/2025
Permit issued — Solar
B01323122-I1-SL
11/24/2025
Filed — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOFTOP. NO CHANGES TO EGRESS OR USE OF OCCUPANCY.
B01323122-I1
11/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
11/21/2025
Special inspection requirement — Final
TOM PETERSEN
11/21/2025
Special inspection requirement — Energy Code Compliance Inspections
TOM PETERSEN
10/01/2024
Signed off — Alteration
CELLAR RENOVATION TO EXISTING ONE-FAMILY. DEMOLISH AND CONSTRUCT NON-LOAD-BEARING PARTITIONS, WINDOWS, DOORS. CONTRUCT NEW 3-PIECE BATHROOM PER BB 2011-10. RELATED MINOR MECH WORK TO INSTALL BATHROOM EXHAUST. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00843018-I1
10/01/2024
Signed off — Alteration
PLUMBING WORK FILED IN CONJUCTION WITH CELLAR REVOVATION OF EXISTING ONE-FAMILY RESIDENCE. INSTALL NEW FLOOR DRAIN, SLOP SINK, BATHROOM FIXTURES AND RELATED PIPING.
B00843116-I1
06/17/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/13/2024
Signed off — Alteration
STRUCTURAL/FOUNDATION WORK FILED IN CONJUCTION WITH CELLAR REVOVATION TO EX. 1-FAMILY. NEW BENCH FOOTING & ISOLATED FOOTINGS AT CELLAR. SELECT REINFORCEMENT/REPLACEMENT OF EX'G FRAMING. NEW CONCRETE SLAB. NEW STEEL COLUMN AT 1ST FLOOR FRAMIN
B00843143-I1
02/09/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/06/2024
Objection raised — Other
02/06/2024
Objection resolved — Addressed
02/01/2024
Filed — Alteration
STRUCTURAL/FOUNDATION WORK FILED IN CONJUCTION WITH CELLAR REVOVATION TO EX. 1-FAMILY. NEW BENCH FOOTING & ISOLATED FOOTINGS AT CELLAR. SELECT REINFORCEMENT/REPLACEMENT OF EX'G FRAMING. NEW CONCRETE SLAB. NEW STEEL COLUMN AT 1ST FLOOR FRAMIN
B00843143-P1
01/09/2024
Permit issued — General Construction
B00843018-I1-GC-CX
12/04/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/28/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/14/2023
Permit issued — Plumbing
B00843116-I1-PL
11/08/2023
Permit issued — Foundation
B00843143-I1-GC-CX
11/06/2023
Permit issued — Mechanical Systems
B00843018-I1-GC-CX
06/19/2023
Filed — Alteration
STRUCTURAL/FOUNDATION WORK FILED IN CONJUCTION WITH CELLAR REVOVATION TO EX. 1-FAMILY. NEW BENCH FOOTING & ISOLATED FOOTINGS AT CELLAR. SELECT REINFORCEMENT/REPLACEMENT OF EX'G FRAMING. NEW CONCRETE SLAB. NEW STEEL COLUMN AT 1ST FLOOR FRAMIN
B00843143-I1
05/18/2023
Objection raised — Scope
05/18/2023
Objection resolved — Addressed
05/10/2023
Filed — Alteration
CELLAR RENOVATION TO EXISTING ONE-FAMILY. DEMOLISH AND CONSTRUCT NON-LOAD-BEARING PARTITIONS, WINDOWS, DOORS. CONTRUCT NEW 3-PIECE BATHROOM PER BB 2011-10. RELATED MINOR MECH WORK TO INSTALL BATHROOM EXHAUST. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00843018-I1
05/10/2023
Filed — Alteration
PLUMBING WORK FILED IN CONJUCTION WITH CELLAR REVOVATION OF EXISTING ONE-FAMILY RESIDENCE. INSTALL NEW FLOOR DRAIN, SLOP SINK, BATHROOM FIXTURES AND RELATED PIPING.
