← Back
Two family brick
2425 PROSPECT AVENUE
BRONX · BIN 2012899
💬 Discuss this project
1901Year Built
2Stories
B1Building Class
R7-1Zoning
2,208 sfGross Floor Area
2Units
Rent Stabilized16 Open Violations ▸
Two family brick · Owner of record: 2425 PROSPECT AVE LLC · 1,765 sf lot · 1.25 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire ProtectionGeneral
Roof25p · 1 filing · 20 docs
Floor 259p · 1 filing · 20 docs
Floor 158p · 1 filing · 20 docs
Basement67p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MBSD LLC103/22/2026
BRIGHTSTONE DEVELOPERS303/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/31/2023$999K—Private party → 2425 PROSPECT MBSD LLC$452/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHOSEN MEP, CORP.307/08/2025
NIKOLAI KATZ ARCHITECT301/23/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES303/21/2026
EXPRESS FILING INC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMM GEN'L CONTRACTING.INCFire Protection107/08/2026
BH GENERAL CONTRACTING INGeneral Contractor107/08/2026
AMM GEN'L CONTRACTING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616607/08/2025
Building Lifecycle
All (123)Filed (6)Permit Issued (3)Violation (54)Inspection (10)Objection (20)Special Inspection (30)
07/17/2026
Violation issued (HPD, open)
A
07/17/2026
Violation issued (HPD, open)
B
12/14/2025
Violation issued (HPD, closed)
B
12/14/2025
Violation issued (ECB, open)
Construction
12/14/2025
Violation issued (HPD, open)
C
12/14/2025
Violation issued (HPD, closed)
B
12/14/2025
Violation issued (HPD, closed)
B
12/02/2025
Violation issued (HPD, closed)
C
12/02/2025
Violation issued (HPD, open)
B
12/02/2025
Violation issued (HPD, open)
B
12/02/2025
Violation issued (HPD, open)
B
12/02/2025
Violation issued (HPD, open)
B
11/24/2025
Violation issued (HPD, closed)
I
08/22/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
08/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
08/22/2025
Special inspection requirement — Seismic Isolation Systems
FAHAD FATEH
08/22/2025
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
08/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
08/22/2025
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
08/04/2025
Objection resolved — Addressed
07/28/2025
Objection raised — Other
07/08/2025
Filed — Alteration CO
PROPOSED CONVERSION TO AN EXISTING 3 STORY RESIDENTIAL BUILDING. EXISTING 2 UNITS PROPOSED TOTAL OF 10 RESIDENTIAL UNITS. NO CHANGE IN BULK. Please assign to development HUB, as this is the same scope of work and same applicant as adjacent building at 242
X00873105-P5
07/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
07/02/2025
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
07/02/2025
Special inspection requirement — Seismic Isolation Systems
FAHAD FATEH
07/02/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
07/02/2025
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
07/02/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
05/29/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/23/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/19/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
05/19/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/16/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
04/22/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
04/22/2025
Special inspection requirement — Metering
FAHAD FATEH
04/22/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
04/22/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
04/22/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
04/22/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
04/22/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
04/22/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
04/22/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
04/22/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
04/10/2025
Objection resolved — Addressed
04/10/2025
Objection resolved — Addressed
03/24/2025
Objection raised — Other
03/24/2025
Objection raised — Other
03/13/2025
Objection resolved — Addressed
02/04/2025
Objection raised — Other
01/29/2025
Objection resolved — Addressed
01/28/2025
Objection raised — Other
01/23/2025
Filed — Alteration CO
PROPOSED CONVERSION TO AN EXISTING 3 STORY RESIDENTIAL BUILDING. EXISTING 2 UNITS PROPOSED TOTAL OF 10 RESIDENTIAL UNITS. NO CHANGE IN BULK. Please assign to development HUB, as this is the same scope of work and same applicant as adjacent building at 242
X00873105-P2
01/16/2025
Filed — Alteration CO
PROPOSED CONVERSION TO AN EXISTING 3 STORY RESIDENTIAL BUILDING. EXISTING 2 UNITS PROPOSED TOTAL OF 10 RESIDENTIAL UNITS. NO CHANGE IN BULK. Please assign to development HUB, as this is the same scope of work and same applicant as adjacent building at 242
