Roof16p · 3 filings · 20 docs
ArchitectureEquipmentFire ProtectionMechanicalPlumbingStructural
INSTALLATION OF 300PSF SIDEWALK SHED AND ROOF PROTECTION AS PER PLANS. TEMPORARY EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE 2022. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
On file for this project
4 documents · 1 drawing sheet
Installation of sprinkler/ standpipe system as per plans. Filed in connection with NB# 321601263.
On file for this project
159 documents · 13 drawing sheets
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
14 documents · 2 drawing sheets
Bulkhead2p · 1 filing · 20 docs
ArchitecturePlumbing
Installation of sprinkler/ standpipe system as per plans. Filed in connection with NB# 321601263.
On file for this project
159 documents · 2 drawing sheets
Floor 111p · 1 filing · 20 docs
Plumbing
Installation of sprinkler/ standpipe system as per plans. Filed in connection with NB# 321601263.
On file for this project
159 documents · 1 drawing sheet
Floor 1014p · 1 filing · 20 docs
ArchitectureMechanicalPlumbingStructural
Installation of sprinkler/ standpipe system as per plans. Filed in connection with NB# 321601263.
On file for this project
159 documents · 14 drawing sheets
Floor 98p · 1 filing · 20 docs
ArchitectureMechanicalPlumbingStructural
Installation of sprinkler/ standpipe system as per plans. Filed in connection with NB# 321601263.
On file for this project
159 documents · 8 drawing sheets
Floor 87p · 1 filing · 20 docs
ArchitectureMechanicalPlumbingStructural
Installation of sprinkler/ standpipe system as per plans. Filed in connection with NB# 321601263.
On file for this project
159 documents · 7 drawing sheets
Floor 77p · 1 filing · 20 docs
ArchitectureMechanicalPlumbingStructural
Installation of sprinkler/ standpipe system as per plans. Filed in connection with NB# 321601263.
On file for this project
159 documents · 7 drawing sheets
Floor 67p · 1 filing · 20 docs
ArchitectureMechanicalPlumbingStructural
Installation of sprinkler/ standpipe system as per plans. Filed in connection with NB# 321601263.
On file for this project
159 documents · 7 drawing sheets
Floor 57p · 1 filing · 20 docs
ArchitectureMechanicalPlumbingStructural
Installation of sprinkler/ standpipe system as per plans. Filed in connection with NB# 321601263.
On file for this project
159 documents · 7 drawing sheets
Floor 47p · 1 filing · 20 docs
ArchitectureMechanicalPlumbingStructural
Installation of sprinkler/ standpipe system as per plans. Filed in connection with NB# 321601263.
On file for this project
159 documents · 7 drawing sheets
Floor 36p · 1 filing · 20 docs
ArchitecturePlumbingStructural
Installation of sprinkler/ standpipe system as per plans. Filed in connection with NB# 321601263.
On file for this project
159 documents · 6 drawing sheets
Floor 27p · 1 filing · 20 docs
ArchitecturePlumbingStructural
Installation of sprinkler/ standpipe system as per plans. Filed in connection with NB# 321601263.
On file for this project
159 documents · 7 drawing sheets
Floor 110p · 1 filing · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Installation of sprinkler/ standpipe system as per plans. Filed in connection with NB# 321601263.
On file for this project
159 documents · 10 drawing sheets
Cellar20p · 2 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
CONSTRUCTION OF TEMPORARY CONSTRUCTION SHANTY AS PER DRAWINGS. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
Installation of sprinkler/ standpipe system as per plans. Filed in connection with NB# 321601263.
On file for this project
159 documents · 20 drawing sheets