B00843116-I1
04/24/2023
Special inspection requirement — Air barrier - visual inspection
KELLEY SURUN
04/24/2023
Special inspection requirement — Fenestration areas
KELLEY SURUN
04/18/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
KELLEY SURUN
04/10/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
KELLEY SURUN
04/10/2023
Special inspection requirement — Energy Code Compliance Inspections
KELLEY SURUN
04/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
KELLEY SURUN
03/13/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
KELLEY SURUN
03/13/2023
Special inspection requirement — Fenestration air leakage
KELLEY SURUN
03/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
KELLEY SURUN
03/13/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
KELLEY SURUN
03/13/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
KELLEY SURUN
03/13/2023
Special inspection requirement — Final
KELLEY SURUN
03/13/2023
Special inspection requirement — Energy Code Compliance Inspections
KELLEY SURUN
03/13/2023
Special inspection requirement — Fire-Resistance Rated Construction
KELLEY SURUN
03/13/2023
Special inspection requirement — Interior lighting power
KELLEY SURUN
03/13/2023
Special inspection requirement — Mechanical Systems
KELLEY SURUN
01/09/2018
Violation issued (HPD, closed)
I
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
REVERSE MORTGAGE SOLUTIONS203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/14/2018$895K—Private party → Private party$559/sf building
11/03/2017$575K—Private party → Private party$359/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ANZALONE ARCHITECTURE803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HOME IMPRO SERVS GRP INCGeneral Contractor507/08/2026
THE GREEN PLUG LLCGeneral Contractor104/09/2026
PRACTICAL PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THOMAS PETERSEN ARCHITECT7854111/24/2025
CELIN MUNOZ CONSULTING EN1064202/01/2024
PATH PLACE ARCHITECTURE8396205/10/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offTHE GREEN PLUG LLC12/02/2025
DOB NOWGeneral ConstructionSigned-offHOME IMPRO SERVS GRP01/09/2024
DOB NOWPlumbingSigned-offPRACTICAL PLBG & HTG INC11/14/2023
DOB NOWFoundationSigned-offHOME IMPRO SERVS GRP11/08/2023
DOB NOWMechanical SystemsSigned-offHOME IMPRO SERVS GRP11/06/2023
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
06/17/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/09/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/04/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/28/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
11/21/2025Fire-Resistant Penetrations and JointsTOM PETERSENspecial
11/21/2025FinalTOM PETERSENprogress
11/21/2025Energy Code Compliance InspectionsTOM PETERSENprogress
04/24/2023Air barrier - visual inspectionKELLEY SURUNenergy_progress
04/24/2023Fenestration areasKELLEY SURUNenergy_progress
04/18/2023HVAC-R and service water piping design and insulationKELLEY SURUNenergy_progress
04/10/2023HVAC-R and service water piping design and insulationKELLEY SURUNenergy_progress
04/10/2023Energy Code Compliance InspectionsKELLEY SURUNprogress
04/10/2023Fire-Resistant Penetrations and JointsKELLEY SURUNspecial
03/13/2023Fenestration and door U-factor and product ratingsKELLEY SURUNenergy_progress
03/13/2023Fenestration air leakageKELLEY SURUNenergy_progress
03/13/2023Fire-Resistant Penetrations and JointsKELLEY SURUNspecial
03/13/2023Construction Operations Influencing Adjacent StructuresKELLEY SURUNspecial
03/13/2023Structural Stability – Alterations of existing buildingsKELLEY SURUNspecial
03/13/2023FinalKELLEY SURUNprogress
03/13/2023Energy Code Compliance InspectionsKELLEY SURUNprogress
03/13/2023Fire-Resistance Rated ConstructionKELLEY SURUNprogress
03/13/2023Interior lighting powerKELLEY SURUNenergy_progress
03/13/2023Mechanical SystemsKELLEY SURUNspecial
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/27/2026B00843116-I1Request digital key ↗
08/27/2026B00843143-I1Request digital key ↗
08/19/2026B01323122-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026B00843116-I1Open ↗
08/13/2026B00843018-I1Open ↗
▸Seals & Professional Certifications24
▸DOB NOWProgress Inspector Seal & Signature13
08/23/2026B00843116-I1Open ↗
08/23/2026B00843116-I1Open ↗
08/22/2026B00843018-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/23/2026B00843116-I1Open ↗
08/22/2026B00843018-I1Open ↗
08/22/2026B00843018-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026B00843018-I1Open ↗
08/27/2026B00843143-I1Open ↗
08/13/2026B00843143-P1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026B00843143-I1Open ↗
08/14/2026B00843018-I1Open ↗
08/13/2026B01323122-I1Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/27/2026B00843143-I1Open ↗
08/13/2026B00843143-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00843143-I1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026B00843143-I1Open ↗