X00873105-P3
01/10/2025
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
01/10/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
01/10/2025
Special inspection requirement — Seismic Isolation Systems
FAHAD FATEH
01/10/2025
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
01/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
01/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
Latest 60 of 123 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBH GENERAL CONTRACTING IN09/09/2024
DOB NOWSprinklersSigned-offAMM GEN'L CONTRACTING.INC09/06/2024
DOB NOWPlumbingPermit IssuedAMM GEN'L CONTRACTING INC09/06/2024
1 project · most recent 07/08/2025
Sprinkler System
FiledStatusContractorScope
07/08/2025Signed-offAMM GEN'L CONTRACTING.INCSprinkler System
1 project · most recent 07/08/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/08/2025Permit IssuedAMM GEN'L CONTRACTING INCGas, Storm, Water/Sanitary
1 project · most recent 01/16/2025
General Wiring
FiledStatusContractorScope
01/16/2025CompleteACCURATE ELEC'L CORP.General Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
05/29/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/23/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/19/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
05/19/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/25/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/21/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/03/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/01/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/01/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 51
DateRequirementInspectorRole
08/22/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
08/22/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
08/22/2025Seismic Isolation SystemsFAHAD FATEHspecial
08/22/2025Post-installed AnchorsFAHAD FATEHspecial
08/22/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
08/22/2025Sprinkler SystemsFAHAD FATEHspecial
07/02/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
07/02/2025Sprinkler SystemsFAHAD FATEHspecial
07/02/2025Seismic Isolation SystemsFAHAD FATEHspecial
07/02/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
07/02/2025Post-installed AnchorsFAHAD FATEHspecial
07/02/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
04/22/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/22/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
04/22/2025MeteringFAHAD FATEHenergy_progress
04/22/2025Fenestration areasFAHAD FATEHenergy_progress
04/22/2025Fenestration air leakageFAHAD FATEHenergy_progress
04/22/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
04/22/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
04/22/2025Interior lighting powerFAHAD FATEHenergy_progress
04/22/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
04/22/2025Maintenance informationFAHAD FATEHenergy_progress
04/22/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
01/10/2025Post-installed AnchorsFAHAD FATEHspecial
01/10/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
Latest 25 of 51.
▾Documents — 50 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/21/2026X00873105-S1Request digital key ↗
08/21/2026X00873105-P1Request digital key ↗
08/15/2026X00873105-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram3
08/15/2026X00873105-I1Open ↗
08/13/2026X00873105-P1Open ↗
08/13/2026X00873105-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/15/2026X00873105-I1Open ↗
08/13/2026X00873105-P2Open ↗
▸Seals & Professional Certifications21
▸DOB NOWProgress Inspector Seal & Signature9
09/27/2026X00873105-P3Open ↗
09/01/2026X00873105-P5Open ↗
09/01/2026X00873105-S1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/27/2026X00873105-P3Open ↗
09/01/2026X00873105-P5Open ↗
09/01/2026X00873105-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/21/2026X00873105-P2Open ↗
08/21/2026X00873105-P5Open ↗
08/21/2026X00873105-P3Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/21/2026X00873105-P1Open ↗
08/15/2026X00873105-P2Open ↗
08/15/2026X00873105-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/15/2026X00873105-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/21/2026X00873105-S1Open ↗
08/15/2026X00873105-I1Open ↗
▸Other Documents12
▸DOB NOWProperty Ownership Certification3
08/21/2026X00873105-P1Open ↗
08/15/2026X00873105-P2Open ↗
08/15/2026X00873105-I1Open ↗
▸DOB NOWSite Survey: Initial3
08/15/2026X00873105-I1Open ↗
08/13/2026X00873105-P1Open ↗
08/13/2026X00873105-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/15/2026X00873105-I1Open ↗
08/13/2026X00873105-P2Open ↗
08/13/2026X00873105-P1Open ↗
▸DOB NOWPlot Diagram3
08/15/2026X00873105-I1Open ↗
08/13/2026X00873105-P1Open ↗
08/13/2026X00873105-P2Open ↗